ROADWORKS SUMMARY
Barrihurst, CRANLEIGH, GU6 8LQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Barrihurst, GU6 8LQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Barrihurst, CRANLEIGH, GU6 8LQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Barrihurst are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 7 May 2025
Details
View Map
Share
Follow
Horsham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Horsham Road, Grafham, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:57.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 7 May 2025
Details
View Map
Share
Follow
Rooks Hill

Thames Water are proposing to carry out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:00.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Skinners Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Skinners Lane, Chiddingfold, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 12:49.

Thames Water logo
LONG TERM
Until
5 Jun 2025
Details
View Map
Share
Follow
Horsham Road

Thames Water are carrying out Disconnection or alteration of supply on Horsham Road, Grafham, Guildford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:20 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:14.

Thames Water logo
LONG TERM
Until
5 Jun 2025
Details
View Map
Share
Follow
Rooks Hill

Thames Water are carrying out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:20 and could run through until 5 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:13.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 7 Mar 2025
Details
View Map
Share
Knowle Lane

Thames Water were proposing to carry out New service connection on Knowle Lane, Cranleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 13:10.

Surrey County Council logo
LONG TERM
Between
5 Jan and 20 Sep 2025
Details
View Map
Share
Follow
Post Office Service Road

Surrey County Council are proposing to carry out Highway improvement works on Post Office Service Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 09:24.

Surrey County Council logo
LONG TERM
Between
5 Jan and 20 Sep 2025
Details
View Map
Share
Follow
Knowle Lane

Surrey County Council are proposing to carry out Highway improvement works on Knowle Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 14:11.

Surrey County Council logo
LONG TERM
Between
5 Jan and 20 Sep 2025
Details
View Map
Share
Follow
Rowland Road

Surrey County Council are proposing to carry out Highway improvement works on Rowland Road, Cranleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 09:24.

Surrey County Council logo
LONG TERM
Between
5 Jan and 20 Sep 2025
Details
View Map
Share
Bank Buildings Road

Surrey County Council were proposing to carry out Highway improvement works on Bank Buildings Road, Cranleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2025 and run through until 20 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2025 at 12:34.

Surrey County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Elmbridge Road

Surrey County Council are proposing to carry out Highway improvement works on Elmbridge Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Jun 2024 at 08:24.

Surrey County Council logo
LONG TERM
Between
6 Jan and 19 Sep 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 08:08.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Sherrydon

Thames Water are proposing to carry out Utility asset works on Sherrydon, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 06:59.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Sherrydon

Thames Water are proposing to carry out Utility asset works on Sherrydon, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:05.

Surrey County Council logo
LONG TERM
Between
6 Jan and 24 Apr 2025
Details
View Map
Share
Follow
Meadrow

Surrey County Council are proposing to carry out Highway improvement works on Meadrow, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:40.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Catteshall Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Catteshall Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 06:53.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Catteshall Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Catteshall Road, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 4 Feb 2025 at 11:34.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Meadrow

Surrey County Council were proposing to carry out Highway repair and maintenance works on Meadrow, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 13:27.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Meadrow

Surrey County Council were proposing to carry out Highway repair and maintenance works on Meadrow, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 4 Feb 2025 at 11:34.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Guildford Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 12:54.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 06:55.

Surrey County Council logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are carrying out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 10:00 and could run through until 16 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 5 Feb 2025 at 12:47.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Old Portsmouth Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 08:59.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Old Portsmouth Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 12:54.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Old Portsmouth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 18 Dec 2024 at 13:28.

Surrey County Council logo
LONG TERM
Between
13 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Old Portsmouth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 30 Dec 2024 at 11:03.

Surrey County Council logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
Old Portsmouth Road

Surrey County Council are carrying out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 10:00 and could run through until 16 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 4 Feb 2025 at 16:14.

Electricity Network Company logo
LONG TERM
Between
17 Jan and 19 Jun 2025
Details
View Map
Share
Loxwood Road

Electricity Network Company were proposing to carry out Utility asset works on Loxwood Road, Alfold, Cranleigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 January 2025 and run through until 19 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 7 Nov 2024 at 09:39.

Surrey County Council logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
High Street

Surrey County Council were proposing to carry out Highway improvement works on High Street, Cranleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2025 at 12:38.

Surrey County Council logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Ewhurst Road

Surrey County Council are proposing to carry out Highway improvement works on Ewhurst Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Jan 2025 at 08:20.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Elmbridge Road

Surrey County Council are proposing to carry out Highway improvement works on Elmbridge Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 24 Jul 2024 at 09:43.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Elmbridge Road

Surrey County Council are carrying out Highway repair and maintenance works on Elmbridge Road, Cranleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 08:00 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 3 Feb 2025 at 09:05.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Amlets Lane

Surrey County Council are carrying out Highway repair and maintenance works on Amlets Lane, Cranleigh.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 15:53 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Feb 2025 at 09:10.

