ROADWORKS SUMMARY
Dye House Road, GODALMING, GU8 6QD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Dye House Road, GU8 6QD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Dye House Road, GODALMING, GU8 6QD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Dye House Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Until
1 Feb 2026
Details
View Map
Share
Follow
Puttenham Lane

Surrey County Council are carrying out Highway repair and maintenance works on Puttenham Lane, Shackleford.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 February 2025 at 17:19 and could run through until 1 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Aug 2025 at 15:21.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Tilford Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 14:04.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Tilford Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 13:27.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Frensham Heights Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Frensham Heights Road, Rowledge, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 14:15.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Ockford Ridge

Surrey County Council were proposing to carry out Highway repair and maintenance works on Ockford Ridge, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 11:59.

Surrey County Council logo
LONG TERM
Between
1 May and 1 Nov 2025
Details
View Map
Share
Follow
Tilford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 13:37.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Skinners Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Skinners Lane, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Mar 2025 at 10:18.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 09:54.

Surrey County Council logo
LONG TERM
Between
1 Jul 2025 and 1 Jan 2026
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 1 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Nov 2024 at 10:35.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Thursley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thursley Road, Elstead, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 07:46.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 6 Oct 2025
Details
View Map
Share
Sturt Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sturt Road, Haslemere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 6 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:54.

West Sussex County Council logo
LONG TERM
Between
7 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Bell Road

West Sussex County Council are proposing to carry out roadworks on Bell Road, Fernhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 May 2025 at 12:51.

Surrey County Council logo
LONG TERM
Between
11 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Jul 2025 at 07:08.

Southern Gas Networks logo
LONG TERM
Between
11 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Lodge Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 11:58.

Scottish Hydro Electric Power Dis logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Trout Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Trout Road, Haslemere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2025 at 09:24.

Southern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Wormley Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:00 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:04.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Minster Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Minster Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:25.

Southern Gas Networks logo
Until
25 Sep 2025
Details
View Map
Share
Follow
Minster Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Minster Road, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 10:07.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Summerhouse Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 08:25.

Southern Gas Networks logo
LONG TERM
Between
1 Sep 2025 and 2 Feb 2026
Details
View Map
Share
Farnham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 2 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:10.

Southern Gas Networks logo
LONG TERM
Between
1 Sep 2025 and 2 Feb 2026
Details
View Map
Share
Farnham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 2 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 17 Nov 2025
Details
View Map
Share
Sturt Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sturt Road, Haslemere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 15:35.

Surrey County Council logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 24 Jul 2025 at 08:49.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Critchmere Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Critchmere Lane, Haslemere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 10:07.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Critchmere Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Critchmere Lane, Haslemere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 11:03.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Critchmere Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Critchmere Lane, Haslemere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 08:05.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Critchmere Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Critchmere Lane, Haslemere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 10:09.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Critchmere Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Critchmere Lane, Haslemere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 11:16.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Critchmere Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Critchmere Lane, Haslemere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 10:20.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Trout Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Trout Road, Haslemere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Jul 2025 at 13:23.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Trout Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Trout Road, Haslemere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 10:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Trout Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Trout Road, Haslemere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 10:04.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Crownpits Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Crownpits Lane, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 10:00 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 10:25.

Southern Gas Networks logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Busbridge Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Busbridge Lane, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 10:00 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 10:24.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Summerhouse Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Close, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 08:19.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Farnham Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Farnham Road, Tilford, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2025 at 12:46.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Farnham Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Farnham Road, Tilford, Farnham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2025 at 14:10.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Farnham Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Farnham Road, Tilford, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 12:11.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Vann Lane

Surrey County Council are carrying out Highway repair and maintenance works on Vann Lane, Hambledon, Godalming.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 20:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 08:26.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Tuesley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:06.

Southern Gas Networks logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Grosvenor Road, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 10:25 and could run through until 1 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 10:32.

Southern Gas Networks logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Oakdene Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Oakdene Road, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:30 and could run through until 30 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 12:40.

Southern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Farnham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 09:58.

