ROADWORKS SUMMARY
Gurdons Lane, GODALMING, GU8 5UE
Introduction

View current and future planned roadworks and road closures for Gurdons Lane, GU8 5UE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Gurdons Lane, GODALMING, GU8 5UE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Gurdons Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
1 Feb 2026
Surrey County Council are carrying out Highway repair and maintenance works on Puttenham Lane, Shackleford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 February 2025 at 17:19 and could run through until 1 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Aug 2025 at 15:21.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Road, Dunsfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 9 Jan 2025 at 11:11.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 14:04.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 13:27.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Ockford Ridge, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 11:59.
1 May and 1 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 13:37.
1 Jun and 1 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Skinners Lane, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Mar 2025 at 10:18.
1 Jun and 1 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Summers Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Mar 2025 at 08:42.
1 Jul 2025 and 1 Jan 2026
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 1 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 9 Nov 2024 at 10:35.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thursley Road, Elstead, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 07:46.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 4 Jul 2025 at 07:08.
20 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 08:00 and could run through until 20 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:04.
1 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Minster Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:25.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Minster Road, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 12:00 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 10:07.
1 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 08:25.
1 Sep 2025 and 2 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 2 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:10.
1 Sep 2025 and 2 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 2 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 12:54.
8 Sep and 17 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 24 Jul 2025 at 08:49.
22 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Crownpits Lane, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 10:00 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 10:25.
21 Nov 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Busbridge Lane, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 10:00 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 10:24.
8 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Close, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 08:19.
15 Sep and 3 Oct 2025
Thames Water were proposing to carry out New service connection on Dunsfold Road, Cranleigh.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Aug 2025 at 15:00.
15 Sep and 3 Oct 2025
Thames Water were proposing to carry out New service connection on Dunsfold Road, Cranleigh.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2025 at 13:04.
15 Sep and 3 Oct 2025
Thames Water were proposing to carry out New service connection on Dunsfold Road, Cranleigh.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Aug 2025 at 10:22.
15 Sep and 26 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tuesley Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:06.
1 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Grosvenor Road, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 10:25 and could run through until 1 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 10:32.
30 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Oakdene Road, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 12:30 and could run through until 30 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 12:40.
2 Nov 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Ashstead Lane, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 15:30 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 15:50.
31 Oct 2025
Surrey County Council are carrying out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 07:00 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Sep 2025 at 09:06.
22 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Quartermile Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 08:16.
22 Sep and 17 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ramsden Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:50.
22 Sep and 21 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Busbridge Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 07:21.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Lane, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 06:55.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Lane, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Aug 2025 at 10:49.
29 Sep and 31 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wey Hill, Haslemere.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:05.
29 Sep and 31 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 09:50.
29 Sep and 31 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 11:19.
29 Sep and 31 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Longdene Road, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 09:59.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out roadworks on Tanners Lane, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:18.
29 Sep and 3 Oct 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Killinghurst Lane, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Jul 2025 at 08:12.
29 Sep and 3 Oct 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Killinghurst Lane, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Sep 2025 at 12:55.
29 Sep and 17 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lane End, Hambledon, Godalming.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 14:32.
29 Sep and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashstead Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:14.
29 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Chase, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:44.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 12:32.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:03.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 12:39.
29 Sep 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnham Road, Tilford, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:22.
2 and 8 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tennysons Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 10:17.
6 and 9 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tennysons Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Aug 2025 at 10:59.
6 and 9 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 9 Aug 2025 at 08:38.
6 and 11 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Milford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Jul 2025 at 10:22.
6 and 11 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Milford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Jul 2025 at 07:57.
6 Oct and 9 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Quartermile Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:05.
6 Oct and 9 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Quartermile Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Jun 2025 at 09:31.
6 Oct and 9 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Quartermile Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Jul 2025 at 09:51.
6 and 31 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ramsden Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 08:28.
6 and 10 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Milford Road, Elstead, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 12:16.
6 and 17 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Mill Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 08:09.
13 Oct 2025 and 30 Jan 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lower Street, Haslemere.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 30 January 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:09.
13 and 31 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lane End, Hambledon, Godalming.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 13:33.
13 and 31 Oct 2025
Thames Water are proposing to carry out New service connection on Dunsfold Road, Cranleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2025 at 06:05.
13 and 15 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ballfield Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 8 Sep 2025 at 14:22.
14 Oct 2025 and 14 Mar 2026
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockford Ridge, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Jul 2025 at 12:07.
16 and 28 Oct 2025
National Highways are proposing to carry out Highway improvement works on Guildford - Godalming By-pass, Shackleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 1 Aug 2025 at 10:59.
16 and 28 Oct 2025
National Highways are proposing to carry out Highway improvement works on Guildford - Godalming By-pass, Shackleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Aug 2025 at 15:48.
17 Oct and 3 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Oct 2024 at 09:19.
17 Oct and 3 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Aug 2025 at 11:59.
20 and 22 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Bunch Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 10:11.
20 and 22 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Bunch Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 13:49.