Surrey County Council logo
LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
The Burys

Surrey County Council are proposing to carry out Highway improvement works on The Burys, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:45.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Wanborough Lane

Thames Water are carrying out Utility repair and maintenance works on Wanborough Lane, Cranleigh.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 15:31 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 09:08.

West Sussex County Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Guildford Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Rudgwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 12:03.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Selhurst Common Road

Surrey County Council are carrying out Highway repair and maintenance works on Selhurst Common Road, Bramley, Guildford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 14:30 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Feb 2025 at 16:30.

Surrey County Council logo
Until
27 Feb 2025
Details
View Map
Share
Follow
Petworth Road

Surrey County Council are carrying out Highway repair and maintenance works on Petworth Road, Chiddingfold, Godalming.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 February 2025 at 19:09 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Feb 2025 at 07:26.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Blackheath Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Blackheath Lane, Wonersh, Guildford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 12:36 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 16:04.

West Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Guildford Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Rudgwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Oct 2024 at 12:16.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
New Road

Thames Water are proposing to carry out New service connection on New Road, Wormley, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:17.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
New Road

Thames Water are carrying out New service connection on New Road, Wormley, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 15:00 and could run through until 20 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 15:33.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Alfold Road

Surrey County Council are proposing to carry out Highway improvement works on Alfold Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 08:49.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Barhatch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barhatch Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 7 Jan 2025 at 09:17.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Barhatch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barhatch Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 3 Feb 2025 at 09:25.

BT logo
Finishing
Today
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:21.

BT logo
Finishing
Today
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:27.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Peaslake Road

Thames Water are proposing to carry out New service connection on Peaslake Road, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:03.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Peaslake Road

Thames Water are carrying out New service connection on Peaslake Road, Ewhurst, Cranleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 14:45 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 15:06.

BT logo
Finishing
Today
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:26.

BT logo
Finishing
Today
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:32.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Holloway Hill

BT are proposing to carry out Utility asset works on Holloway Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Oct 2024 at 12:07.

West Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Dungate Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dungate Road, Plaistow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 19 Nov 2024 at 13:49.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Pickhurst Road

Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 07:57.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Pickhurst Road

Thames Water are carrying out New service connection on Pickhurst Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 February 2025 at 11:20 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 11:32.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ockley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockley Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 10:56.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ockley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockley Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 08:02.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Trunley Heath Road

Surrey County Council are carrying out Highway repair and maintenance works on Trunley Heath Road, Bramley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 February 2025 at 12:39 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Feb 2025 at 12:39.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Barhatch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barhatch Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 11 Feb 2025 at 11:49.

Network Rail logo
Finishing
Sunday
Details
View Map
Share
Follow
Farncombe Street

Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Oct 2024 at 07:50.

Thames Water logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out New service connection on Guildford Road, Rudgwick, Horsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 07:20.

UK Power Networks South Eastern logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Furzen Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Furzen Lane, Ellens Green, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Dec 2024 at 14:44.

UK Power Networks South Eastern logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Furzen Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Furzen Lane, Ellens Green, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Dec 2024 at 07:08.

UK Power Networks South Eastern logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Furzen Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Furzen Lane, Ellens Green, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Dec 2024 at 16:30.

Surrey County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Elmbridge Road

Surrey County Council were proposing to carry out Highway improvement works on Elmbridge Road, Cranleigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 31 Jul 2024 at 10:37.

Surrey County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Horsham Road

Surrey County Council were proposing to carry out Highway improvement works on Horsham Road, Alfold, Cranleigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 31 Jul 2024 at 10:37.

Surrey County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Dunsfold Road

Surrey County Council were proposing to carry out Highway improvement works on Dunsfold Road, Cranleigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 31 Jul 2024 at 10:38.

Surrey County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Horsham Road

Surrey County Council are proposing to carry out Highway improvement works on Horsham Road, Alfold, Cranleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Jun 2024 at 08:22.

Surrey County Council logo
Between
24 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Horsham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 17 Feb 2025 at 16:03.

Surrey County Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Alfold Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Alfold Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 13 Dec 2024 at 10:14.

Surrey County Council logo
Between
24 Feb and 23 Mar 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 17 Feb 2025 at 16:02.

Surrey County Council logo
Between
24 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Ewhurst Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ewhurst Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 17 Feb 2025 at 16:02.

