ROADWORKS SUMMARY
High Street, HARROGATE, HG2 7HY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for High Street, HG2 7HY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to High Street, HARROGATE, HG2 7HY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for High Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Yorkshire County Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Station Bridge

North Yorkshire County Council are carrying out Highway repair and maintenance works on Station Bridge, Harrogate.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 09:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 28 Nov 2024 at 09:47.

Northern Powergrid (Northeast) logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Jenny Field Drive

Northern Powergrid (Northeast) are carrying out New service connection on Jenny Field Drive, Harrogate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Dec 2024 at 13:25.

North Yorkshire County Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Bar Lane

North Yorkshire County Council are carrying out Highway improvement works on Bar Lane, Knaresborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 09:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Oct 2024 at 09:36.

North Yorkshire County Council logo
LONG TERM
Between
9 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Bar Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Bar Lane, Knaresborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 7 Aug 2024 at 09:32.

North Yorkshire County Council logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
St Hildas Road

North Yorkshire County Council are carrying out Highway repair and maintenance works on St Hildas Road, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:00 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 28 Nov 2024 at 11:01.

North Yorkshire County Council logo
LONG TERM
Until
16 Jan 2025
Details
View Map
Share
Follow
St Winifreds Road

North Yorkshire County Council are carrying out Highway repair and maintenance works on St Winifreds Road, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:30 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Dec 2024 at 14:46.

North Yorkshire County Council logo
LONG TERM
Between
25 Nov 2024 and 6 Jan 2025
Details
View Map
Share
New Road

North Yorkshire County Council were proposing to carry out Highway repair and maintenance works on New Road, Scotton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 6 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 13 Nov 2024 at 07:32.

North Yorkshire County Council logo
Until
30 Jan 2025
Details
View Map
Share
Follow
St Helens Road

North Yorkshire County Council are carrying out Highway repair and maintenance works on St Helens Road, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 12:00 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Dec 2024 at 11:26.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Roundabout To Braham Hall

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Roundabout To Braham Hall, Plompton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 Sep 2024 at 13:18.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:05.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Aug 2024 at 12:28.

Northern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
High Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on High Street, Harrogate.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 11:58.

Northern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 16:08.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Aug 2024 at 08:56.

Northern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Hookstone Chase

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 07:49.

Northern Powergrid (Northeast) logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Grove Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Grove Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Dec 2024 at 13:42.

Northern Powergrid (Northeast) logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Grove Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Grove Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Dec 2024 at 14:58.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Kings Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Kings Road, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:08.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 26 Sep 2024 at 10:16.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 24 Oct 2024 at 14:20.

Northern Gas Networks logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Harlow Moor Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harlow Moor Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Dec 2024 at 14:04.

North Yorkshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Kingsley Drive

North Yorkshire County Council are proposing to carry out Section 50 on Kingsley Drive, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 24 Dec 2024 at 12:37.

Yorkshire Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Waterside

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Waterside, Knaresborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 13:28.

Northern Powergrid (Northeast) logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Fairfax Avenue

Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Dec 2024 at 09:57.

North Yorkshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Kingsley Drive

North Yorkshire County Council are proposing to carry out Section 50 on Kingsley Drive, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 14:45.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Fairfax Avenue

Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Dec 2024 at 11:22.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Fairfax Avenue

Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 14:24.

North Yorkshire County Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Pannal Ash Road

North Yorkshire County Council are proposing to carry out Section 50 on Pannal Ash Road, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 10 Dec 2024 at 13:41.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Hookstone Chase

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 13:21.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Plompton Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Plompton Drive, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 12:16.

Network Rail logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Forest Lane

Network Rail are proposing to carry out Works for Rail Purposes on Forest Lane, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Dec 2024 at 14:46.

Northern Powergrid (Northeast) logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Grayston Plain Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Dec 2024 at 11:50.

Northern Powergrid (Northeast) logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Grayston Plain Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Dec 2024 at 12:35.

Northern Powergrid (Northeast) logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Grayston Plain Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 15:59.

Yorkshire Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Bryony Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bryony Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Dec 2024 at 15:07.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
York Place

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 17:01.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
York Place

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Dec 2024 at 15:04.

Northern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Forest Lane Head

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Forest Lane Head, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 11:26.

Northern Powergrid (Yorkshire) logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
York Place

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Dec 2024 at 14:55.

North Yorkshire County Council logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Yew Tree Lane

North Yorkshire County Council are proposing to carry out Section 50 on Yew Tree Lane, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 10 Dec 2024 at 14:18.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Bogs Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bogs Lane, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 15:21.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 14:19.

Northern Powergrid (Yorkshire) logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
York Place

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 14:29.

Northern Powergrid (Northeast) logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Tentergate Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Tentergate Road, Knaresborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Dec 2024 at 15:29.

Northern Powergrid (Northeast) logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Tentergate Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Tentergate Road, Knaresborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Dec 2024 at 10:50.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 22 Apr 2025
Details
View Map
Share
Harrogate Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 13:49.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Jenny Field Drive

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Jenny Field Drive, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Dec 2024 at 09:19.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 22 Apr 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 12:35.

Northern Gas Networks logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Hookstone Chase

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 11:46.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Greenfields Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenfields Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 13:34.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
24 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Ripon Road

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Ripon Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Dec 2024 at 11:34.

Northern Gas Networks logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Spofforth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Aug 2024 at 10:50.

North Yorkshire County Council logo
LONG TERM
Between
3 Mar and 18 Jul 2025
Details
View Map
Share
Follow
Victoria Avenue

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Harrogate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 13 Dec 2024 at 14:28.

Northern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Hookstone Chase

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 12:48.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Woodlands Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Drive, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 13:30.

Northern Powergrid (Northeast) logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Truro Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Truro Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 12 Dec 2024 at 11:36.

Northern Gas Networks logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Green Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 10:16.

Northern Gas Networks logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Leadhall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leadhall Lane, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 10:18.

Northern Gas Networks logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Rossett Green Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rossett Green Lane, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 10:37.

Northern Gas Networks logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Church Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Pannal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 10:37.

Northern Gas Networks logo
Between
24 Mar and 14 Apr 2025
Details
View Map
Share
Hookstone Chase

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 14 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 11:45.


Roadworks Map near to High Street, HARROGATE, HG2 7HY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Dec 2024 06:34
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to High Street, HARROGATE, HG2 7HY (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
URGENT
  
BACK REGENT PLACE 
(0.3 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
Complete
19 Dec 2024 08:12 - 20 Dec 2024 16:33
0.3
Details
Share
2
Northern Gas Networks logo
MAJOR
  
HILLBANK GROVE 
(0.5 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Complete
16 Sep 2024 09:00 - 17 Oct 2024 11:30
0.5
Details
Share
3
Northern Gas Networks logo
MAJOR
  
BOGS LANE 
(0.5 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 23 Sep 2024 - 30 Dec 2024
0.5
Details
Share
Follow
4
North Yorkshire County Council logo
MAJOR
  
ST HILDAS ROAD 
(1.0 miles)
North Yorkshire County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 14 Nov 2024 08:00
(Scheduled: 14 Nov 2024 - 13 Jan 2025)
1.0
Details
Share
Follow