The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Woodhead Road, HOLMFIRTH, HD9 2AL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woodhead Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Station Road, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:54.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Bus Station, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:54.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Town Gate, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:54.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Victoria Street, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:56.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Huddersfield Road, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:57.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Victoria Square, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:55.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Dunford Road, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:55.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Greenfield Road, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:56.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Hollowgate, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 17 Apr 2024 at 09:15.
6 May 2024
Kirklees Council are carrying out Section 50 on Miry Lane, Netherthong, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 08:00 and could run through until 6 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 15 Apr 2024 at 11:51.
7 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Wickins Lane, Upperthong, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 14:50 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2024 at 14:58.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Stocks Moor Road, Stocksmoor, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 15:29 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Mar 2024 at 15:45.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Stocksmoor, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 15:28 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Mar 2024 at 15:46.
5 Jun 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Birks Lane, Stocksmoor, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 15:30 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Apr 2024 at 08:19.
30 May 2024
Northern Powergrid (Yorkshire) are carrying out New service connection on Northgate, Honley, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 April 2024 at 08:00 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Apr 2024 at 08:15.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Lane, Berry Brow, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Mar 2024 at 12:55.
18 Jun 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on School Lane, Berry Brow, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 09:00 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 10:27.
7 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Wickins Lane, Holmfirth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 09:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 10:21.
17 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Sude Hill, New Mill, Holmfirth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 09:00 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Apr 2024 at 09:53.
1 Jul 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Fulstone Hall Lane, New Mill, Holmfirth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 09:00 and could run through until 1 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 10:22.
Tuesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Moorbottom, Honley, Holmfirth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 April 2024 at 07:30 and could run through until 30 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Apr 2024 at 08:31.
Wednesday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 Jan 2024 at 07:47.
24 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Grange Lane, Kirkburton, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 09:00 and could run through until 24 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2024 at 09:09.
22 Apr and 5 May 2024
Kirklees Council are proposing to carry out roadworks on Moor Lane, Farnley Tyas, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 14 Dec 2023 at 07:21.
22 Apr and 5 May 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Greenside Road, Thurstonland, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 21 Dec 2023 at 16:30.
22 Apr and 5 May 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Thurstonland Road, Farnley Tyas, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 21 Dec 2023 at 16:30.
22 Apr and 5 May 2024
Kirklees Council are proposing to carry out roadworks on Brockholes Road, Farnley Tyas, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 14 Dec 2023 at 07:19.
29 Apr and 17 May 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Burnlee Road, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 26 Apr 2024 at 08:12.
6 and 10 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Yew Tree Lane, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Mar 2024 at 11:06.
7 and 10 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cold Hill Lane, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Apr 2024 at 13:27.
7 and 29 May 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Meltham, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Feb 2024 at 10:12.
8 and 10 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Fairfields Road, Holmbridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Mar 2024 at 11:01.
13 and 17 May 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on New Mill Road, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 17 Apr 2024 at 06:43.
13 and 31 May 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Acres Lane, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 26 Mar 2024 at 10:34.
13 and 31 May 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Dean Lane, Hepworth, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 4 Apr 2024 at 11:18.
13 and 31 May 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Butterley Lane, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 25 Mar 2024 at 10:43.
14 and 21 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenhill Bank Road, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 23 Apr 2024 at 08:30.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Banks Road, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 07:22.
20 May and 26 Jul 2024
Kirklees Council are proposing to carry out roadworks on St Johns Avenue, Newsome, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 18 Mar 2024 at 13:00.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Woodhead Road, Thongsbridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Apr 2024 at 07:56.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on New Mill Road, Brockholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Apr 2024 at 07:57.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Far End Lane, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 07:21.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Woodhead Road, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Apr 2024 at 07:56.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on New Mill Road, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Apr 2024 at 07:57.
20 May and 17 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Street, Berry Brow, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Apr 2024 at 10:03.
