ROADWORKS SUMMARY
Aveley Lane, FARNHAM, GU9 8PN
Introduction

View current and future planned roadworks and road closures for Aveley Lane, GU9 8PN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Aveley Lane, FARNHAM, GU9 8PN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Aveley Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Station Hill, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:36.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Farnham By-pass, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:38.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Longbridge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:42.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Lower Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:43.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Union Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Upper Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:45.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:40.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on West Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:46.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Downing Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:44.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Bear Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on The Borough, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Woolmead, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:49.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on East Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:50.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Castle Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:47.
12 Sep 2025
Surrey County Council are carrying out Highway repair and maintenance works on Suffield Lane, Puttenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 07:00 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Jul 2025 at 12:09.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Station Hill, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:56.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Farnham By-pass, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:52.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Longbridge, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:54.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Lower Church Lane, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:55.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Upper Church Lane, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:57.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on South Street, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:55.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Union Road, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:57.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on West Street, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:57.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Victoria Road, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:57.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Downing Street, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:53.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on The Borough, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:56.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Bear Lane, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:52.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway repair and maintenance works on Woolmead, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:58.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on East Street, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:53.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Park Row, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:55.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on High Park Road, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 10:11.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on Castle Street, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:52.
3 Feb and 24 Dec 2025
Hampshire County Council are proposing to carry out Works for road purposes on Denmark Street, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 5 Dec 2024 at 12:04.
29 Nov 2025
Surrey County Council are carrying out Highway repair and maintenance works on Downing Street, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 20:00 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Jul 2025 at 10:42.
17 Feb and 29 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Downing Street, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:06.
17 Feb and 29 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on West Street, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:09.
29 Nov 2025
Surrey County Council are carrying out Highway repair and maintenance works on West Street, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 20:00 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Jul 2025 at 10:41.
17 Feb and 29 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on The Borough, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:08.
29 Nov 2025
Surrey County Council are carrying out Highway repair and maintenance works on The Borough, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 20:00 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Mar 2025 at 12:22.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 14:04.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 13:27.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Frensham Heights Road, Rowledge, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 14:15.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Little Green Lane, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 14:19.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Upper Way, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 09:45.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Union Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:26.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:17.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hale Road, Lower Hale, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:27.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hale Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:24.
1 May and 1 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 13:37.
31 Oct 2025
Surrey County Council are carrying out Highway repair and maintenance works on Crondall Lane, Dippenhall, Farnham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 May 2025 at 12:50 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 08:35.
5 May and 20 Sep 2025
Surrey County Council are proposing to carry out Works for road purposes on Foreman Road, Ash.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 20 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 2 May 2025 at 09:42.
18 Oct 2025
Surrey County Council are carrying out Works for road purposes on Foreman Road, Ash.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 May 2025 at 08:00 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 07:34.
5 May and 20 Sep 2025
Surrey County Council are proposing to carry out Works for road purposes on Ash Green Road, Ash Green, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 20 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 2 May 2025 at 09:43.
18 Oct 2025
Surrey County Council are carrying out Works for road purposes on Ash Green Road, Ash Green, Guildford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 May 2025 at 08:00 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 09:44.
Tomorrow
Surrey County Council are proposing to carry out Highway repair and maintenance works on Longbridge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:03.
Tomorrow
Surrey County Council were proposing to carry out Highway repair and maintenance works on Longbridge, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 8 Apr 2025 at 12:38.
Tomorrow
Surrey County Council are proposing to carry out Highway repair and maintenance works on Union Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:01.
Tomorrow
Surrey County Council were proposing to carry out Highway repair and maintenance works on Union Road, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 8 Apr 2025 at 12:43.
26 Sep 2025
Surrey County Council are carrying out Highway repair and maintenance works on Union Road, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 07:30 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 May 2025 at 09:09.
31 May and 30 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Weydon Lane Industrial Estate Townpath, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2025 and could run through until 30 November 2025. The works will impact the footpath only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 3 Apr 2025 at 07:42.
2 Jun and 19 Sep 2025
Hampshire County Council are proposing to carry out Works for road purposes on Farnham Road, Odiham, Hook.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 27 Mar 2025 at 13:37.
12 Jun and 29 Sep 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Longbridge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 16 May 2025 at 14:44.
Tomorrow
Hampshire County Council are carrying out Highway repair and maintenance works on North Lane, Aldershot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 July 2025 at 09:30 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 1 Sep 2025 at 09:22.