Southern Gas Networks logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Farnham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:50 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 09:53.

Southern Gas Networks logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Ashstead Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Ashstead Lane, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 15:30 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 15:50.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Milford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Milford Road, Elstead, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Aug 2025 at 12:37.

Surrey County Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2025 at 06:44.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
22 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Critchmere Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Critchmere Lane, Haslemere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2025 at 07:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
22 Sep and 22 Nov 2025
Details
View Map
Share
Follow
Critchmere Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Critchmere Lane, Haslemere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 22 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2025 at 07:43.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
22 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Trout Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Trout Road, Haslemere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2025 at 07:40.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Quartermile Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Quartermile Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 08:16.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Fifield Lane

BT are proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 9 Jul 2025 at 09:45.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Fifield Lane

BT are proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Sep 2025 at 08:13.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Kennel Lane

BT are proposing to carry out Utility asset works on Kennel Lane, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 9 Jul 2025 at 09:44.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Kennel Lane

BT are proposing to carry out Utility asset works on Kennel Lane, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Sep 2025 at 08:12.

Southern Gas Networks logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Ramsden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ramsden Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:50.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Busbridge Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Busbridge Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 07:21.

West Sussex County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hammer Lane

West Sussex County Council are proposing to carry out Highway improvement works on Hammer Lane, Hammer, Linchmere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 24 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 2 Sep 2025 at 13:51.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Wey Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wey Hill, Haslemere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:05.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Kings Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 09:50.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Kings Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 11:19.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Longdene Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Longdene Road, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
29 Sep 2025 and 27 Feb 2026
Details
View Map
Share
Tanners Lane

Southern Gas Networks were proposing to carry out roadworks on Tanners Lane, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:18.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Killinghurst Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Killinghurst Lane, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Jul 2025 at 08:12.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Killinghurst Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Killinghurst Lane, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Sep 2025 at 12:55.

Southern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Lane End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lane End, Hambledon, Godalming.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 14:32.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Ashstead Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashstead Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:14.

Southern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Park Chase

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Chase, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:44.

Southern Gas Networks logo
LONG TERM
Between
29 Sep 2025 and 27 Feb 2026
Details
View Map
Share
Farnham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 12:32.

Southern Gas Networks logo
LONG TERM
Between
29 Sep 2025 and 27 Feb 2026
Details
View Map
Share
Farnham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
29 Sep 2025 and 27 Feb 2026
Details
View Map
Share
Farnham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 12:39.

Southern Gas Networks logo
LONG TERM
Between
29 Sep 2025 and 27 Feb 2026
Details
View Map
Share
Farnham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:22.

Surrey County Council logo
Between
2 and 8 Oct 2025
Details
View Map
Share
Follow
Tennysons Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tennysons Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 10:17.

Surrey County Council logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Tennysons Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tennysons Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2025 at 10:59.

Hampshire County Council logo
Between
6 and 14 Oct 2025
Details
View Map
Share
Spats Lane

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Spats Lane, Headley, Bordon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 14 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 15:23.

Hampshire County Council logo
Between
6 and 14 Oct 2025
Details
View Map
Share
Frensham Lane

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Frensham Lane, Headley, Bordon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 14 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 15:25.

Hampshire County Council logo
Between
6 and 14 Oct 2025
Details
View Map
Share
Follow
Picketts Hill

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Picketts Hill, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 23 Jul 2025 at 15:45.

Surrey County Council logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Milford, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Jul 2025 at 10:22.

Surrey County Council logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Milford, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Jul 2025 at 07:57.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Quartermile Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Quartermile Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:05.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Quartermile Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Quartermile Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Jun 2025 at 09:31.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Quartermile Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Quartermile Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2025 at 09:51.

Southern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Ramsden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ramsden Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 08:28.

Surrey County Council logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Milford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Milford Road, Elstead, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 12:16.

Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Mill Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Mill Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 08:09.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Farnham Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Farnham Road, Tilford, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Aug 2025 at 08:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Farnham Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Farnham Road, Tilford, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2025 at 13:34.

Surrey County Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Churt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 10:09.