Thames Water logo
LONG TERM
Between
24 Feb and 19 May 2025
Details
View Map
Share
Follow
Sherrydon

Thames Water are proposing to carry out Utility asset works on Sherrydon, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Feb 2025 at 12:52.

Thames Water logo
Between
25 Feb and 22 Mar 2025
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out roadworks on Guildford Road, Rudgwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 12:32.

Thames Water logo
Between
25 Feb and 22 Mar 2025
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out New service connection on Guildford Road, Rudgwick, Horsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 10:39.

Network Rail logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Station Lane

Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Dec 2024 at 08:38.

Network Rail logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Station Lane

Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jan 2025 at 09:59.

Surrey County Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Mare Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Mare Lane, Loxhill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 6 Feb 2025 at 14:40.

Surrey County Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Mare Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Mare Lane, Loxhill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 12 Feb 2025 at 13:47.

Surrey County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Barhatch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barhatch Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 09:38.

Surrey County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Barhatch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barhatch Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 10:58.

Surrey County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Horseblock Hollow

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horseblock Hollow, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 09:38.

Surrey County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Horseblock Hollow

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horseblock Hollow, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 10:57.

Scottish Hydro Electric Power Dis logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Pickhurst Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 09:20.

Scottish Hydro Electric Power Dis logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Pickhurst Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Jan 2025 at 11:19.

Surrey County Council logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
Ockley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockley Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Dec 2024 at 09:05.

Surrey County Council logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
Ockley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockley Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Feb 2025 at 14:42.

Surrey County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Hound House Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hound House Road, Shere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 24 Jan 2025 at 11:56.

Thames Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Tannery Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Tannery Lane, Bramley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 11:35.

Thames Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Shere Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shere Road, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:26.

ESP Electricity logo
Between
11 and 18 Mar 2025
Details
View Map
Share
Follow
Pitch Hill

ESP Electricity are proposing to carry out Utility asset works on Pitch Hill, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 18 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by ESP Electricity on 14 Jan 2025 at 16:30.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Baynards Lane

Thames Water are proposing to carry out New service connection on Baynards Lane, Rudgwick, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:55.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Baynards Lane

Thames Water are proposing to carry out New service connection on Baynards Lane, Rudgwick, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 08:28.

West Sussex County Council logo
Between
17 and 23 Mar 2025
Details
View Map
Share
Follow
Church Street

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Church Street, Rudgwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 19 Dec 2024 at 11:27.

West Sussex County Council logo
Between
17 and 23 Mar 2025
Details
View Map
Share
Follow
Cox Green

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cox Green, Rudgwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 9 Jan 2025 at 15:32.

West Sussex County Council logo
Between
17 and 23 Mar 2025
Details
View Map
Share
Follow
Cox Green

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cox Green, Rudgwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 9 Jan 2025 at 15:35.

UK Power Networks South Eastern logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
High Street

UK Power Networks South Eastern are proposing to carry out New service connection on High Street, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Jan 2025 at 13:52.

Thames Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Shere Road

Thames Water were proposing to carry out Utility repair and maintenance works on Shere Road, Ewhurst, Cranleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 15:38.

ESP Electricity logo
Between
17 and 24 Mar 2025
Details
View Map
Share
Follow
Pitch Hill

ESP Electricity are proposing to carry out Utility asset works on Pitch Hill, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 24 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by ESP Electricity on 22 Jan 2025 at 09:46.

Thames Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Holloway Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Holloway Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:20.

Network Rail logo
Between
21 and 25 Mar 2025
Details
View Map
Share
Follow
Station Lane

Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 10:44.

Network Rail logo
Between
21 and 25 Mar 2025
Details
View Map
Share
Follow
Station Lane

Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Feb 2025 at 14:26.

Network Rail logo
Between
22 and 24 Mar 2025
Details
View Map
Share
Station Lane

Network Rail were proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 16:26.

Thames Water logo
Between
22 and 24 Mar 2025
Details
View Map
Share
Follow
Catteshall Road

Thames Water are proposing to carry out Utility repair and maintenance works on Catteshall Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 12:18.

Surrey County Council logo
Between
23 Mar and 20 Apr 2025
Details
View Map
Share
Follow
Horsham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 18 Feb 2025 at 14:34.

Surrey County Council logo
Between
23 Mar and 20 Apr 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 18 Feb 2025 at 14:29.

Surrey County Council logo
Between
23 Mar and 20 Apr 2025
Details
View Map
Share
Follow
Ewhurst Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ewhurst Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 18 Feb 2025 at 14:31.

Surrey County Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Knowle Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Knowle Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Feb 2025 at 13:48.