21 Jul and 26 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thursley Road, Elstead, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 07:46.
26 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Thursley Road, Elstead, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 16:10 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 16:15.
4 Aug and 14 Sep 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hurlands Close, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 24 Jul 2025 at 08:36.
4 Aug and 14 Sep 2025
Surrey County Council are proposing to carry out Highway improvement works on Badshot Lea Road, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 14 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 21 Jul 2025 at 08:45.
4 Aug and 14 Sep 2025
Surrey County Council are proposing to carry out Highway improvement works on Badshot Lea Road, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 14 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 4 Jun 2025 at 10:22.
4 Aug and 14 Sep 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Monkton Lane, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 24 Jul 2025 at 08:35.
29 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 12:50 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 14:38.
11 Aug and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 11:58.
11 Aug and 22 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Princes Way, Aldershot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:25.
11 Aug and 22 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hospital Hill, Aldershot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:22.
11 Aug and 24 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gally Hill Road, Church Crookham, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:53.
11 Aug and 24 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gally Hill Road, Church Crookham, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 08:26.
24 Dec 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Gally Hill Road, Church Crookham, Fleet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 09:55 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 10:00.
18 Aug 2025 and 6 Mar 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Drive, Church Crookham, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 15:36.
6 Mar 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Portland Drive, Church Crookham, Fleet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 09:20 and could run through until 6 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 09:37.
Friday
Thames Water are carrying out Utility repair and maintenance works on Queens Road, Aldershot.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 10:00 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Aug 2025 at 16:02.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Monks Walk, Farnham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 August 2025 at 08:00 and could run through until 4 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 14:31.
20 Sep 2025
Surrey County Council are carrying out Highway repair and maintenance works on Hurlands Close, Farnham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 09:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 26 Aug 2025 at 09:55.
20 Sep 2025
Surrey County Council are carrying out Highway improvement works on Badshot Lea Road, Farnham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 09:00 and could run through until 20 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 26 Aug 2025 at 09:55.
20 Sep 2025
Surrey County Council are carrying out Highway repair and maintenance works on Monkton Lane, Farnham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 09:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 26 Aug 2025 at 09:55.
Monday
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on St Georges Road, Badshot Lea, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Jun 2025 at 09:33.
Friday
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Green Cross Lane, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jun 2025 at 09:36.
Friday
Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Green Cross Lane, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Aug 2025 at 12:08.
Friday
Scottish Hydro Electric Power Dis are carrying out New service connection on Green Cross Lane, Churt, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:02 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Sep 2025 at 08:03.
1 Sep 2025 and 2 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 2 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:10.
Friday
South East Water are proposing to carry out Utility repair and maintenance works on Froyle Road, Lower Froyle, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 13 Jun 2025 at 15:15.
Friday
South East Water are proposing to carry out Utility repair and maintenance works on Froyle Road, Lower Froyle, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 24 Jun 2025 at 14:24.
1 Sep 2025 and 2 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 2 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 12:54.
1 Sep and 13 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnborough Road, Aldershot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:27.
1 Sep and 13 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fleet Road, Aldershot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:30.
2 and 17 Sep 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Dippenhall Street, Crondall, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2025 and run through until 17 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Aug 2025 at 14:03.
Friday
South East Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 12 May 2025 at 07:29.
Friday
South East Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 20 May 2025 at 07:54.
Friday
South East Water are carrying out Utility repair and maintenance works on Mount Pleasant Road, Aldershot.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 11:10 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 2 Sep 2025 at 13:05.
Saturday
Surrey County Council are proposing to carry out Highway improvement works on Alton Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 6 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 22 Jul 2025 at 07:16.
Saturday
Surrey County Council are proposing to carry out Highway improvement works on Alton Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 6 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 1 Aug 2025 at 07:39.
Tomorrow
Surrey County Council were proposing to carry out Highway repair and maintenance works on Farnham Bridleway 123/40, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were scheduled for 4 September 2025 The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 8 Aug 2025 at 15:54.
5 and 17 Sep 2025
Hampshire County Council are proposing to carry out Highway improvement works on North Lane, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 19 Jun 2025 at 09:28.
8 Sep and 31 Oct 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Farnham Road, Tilford, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2025 at 12:46.
8 Sep and 17 Oct 2025
Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Farnham Road, Tilford, Farnham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2025 at 14:10.