20 Oct and 16 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Chase, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 16 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:21.
20 Oct and 16 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maplehatch Close, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 16 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 11:59.
20 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 08:12.
20 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Jun 2025 at 09:05.
20 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakdene Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 08:07.
20 Oct and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Jul 2025 at 07:45.
20 Oct and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 07:16.
20 Oct and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Close, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:47.
20 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holloway Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 08:54.
22 Oct and 1 Nov 2025
Thames Water are proposing to carry out roadworks on Cliffe Rise, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2025 at 07:35.
22 Oct and 1 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Eashing Lane, Milford, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2025 at 07:34.
22 and 24 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Cuttmill Road, Shackleford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Sep 2025 at 12:08.
24 and 26 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Eashing Lane, Milford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 15:24.
24 Oct and 14 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Oct 2024 at 08:08.
24 Oct and 14 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Aug 2025 at 08:49.
24 and 27 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Jul 2025 at 07:55.
24 and 27 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Aug 2025 at 08:42.
25 Oct and 3 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Aug 2025 at 08:50.
26 Oct and 3 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Dec 2024 at 13:04.
27 and 31 Oct 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Hill, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Aug 2025 at 10:09.
27 and 31 Oct 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Hill, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 09:28.
27 and 31 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 12:49.
27 Oct and 8 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Dunsfold Road, Loxhill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Sep 2025 at 14:52.
27 and 30 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lane End, Hambledon, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 12:04.
27 and 30 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Malthouse Lane, Hambledon, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 12:04.
27 and 30 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Rock Hill, Hambledon, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 12:04.
27 and 30 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hambledon Road, Hambledon, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 12:05.
27 Oct and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crownpits Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 May 2025 at 07:29.
27 Oct and 14 Nov 2025
Surrey County Council are proposing to carry out Highway improvement works on Brighton Road, Godalming.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 17 Jan 2025 at 10:37.
27 Oct and 14 Nov 2025
Surrey County Council are proposing to carry out Highway improvement works on Brighton Road, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 3 Feb 2025 at 09:48.
27 Oct and 14 Nov 2025
Surrey County Council are proposing to carry out Highway improvement works on Flambard Way, Godalming.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 17 Jan 2025 at 10:37.
27 Oct and 14 Nov 2025
Surrey County Council are proposing to carry out Highway improvement works on Flambard Way, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 3 Feb 2025 at 09:48.
30 Oct and 8 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 14:17.
30 Oct and 26 Nov 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on George Denyer Close Footpath, Haslemere.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 30 October 2025 and could run through until 26 November 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Jun 2025 at 09:24.
3 and 5 Nov 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 13:48.
10 and 12 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 21 Aug 2025 at 12:12.
10 and 12 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 19 Sep 2025 at 15:13.
10 and 14 Nov 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 14 November 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 13:47.
15 and 17 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 30 Jul 2025 at 08:16.
17 and 21 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Aug 2025 at 15:39.
17 and 20 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Mount, Grayswood, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 2 Aug 2025 at 10:21.
17 and 20 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Mount, Grayswood, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 22 Aug 2025 at 10:32.
17 and 19 Nov 2025
South East Water are proposing to carry out New service connection on Lower House Road, Bowlhead Green, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 22 Aug 2025 at 12:42.
17 and 19 Nov 2025
South East Water are proposing to carry out New service connection on Lower House Road, Bowlhead Green, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 22 Sep 2025 at 08:03.
19 and 21 Nov 2025
BT are proposing to carry out Utility asset works on Lion Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Aug 2025 at 09:53.
19 and 21 Nov 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Cuttmill Road, Shackleford, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 08:58.
24 Nov and 1 Dec 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Prestwick Lane, Grayswood, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 1 December 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 16:01.
24 and 28 Nov 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 28 November 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 13:46.
25 and 28 Nov 2025
Thames Water are proposing to carry out New service connection on Charterhouse Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 14:38.
27 Nov and 2 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tennysons Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 14:25.
27 Nov and 2 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tennysons Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 07:24.
1 Dec 2025 and 7 May 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 7 May 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:42.
1 Dec 2025 and 7 May 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farnham Road, Elstead, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 7 May 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 11:23.
8 and 17 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 17 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Sep 2025 at 14:21.
8 and 12 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 14:24.
8 and 12 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Sep 2025 at 07:24.
8 Dec 2025 and 27 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Tanners Lane, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 December 2025 and run through until 27 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:16.
8 and 12 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 14:28.
8 and 19 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seale Road, Elstead, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 14:15.
9 and 13 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Sep 2025 at 14:32.
15 and 17 Dec 2025
Thames Water are proposing to carry out New service connection on Clock Barn Lane, Busbridge, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Sep 2025 at 09:16.
Roadworks Map near to Gurdons Lane, GODALMING, GU8 5UE (1 Events)







- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Gurdons Lane, GODALMING, GU8 5UE (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Sep 2025 - 20 Oct 2025)
Contains public sector information licensed under the Open Government Licence v3.0.