ROADWORKS SUMMARY
Petworth Road, GODALMING, GU8 5SA
Introduction
View current and future planned roadworks and road closures for Petworth Road, GU8 5SA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Petworth Road, GODALMING, GU8 5SA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Petworth Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Aug 2024 and 1 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Elstead Road, Elstead, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 16:43.
28 Oct 2024 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 14:09.
1 May 2025
Surrey County Council are carrying out Highway repair and maintenance works on Suffield Lane, Puttenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 07:00 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Nov 2024 at 10:12.
28 Oct 2024 and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Suffield Lane, Puttenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 14:33.
28 Oct 2024 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 08:07.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Skinners Lane, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 24 Jul 2024 at 08:35.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Highercombe Road, Haslemere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 08:30 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 08:42.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Chiddingfold, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:59.
Saturday
Surrey County Council are carrying out Highway repair and maintenance works on Farnham Lane, Haslemere.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Dec 2024 at 10:02.
Tuesday
Surrey County Council are carrying out Highway repair and maintenance works on Shackleford Road, Elstead, Godalming.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 10:55 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Dec 2024 at 11:09.
27 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Tilford Road, Rushmoor, Farnham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 05:30 and could run through until 27 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:11.
Tomorrow
BT were proposing to carry out Utility asset works on Holloway Hill, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Oct 2024 at 14:46.
Tomorrow
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 23 Oct 2024 at 09:20.
Tuesday
Surrey County Council are carrying out Highway repair and maintenance works on Thorncombe Street, Bramley, Guildford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 13:16 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Dec 2024 at 13:16.
6 and 10 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Scotland Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Dec 2024 at 14:04.
6 Jan and 24 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Meadrow, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:40.
6 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farncombe, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 08:14.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 16:05.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 12:19.
6 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Chiddingfold, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:27.
6 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elm Road, Farncombe, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 08:13.
6 and 10 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Scotland Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 07:40.
6 and 10 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Haste Hill, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 07:40.
6 and 10 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Haste Hill, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Dec 2024 at 14:03.
8 and 13 Jan 2025
Thames Water are proposing to carry out New service connection on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:32.
8 and 11 Jan 2025
Thames Water are proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:03.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 16 Dec 2024 at 10:15.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Meadrow, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 13:27.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Catteshall Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 16 Dec 2024 at 10:14.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Catteshall Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 06:53.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Meadrow, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 08:12.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 12:54.
13 and 20 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shillinglee Road, Plaistow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 12:35.
13 and 19 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 09:14.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 06:55.
13 and 20 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Dec 2024 at 12:37.
13 and 20 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 14:26.
13 and 20 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 07:20.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Ockford Ridge, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:27.
16 and 21 Jan 2025
Thames Water were proposing to carry out New service connection on Highercombe Road, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 14:39.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on New Road, Wormley, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:21.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:27.
21 and 22 Jan 2025
Thames Water are proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 07:53.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:52.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on New Road, Wormley, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:04.
22 and 25 Jan 2025
Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:45.
22 and 25 Jan 2025
Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 08:05.
22 and 25 Jan 2025
Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 10:00.
28 and 30 Jan 2025
Thames Water are proposing to carry out New service connection on Croft Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:33.
28 and 30 Jan 2025
Thames Water are proposing to carry out New service connection on Croft Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:37.
28 Jan and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on The Street, Shackleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 09:05.
28 Jan and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Puttenham Lane, Shackleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 11:36.
28 Jan and 12 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Grenville Road, Shackleford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 12 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 15:27.
28 Jan and 12 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Lombard Street, Shackleford, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 12 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 15:20.
28 Jan and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lombard Street, Shackleford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 12:14.
28 Jan and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Cuttmill Road, Shackleford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 12:58.
29 and 31 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Longdene Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 13:14.
31 Jan and 3 Feb 2025
Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:58.
31 Jan and 3 Feb 2025
Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:33.
3 Feb and 30 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on The Burys, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:45.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Water Lane, Enton, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:55.
17 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Holloway Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Oct 2024 at 12:07.
17 and 20 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Nov 2024 at 07:30.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:32.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:26.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:27.
17 and 20 Feb 2025
Thames Water are proposing to carry out New service connection on New Road, Wormley, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:17.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:21.
18 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 07:57.
18 and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dungate Road, Plaistow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 19 Nov 2024 at 13:49.
18 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 07:02.
18 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Aarons Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:12.
21 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Oct 2024 at 07:50.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wey Hill, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 08:31.
26 and 28 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Dec 2024 at 08:38.
4 and 6 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 09:20.
4 and 6 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shillinglee Road, Plaistow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 09:57.
5 and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Killinghurst Lane, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:24.
17 and 19 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Holloway Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:20.
Roadworks Map near to Petworth Road, GODALMING, GU8 5SA
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Petworth Road, GODALMING, GU8 5SA (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.