Surrey County Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Churt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 11:13.

Surrey County Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Churt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 10:08.

Surrey County Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Churt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 11:13.

BT logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Churt Road

BT are proposing to carry out Utility asset works on Churt Road, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 13 Jun 2025 at 15:02.

Southern Gas Networks logo
LONG TERM
Between
13 Oct 2025 and 30 Jan 2026
Details
View Map
Share
Lower Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lower Street, Haslemere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 30 January 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:09.

Southern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Lane End

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lane End, Hambledon, Godalming.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 13:33.

Surrey County Council logo
LONG TERM
Between
14 Oct 2025 and 14 Mar 2026
Details
View Map
Share
Follow
Frensham Heights Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frensham Heights Road, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Jul 2025 at 12:07.

Surrey County Council logo
LONG TERM
Between
14 Oct 2025 and 14 Mar 2026
Details
View Map
Share
Follow
Ockford Ridge

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockford Ridge, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Jul 2025 at 12:07.

National Highways logo
Between
16 and 28 Oct 2025
Details
View Map
Share
Follow
Guildford - Godalming By-pass

National Highways are proposing to carry out Highway improvement works on Guildford - Godalming By-pass, Shackleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Aug 2025 at 10:59.

National Highways logo
Between
16 and 28 Oct 2025
Details
View Map
Share
Follow
Guildford - Godalming By-pass

National Highways are proposing to carry out Highway improvement works on Guildford - Godalming By-pass, Shackleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Aug 2025 at 15:48.

Network Rail logo
Between
17 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Station Lane

Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Oct 2024 at 09:19.

Network Rail logo
Between
17 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Station Lane

Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Aug 2025 at 11:59.

Surrey County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Bunch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bunch Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 10:11.

Surrey County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Bunch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bunch Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 13:49.

Southern Gas Networks logo
Between
20 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Park Chase

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Chase, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 16 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:21.

Southern Gas Networks logo
Between
20 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Maplehatch Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maplehatch Close, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 16 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 11:59.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 08:12.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Jun 2025 at 09:05.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Oakdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakdene Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 08:07.

Southern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Summerhouse Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Jul 2025 at 07:45.

Southern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Summerhouse Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 07:16.

Southern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Summerhouse Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Close, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:47.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Holloway Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holloway Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 08:54.

Thames Water logo
Between
22 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Cliffe Rise

Thames Water are proposing to carry out roadworks on Cliffe Rise, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 07:35.

Thames Water logo
Between
22 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Eashing Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Eashing Lane, Milford, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 07:34.

Surrey County Council logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Cuttmill Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cuttmill Road, Shackleford, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Sep 2025 at 12:08.

Southern Gas Networks logo
Between
23 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Star Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Star Hill, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:56.

Southern Gas Networks logo
Between
23 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Star Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Star Hill, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 08:26.

Thames Water logo
Between
24 and 26 Oct 2025
Details
View Map
Share
Follow
Eashing Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Eashing Lane, Milford, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 15:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Critchmere Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Critchmere Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Jul 2025 at 09:56.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Critchmere Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Critchmere Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Jul 2025 at 09:00.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Critchmere Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Critchmere Lane, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 28 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 10:15.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Critchmere Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Critchmere Lane, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 28 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Aug 2025 at 09:29.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Critchmere Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Critchmere Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2025 at 07:43.

Southern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Critchmere Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Critchmere Hill, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jul 2025 at 08:09.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Church Hill

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Hill, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Aug 2025 at 10:09.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Church Hill

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Hill, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 09:28.

Surrey County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Petworth Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 12:49.

Surrey County Council logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Lane End

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lane End, Hambledon, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 12:04.

Surrey County Council logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Malthouse Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Malthouse Lane, Hambledon, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 12:04.

Surrey County Council logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Rock Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rock Hill, Hambledon, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 12:04.

Surrey County Council logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Hambledon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hambledon Road, Hambledon, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 12:05.

Southern Gas Networks logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Crownpits Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crownpits Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 07:29.

Surrey County Council logo
Between
30 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 14:17.