8 Sep and 17 Oct 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Farnham Road, Tilford, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 12:11.
8 and 17 Sep 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hill Farm Lane, Bentley, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Jul 2025 at 10:37.
8 and 17 Sep 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hill Farm Lane, Bentley, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 5 Aug 2025 at 10:39.
8 Sep and 3 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Runfold Diversion, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Jul 2025 at 09:48.
8 Sep and 3 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Runfold Diversion, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 08:26.
8 and 23 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dippenhall Street, Crondall, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Aug 2025 at 07:54.
8 and 21 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dippenhall Street, Crondall, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 15:28.
8 Sep and 3 Oct 2025
Indigo Power are proposing to carry out Utility asset works on Church Lane, Ewshot, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Indigo Power on 29 Jul 2025 at 15:24.
8 Sep and 3 Oct 2025
Indigo Power are proposing to carry out Utility asset works on Church Lane, Ewshot, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Indigo Power on 31 Jul 2025 at 08:35.
8 Sep and 3 Oct 2025
Indigo Power are proposing to carry out Utility asset works on Church Lane, Ewshot, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Indigo Power on 31 Jul 2025 at 12:47.
9 and 17 Sep 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lower Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:00.
10 and 12 Sep 2025
BT are proposing to carry out Utility asset works on Churt Road, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 12 September 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 16 Apr 2025 at 11:23.
10 and 14 Sep 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 08:54.
10 and 14 Sep 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 12:30.
15 and 19 Sep 2025
Network Rail are proposing to carry out Works for Rail Purposes on Blacknest Road, Binsted, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 3 Jun 2025 at 10:36.
15 and 19 Sep 2025
Network Rail were proposing to carry out Works for Rail Purposes on Blacknest Road, Binsted, Alton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 17 Jul 2025 at 09:42.
15 Sep and 3 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 09:58.
15 Sep and 3 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Aug 2025 at 08:41.
15 and 17 Sep 2025
South East Water were proposing to carry out New service connection on Waverley Lane, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 17 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 26 Jun 2025 at 13:59.
15 Sep and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Oxenden Court, Tongham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 9 Apr 2025 at 13:27.
15 and 18 Sep 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Ewshot Lane, Ewshot, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the verge only.
This roadwork event was last updated by Hampshire County Council on 3 Sep 2025 at 11:59.
16 and 20 Sep 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Milford Road, Elstead, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Aug 2025 at 12:37.
22 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 9 Jul 2025 at 09:45.
22 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Sep 2025 at 08:13.
22 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Kennel Lane, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 9 Jul 2025 at 09:44.
22 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Kennel Lane, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Sep 2025 at 08:12.
22 Sep and 3 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Burnt Hill Road, Lower Bourne, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Jul 2025 at 11:43.
22 Sep and 10 Oct 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Doras Green Lane, Crondall, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 13 Aug 2025 at 14:17.
22 Sep and 10 Oct 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Doras Green Lane, Crondall, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 13 Aug 2025 at 16:49.
22 Sep and 10 Oct 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Doras Green Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 13 Aug 2025 at 14:17.
22 Sep and 10 Oct 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Doras Green Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 13 Aug 2025 at 16:50.
22 and 24 Sep 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Pankridge Street, Crondall, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Aug 2025 at 13:35.
22 Sep and 3 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Poyle Road, Tongham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Jun 2025 at 15:04.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 12:32.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:03.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 12:39.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:22.
29 Sep and 3 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lower Weybourne Lane, Badshot Lea, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway only.
This roadwork event was last updated by Surrey County Council on 15 Aug 2025 at 15:34.
29 Sep and 10 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Poyle Road, Tongham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 18 Aug 2025 at 13:17.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Carlton Crescent, Church Crookham, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 24 Jun 2025 at 15:36.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Carlton Crescent, Church Crookham, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 2 Jul 2025 at 07:12.
6 and 14 Oct 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Picketts Hill, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 23 Jul 2025 at 15:45.
6 and 14 Oct 2025
Hampshire County Council are proposing to carry out Highway improvement works on Picketts Hill, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 29 Jul 2025 at 10:50.
6 and 10 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Milford Road, Elstead, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 12:16.
6 and 10 Oct 2025
South East Water are proposing to carry out Utility repair and maintenance works on Froyle Road, Lower Froyle, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 2 Sep 2025 at 14:28.
6 Oct and 7 Nov 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Farnham Road, Tilford, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Aug 2025 at 08:34.