20 and 24 May 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Cross Lane, Stocksmoor, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 23 Apr 2024 at 06:22.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Upper Hagg Road, Thongsbridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 07:35.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Thurstonland Bank Road, Brockholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Apr 2024 at 08:21.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Dean Brook Road, Netherthong, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 07:36.
20 May and 28 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellgreave Avenue, New Mill, Holmfirth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Mar 2024 at 14:27.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Stalley Royd Lane, Jackson Bridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 07:57.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Tenter Hill, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 07:56.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Cross Lane, Stocksmoor, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 06:04.
20 May and 30 Sep 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on South View, Jackson Bridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 07:58.
21 May and 7 Jun 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Heath Road, Linthwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 4 Apr 2024 at 11:42.
27 and 31 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cemetery Road, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Feb 2024 at 14:52.
2 and 12 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lingards Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 12 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 17 Apr 2024 at 11:06.
3 and 7 Jun 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Norridge Bottom, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Mar 2024 at 13:15.
3 Jun and 26 Jul 2024
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Honley Road, Farnley Tyas, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Feb 2024 at 10:20.
3 and 14 Jun 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Modd Lane, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 4 Apr 2024 at 11:16.
10 Jun and 19 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Horn Lane, New Mill, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Mar 2024 at 14:29.
10 Jun and 19 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sude Hill, New Mill, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Mar 2024 at 11:07.
10 Jun and 19 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Sude Hill Road, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Mar 2024 at 14:28.
10 Jun and 19 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fulstone Hall Lane, New Mill, Holmfirth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Mar 2024 at 14:28.
17 and 21 Jun 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cul-de-sac Off Butterley Lane Including Access To 25-61, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Apr 2024 at 07:31.
18 Jun and 5 Jul 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Netherton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Apr 2024 at 10:23.
18 Jun and 5 Jul 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Hanson Lane, Lockwood, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 12 Apr 2024 at 07:48.
18 Jun and 5 Jul 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Beaumont Park Road, Beaumont Park, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 22 Apr 2024 at 10:49.
18 Jun and 5 Jul 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Butternab Road, Beaumont Park, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 22 Apr 2024 at 10:54.
18 and 20 Jun 2024
BT are proposing to carry out Utility asset works on Hall Ing Lane, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 23 Apr 2024 at 09:05.
25 and 28 Jun 2024
Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Berry Brow, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Apr 2024 at 09:45.
1 and 12 Jul 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Taylor Hill Road, Berry Brow, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 23 Apr 2024 at 07:49.
1 and 12 Jul 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Taylor Hill Road, Taylor Hill, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 23 Apr 2024 at 07:26.
2 and 5 Jul 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Stalley Royd Lane, Jackson Bridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 2 Apr 2024 at 10:52.
2 and 5 Jul 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on South View, Jackson Bridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 2 Apr 2024 at 10:42.
8 and 12 Jul 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Lightenfield Lane, Netherton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 23 Apr 2024 at 11:23.
8 Jul and 2 Aug 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Fronting 172-182 Meltham Road, Lockwood, Huddersfield.
These works are categorised as Major.
The works will start on or after 8 July 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Apr 2024 at 13:29.
8 Jul and 2 Aug 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 184-192 Meltham Road, Lockwood, Huddersfield.
These works are categorised as Major.
The works will start on or after 8 July 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Apr 2024 at 13:30.
8 Jul and 2 Aug 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 172 Meltham Road, Lockwood, Huddersfield.
These works are categorised as Major.
The works will start on or after 8 July 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Apr 2024 at 13:28.
22 Jul and 2 Aug 2024
BT are proposing to carry out New service connection on Barber Row, Linthwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 4 Apr 2024 at 10:27.
22 Jul and 2 Aug 2024
BT are proposing to carry out New service connection on Hoyle Ing, Linthwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 4 Apr 2024 at 10:25.
Roadworks Map near to Woodhead Road, HOLMFIRTH, HD9 2AL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Woodhead Road, HOLMFIRTH, HD9 2AL (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Apr 2024 - 2 May 2024)
(Scheduled: 25 Mar 2024 - 7 May 2024)
(Scheduled: 25 Mar 2024 - 7 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.