Scottish Hydro Electric Power Dis logo
Between
30 Oct and 26 Nov 2025
Details
View Map
Share
Follow
George Denyer Close Footpath

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on George Denyer Close Footpath, Haslemere.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 30 October 2025 and could run through until 26 November 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Jun 2025 at 09:24.

Hampshire County Council logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Spats Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Spats Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 16:12.

Hampshire County Council logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Spats Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Spats Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 11 Sep 2025 at 13:02.

Hampshire County Council logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Frensham Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Frensham Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 16:12.

Hampshire County Council logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Frensham Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Frensham Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 11 Sep 2025 at 13:02.

Hampshire County Council logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Picketts Hill

Hampshire County Council are proposing to carry out Highway improvement works on Picketts Hill, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 16:15.

Surrey County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Petworth Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 14 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 13:47.

Southern Gas Networks logo
LONG TERM
Between
10 Nov 2025 and 22 Jan 2026
Details
View Map
Share
Follow
Farnham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 22 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:43.

Southern Gas Networks logo
LONG TERM
Between
10 Nov 2025 and 22 Jan 2026
Details
View Map
Share
Follow
Farnham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 22 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 11:10.

Network Rail logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
Station Lane

Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jul 2025 at 08:16.

Surrey County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Aug 2025 at 15:39.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
The Mount

Thames Water are proposing to carry out Utility repair and maintenance works on The Mount, Grayswood, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 2 Aug 2025 at 10:21.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
The Mount

Thames Water are proposing to carry out Utility repair and maintenance works on The Mount, Grayswood, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 10:32.

South East Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Lower House Road

South East Water are proposing to carry out New service connection on Lower House Road, Bowlhead Green, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 22 Aug 2025 at 12:42.

South East Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Lower House Road

South East Water are proposing to carry out New service connection on Lower House Road, Bowlhead Green, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 8 Sep 2025 at 08:14.

BT logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Lion Lane

BT are proposing to carry out Utility asset works on Lion Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Aug 2025 at 09:53.

Surrey County Council logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Cuttmill Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Cuttmill Road, Shackleford, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 08:58.

Thames Water logo
Between
24 Nov and 1 Dec 2025
Details
View Map
Share
Prestwick Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Prestwick Lane, Grayswood, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 1 December 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 16:01.

Surrey County Council logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Petworth Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 28 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 13:46.

Surrey County Council logo
Between
27 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Tennysons Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tennysons Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 14:25.

Surrey County Council logo
Between
27 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Tennysons Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tennysons Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 07:24.

Network Rail logo
LONG TERM
Between
1 Dec 2025 and 1 Jul 2026
Details
View Map
Share
Follow
Critchmere Lane

Network Rail are proposing to carry out Works for Rail Purposes on Critchmere Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 1 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 16:02.

Southern Gas Networks logo
LONG TERM
Between
1 Dec 2025 and 7 May 2026
Details
View Map
Share
Follow
Farnham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 7 May 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:42.

Southern Gas Networks logo
LONG TERM
Between
1 Dec 2025 and 7 May 2026
Details
View Map
Share
Follow
Farnham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 7 May 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 11:23.

Surrey County Council logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Churt Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 08:50.

Surrey County Council logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Churt Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Churt Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 08:50.

Thames Water logo
Between
8 and 17 Dec 2025
Details
View Map
Share
Follow
Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 17 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 14:21.

Surrey County Council logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 14:24.

Southern Gas Networks logo
LONG TERM
Between
8 Dec 2025 and 27 Feb 2026
Details
View Map
Share
Tanners Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Tanners Lane, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:16.

Surrey County Council logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 14:28.

Southern Gas Networks logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Seale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seale Road, Elstead, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 14:15.

Thames Water logo
Between
9 and 13 Dec 2025
Details
View Map
Share
Follow
Kings Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 11:59.


Roadworks Map near to Dye House Road, GODALMING, GU8 6QD (0 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Last Updated: 18 Sep 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Dye House Road, GODALMING, GU8 6QD (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.