6 Oct and 7 Nov 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Farnham Road, Tilford, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 11:02.
6 and 10 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Burnt Hill Road, Wrecclesham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jul 2025 at 08:00.
6 Oct and 30 Nov 2025
Surrey County Council are proposing to carry out Works for road purposes on Hale Road, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 30 November 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by Surrey County Council on 18 Aug 2025 at 08:06.
6 Oct and 30 Nov 2025
Surrey County Council are proposing to carry out Works for road purposes on Hale Road, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 30 November 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by Surrey County Council on 18 Aug 2025 at 08:07.
6 Oct 2025 and 15 Jan 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Green Lane, Badshot Lea, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 15 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Aug 2025 at 08:31.
6 Oct 2025 and 15 Jan 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Green Lane, Badshot Lea, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 15 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2025 at 07:44.
6 Oct 2025 and 20 Feb 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aldershot Road, Church Crookham, Fleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:57.
8 and 10 Oct 2025
BT are proposing to carry out Utility asset works on Churt Road, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 13 Jun 2025 at 15:02.
9 and 20 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Burnt Hill Road, Wrecclesham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 10:25.
13 and 22 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Burnt Hill Road, Wrecclesham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 07:10.
14 Oct 2025 and 14 Mar 2026
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frensham Heights Road, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Jul 2025 at 12:07.
14 Oct 2025 and 14 Mar 2026
Surrey County Council are proposing to carry out Highway repair and maintenance works on Little Green Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Jul 2025 at 13:33.
20 and 27 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Poyle Road, Tongham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Aug 2025 at 11:55.
20 Oct and 7 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Oxenden Court, Tongham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 20 Aug 2025 at 10:46.
22 and 31 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Little Green Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 11:33.
22 and 24 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Cuttmill Road, Shackleford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Sep 2025 at 12:08.
23 Oct and 21 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Star Hill, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:56.
23 Oct and 21 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Star Hill, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 08:26.
25 Oct and 2 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Burnt Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jul 2025 at 08:39.
27 and 31 Oct 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Lane West, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 12 May 2025 at 09:22.
27 and 31 Oct 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Lane West, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 20 May 2025 at 08:00.
27 and 31 Oct 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Lane West, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 23 Jul 2025 at 23:14.
27 Oct and 20 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Street, Ash.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 08:31.
27 Oct and 20 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Church Road, Ash.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 08:46.
1 Nov 2025 and 1 May 2026
Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2025 and could run through until 1 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Aug 2025 at 10:45.
3 Nov 2025 and 7 Jan 2026
Surrey County Council are proposing to carry out Highway repair and maintenance works on White Lane, Ash.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 8 Jul 2025 at 10:24.
10 Nov 2025 and 22 Jan 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 22 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:43.
10 Nov and 12 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakeside Road, Ash Vale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 13:53.
10 Nov and 12 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakeside Road, Ash Vale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 12:09.
10 Nov and 12 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakeside Road, Ash Vale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 13:45.
19 and 21 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Cuttmill Road, Shackleford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 07:51.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2025 at 08:57.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 13 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Jul 2025 at 08:50.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 08:50.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 13 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2025 at 15:42.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Jul 2025 at 08:46.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on High Street, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2025 at 09:00.
24 Nov and 22 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Guildford Road, Ash.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 22 December 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 15:37.
1 Dec 2025 and 7 May 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 7 May 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:42.
1 and 3 Dec 2025
South East Water are proposing to carry out New service connection on Manley Bridge Road, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 27 Aug 2025 at 15:56.
1 and 3 Dec 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Pankridge Street, Crondall, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Aug 2025 at 10:30.
1 and 3 Dec 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Pankridge Street, Crondall, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 12 Aug 2025 at 11:18.
1 and 9 Dec 2025
Hampshire County Council are proposing to carry out Highway improvement works on Birchett Road, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 23 Jan 2025 at 11:17.
1 and 9 Dec 2025
Hampshire County Council are proposing to carry out Highway improvement works on Birchett Road, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Jan 2025 at 15:26.
Roadworks Map near to Aveley Lane, FARNHAM, GU9 8PN (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Aveley Lane, FARNHAM, GU9 8PN (57 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Sep 2025 - 5 Sep 2025)
(Scheduled: 2 Sep 2025 - 5 Sep 2025)
(Scheduled: 11 Aug 2025 - 29 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.