ROADWORKS SUMMARY
Yew Tree Lane, HARROGATE, HG2 9JX
Introduction
View current and future planned roadworks and road closures for Yew Tree Lane, HG2 9JX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Yew Tree Lane, HARROGATE, HG2 9JX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Yew Tree Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
20 Dec 2024
North Yorkshire County Council are carrying out Highway repair and maintenance works on Station Bridge, Harrogate.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 October 2023 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 17 Sep 2024 at 10:27.
23 Dec 2024
Northern Powergrid (Northeast) are carrying out New service connection on Jenny Field Drive, Harrogate.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Sep 2024 at 11:42.
Friday
North Yorkshire County Council are carrying out Highway repair and maintenance works on Whinney Lane, Harrogate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 October 2024 at 07:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 26 Nov 2024 at 09:53.
28 Oct and 16 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thistle Hill, Knaresborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Aug 2024 at 10:30.
29 Oct and 5 Dec 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcock Close, Pannal.
These works were categorised as Major.
The works were originally planned to start 29 October 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Oct 2024 at 10:29.
Friday
Northern Powergrid (Northeast) are carrying out New service connection on Prospect Road, Harrogate.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:15 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 09:18.
Friday
Northern Powergrid (Northeast) are proposing to carry out New service connection on Prospect Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 1 Nov 2024 at 11:22.
Friday
Northern Powergrid (Northeast) were proposing to carry out New service connection on Prospect Road, Harrogate.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:00.
Friday
Northern Powergrid (Northeast) are carrying out New service connection on First Avenue, Harrogate.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:15 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 09:18.
Friday
Northern Powergrid (Northeast) are proposing to carry out New service connection on First Avenue, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 1 Nov 2024 at 11:27.
Friday
Northern Powergrid (Northeast) were proposing to carry out New service connection on First Avenue, Harrogate.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:02.
5 Dec 2024
North Yorkshire County Council are carrying out Highway repair and maintenance works on St Leonards Road, Harrogate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 25 Nov 2024 at 14:11.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Cold Bath Road, Harrogate.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 12:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 11:36.
5 Dec 2024
North Yorkshire County Council are carrying out Highway repair and maintenance works on Oaker Bank, Killinghall.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 11:44 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 19 Nov 2024 at 14:23.
12 Dec 2024
Northern Powergrid (Northeast) are carrying out Utility asset works on Kingsley Drive, Harrogate.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 08:00 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Nov 2024 at 08:47.
Friday
North Yorkshire County Council are carrying out Highway repair and maintenance works on St Hildas Road, Harrogate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 20 Nov 2024 at 09:41.
Friday
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on St Hildas Road, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 11 Nov 2024 at 17:09.
14 Nov and 13 Dec 2024
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Kingsley Drive, Harrogate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 13:30.
14 Nov and 13 Dec 2024
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Kingsley Drive, Harrogate.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:04.
15 Nov and 7 Dec 2024
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ripon Road, Killinghall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 22 Oct 2024 at 11:57.
18 Nov and 8 Dec 2024
Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Aug 2024 at 16:17.
13 Dec 2024
Northern Powergrid (Northeast) are carrying out Utility asset works on Coppice Drive, Harrogate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Nov 2024 at 08:56.
18 Nov and 13 Dec 2024
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Coppice Drive, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Nov 2024 at 09:21.
18 Nov and 13 Dec 2024
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Coppice Drive, Harrogate.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Oct 2024 at 11:48.
20 Nov and 6 Dec 2024
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ripon Road, Killinghall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 12 Nov 2024 at 11:09.
25 Nov and 11 Dec 2024
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ripon Road, Killinghall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 22 Nov 2024 at 11:29.
25 Nov and 11 Dec 2024
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ripon Road, Killinghall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 22 Nov 2024 at 15:38.
25 Nov 2024 and 6 Jan 2025
North Yorkshire County Council were proposing to carry out Highway repair and maintenance works on New Road, Scotton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 6 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 13 Nov 2024 at 07:32.
5 and 19 Dec 2024
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on St Helens Road, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 11 Nov 2024 at 17:11.
9 and 20 Dec 2024
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Tentergate Road, Knaresborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Nov 2024 at 10:26.
9 and 11 Dec 2024
Network Rail were proposing to carry out Works for Rail Purposes on Waterside, Knaresborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Oct 2024 at 15:03.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 26 Sep 2024 at 10:16.
6 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:05.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rossett Green Lane, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 15:20.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Pannal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 15:20.
6 Jan and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Aug 2024 at 12:28.
6 Jan and 21 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Roundabout To Braham Hall, Plompton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 6 Sep 2024 at 13:18.
6 Jan and 3 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on High Street, Harrogate.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 11:58.
6 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Harrogate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 16:08.
6 Jan and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Aug 2024 at 08:56.
6 and 24 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on Kings Road, Harrogate.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:08.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 24 Oct 2024 at 14:20.
6 and 27 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 07:49.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 15:19.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leadhall Lane, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 15:18.
13 and 17 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 14:24.
13 and 17 Jan 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Waterside, Knaresborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 13:28.
13 and 17 Jan 2025
North Yorkshire County Council are proposing to carry out Section 50 on Kingsley Drive, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 19 Nov 2024 at 15:37.
13 and 17 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Nov 2024 at 09:37.
20 and 28 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 15:59.
20 and 28 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Nov 2024 at 09:42.
27 Jan and 21 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 17:01.
27 and 30 Jan 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on St Helens Road, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 26 Nov 2024 at 11:26.
10 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Forest Lane Head, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 09:44.
15 and 23 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Tentergate Road, Knaresborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 15:03.
17 Feb and 22 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 12:35.
17 Feb and 22 Apr 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 13:49.
17 Feb and 10 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 11:46.
24 Feb and 17 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Spofforth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 1 Aug 2024 at 10:50.
24 Feb and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bogs Lane, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 13:31.
24 Feb and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 10:07.
24 Feb and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenfields Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 13:34.
Roadworks Map near to Yew Tree Lane, HARROGATE, HG2 9JX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Yew Tree Lane, HARROGATE, HG2 9JX (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 7 Oct 2024 - 29 Nov 2024)
(Scheduled: 18 Nov 2024 - 6 Dec 2024)
(Scheduled: 18 Nov 2024 - 20 Dec 2024)
(Scheduled: 18 Nov 2024 - 29 Nov 2024)
(Scheduled: 18 Nov 2024 - 29 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.