ESP Electricity logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Pitch Hill

ESP Electricity are proposing to carry out Utility asset works on Pitch Hill, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by ESP Electricity on 31 Jan 2025 at 13:17.

ESP Electricity logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Pitch Hill

ESP Electricity are proposing to carry out Utility asset works on Pitch Hill, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by ESP Electricity on 5 Feb 2025 at 14:47.

Surrey County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Snowdenham Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Snowdenham Lane, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 31 Jan 2025 at 08:52.

Surrey County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Snowdenham Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Snowdenham Lane, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 31 Jan 2025 at 13:15.

Network Rail logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Farncombe Street

Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 10:55.

Surrey County Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Tilthams Corner Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilthams Corner Road, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 31 Jan 2025 at 08:24.

West Sussex County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Nicholsfield

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Nicholsfield, Loxwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Feb 2025 at 09:56.

Surrey County Council logo
Between
31 Mar and 12 Apr 2025
Details
View Map
Share
Follow
The Green

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Green, Ewhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Feb 2025 at 12:44.

Network Rail logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Farncombe Street

Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Dec 2024 at 09:30.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Rosemary Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rosemary Lane, Alfold, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:31.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Road, Dunsfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Jan 2025 at 11:11.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Barhatch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barhatch Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Nov 2024 at 10:33.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Moon Hall Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Moon Hall Road, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Jan 2025 at 11:12.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Wonersh Common

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wonersh Common, Wonersh, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:20.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Wonersh Common Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wonersh Common Road, Wonersh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Sep 2024 at 10:30.

Thames Water logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Hambledon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hambledon Road, Busbridge, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 12:15.

Surrey County Council logo
Between
4 and 22 Apr 2025
Details
View Map
Share
Follow
Loxwood Road

Surrey County Council are proposing to carry out Highway improvement works on Loxwood Road, Alfold, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 14:22.

Surrey County Council logo
LONG TERM
Between
5 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Bank Buildings Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bank Buildings Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2025 at 12:33.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 08:11.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 08:10.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 08:09.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 08:08.

Thames Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Farncombe Street

Thames Water are proposing to carry out New service connection on Farncombe Street, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 08:08.

Thames Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Blackheath Lane

Thames Water are proposing to carry out New service connection on Blackheath Lane, Wonersh, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 08:45.

Thames Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Munstead Heath Road

Thames Water are proposing to carry out Utility repair and maintenance works on Munstead Heath Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 07:11.

Southern Gas Networks logo
Between
10 and 16 Apr 2025
Details
View Map
Share
Follow
Tuesley Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 08:58.

Southern Gas Networks logo
Between
10 and 16 Apr 2025
Details
View Map
Share
Follow
Tuesley Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Feb 2025 at 09:35.

Thames Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Water Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Water Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 10 Jan 2025 at 09:53.

Thames Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Holloway Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Holloway Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Dec 2024 at 10:31.

Thames Water logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Elmbridge Road

Thames Water were proposing to carry out New service connection on Elmbridge Road, Cranleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 07:53.

UK Power Networks South Eastern logo
Between
22 and 30 Apr 2025
Details
View Map
Share
Follow
Chestnut Way

UK Power Networks South Eastern are proposing to carry out New service connection on Chestnut Way, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jan 2025 at 10:26.

UK Power Networks South Eastern logo
Between
22 and 30 Apr 2025
Details
View Map
Share
Follow
Chestnut Way

UK Power Networks South Eastern are proposing to carry out New service connection on Chestnut Way, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Feb 2025 at 09:54.

Thames Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Petworth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Petworth Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 12:23.

Thames Water logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out New service connection on Guildford Road, Rudgwick, Horsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 14:24.

Thames Water logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Horsham Road

Thames Water are proposing to carry out New service connection on Horsham Road, Alfold, Cranleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 14:15.

Southern Gas Networks logo
LONG TERM
Between
12 May and 20 Jun 2025
Details
View Map
Share
Follow
Minster Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Minster Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 08:34.

Southern Gas Networks logo
LONG TERM
Between
12 May and 20 Jun 2025
Details
View Map
Share
Follow
Summerhouse Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 11:31.

Southern Gas Networks logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Summerhouse Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerhouse Close, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 11:20.

UK Power Networks South Eastern logo
Between
16 and 22 May 2025
Details
View Map
Share
Follow
Markwick Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Markwick Lane, Loxhill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 22 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Feb 2025 at 12:02.


Roadworks Map near to Barrihurst, CRANLEIGH, GU6 8LQ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 19 Feb 2025 04:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Barrihurst, CRANLEIGH, GU6 8LQ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.