ROADWORKS SUMMARY
New Road, GUILDFORD, GU4 8LR
Introduction
View current and future planned roadworks and road closures for New Road, GU4 8LR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to New Road, GUILDFORD, GU4 8LR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for New Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodbridge Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 12 Mar 2024 at 14:27.
1 Sep 2024 and 1 Mar 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Clandon Road, West Clandon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:44.
1 Sep 2024 and 1 Mar 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Clandon Road, Send.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:44.
2 Oct 2024 and 7 May 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Horsham Road, Grafham, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:57.
2 Oct 2024 and 7 May 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:00.
1 Nov 2024 and 1 May 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 10:45.
5 Jun 2025
Thames Water are carrying out Disconnection or alteration of supply on Horsham Road, Grafham, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 11:20 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:14.
5 Jun 2025
Thames Water are carrying out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 11:20 and could run through until 5 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:13.
18 Nov 2024 and 4 Jun 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 6 Jun 2024 at 11:01.
16 Dec 2024 and 31 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Shere Road, Albury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 17:07.
31 Mar 2025
Thames Water are carrying out Utility repair and maintenance works on Shere Road, Albury.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Jan 2025 at 10:21.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Woodbridge Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Dec 2024 at 14:14.
2 Jan and 7 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Nov 2024 at 09:42.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Nov 2024 at 15:11.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Nov 2024 at 15:04.
6 Jan and 24 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Meadrow, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:40.
Monday
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:17.
Monday
Thames Water are carrying out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:30 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Jan 2025 at 08:47.
6 Jan and 11 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Dec 2024 at 12:19.
11 Feb 2025
BT are carrying out Utility repair and maintenance works on North Street, Guildford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 12:30 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 6 Jan 2025 at 13:43.
6 Jan and 11 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Nov 2024 at 16:18.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Cranley Road, Guildford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 17:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Jan 2025 at 12:06.
6 Jan and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Trodds Lane, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 09:18.
14 Mar 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Trodds Lane, Guildford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:30 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Jan 2025 at 09:03.
Tomorrow
UK Power Networks South Eastern are carrying out Statutory Infrastructure Works on Woking Road, Guildford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Jan 2025 at 09:51.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Catteshall Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 06:53.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Catteshall Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 23 Dec 2024 at 14:34.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Meadrow, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 13:27.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Meadrow, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 08:12.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 12:54.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 06:55.
25 Apr 2025
Surrey County Council are carrying out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 10:00 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 13 Jan 2025 at 10:12.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 08:59.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 12:54.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 18 Dec 2024 at 13:28.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 30 Dec 2024 at 11:03.
25 Apr 2025
Surrey County Council are carrying out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 10:00 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 13 Jan 2025 at 10:11.
Tomorrow
UK Power Networks South Eastern were proposing to carry out New service connection on Burrows Lane, Gomshall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Sep 2024 at 10:51.
Tuesday
UK Power Networks South Eastern are proposing to carry out New service connection on Millbrook, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 09:36.
Tomorrow
Thames Water are carrying out New service connection on Peaslake Lane, Peaslake.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 January 2025 at 12:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 14:53.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Old Portsmouth Road, Peasmarsh, Guildford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 January 2025 at 18:36 and could run through until 4 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 15:57.
Tomorrow
Surrey County Council are proposing to carry out Works for road purposes on Alldens Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 2 Jan 2025 at 10:58.
Tomorrow
Surrey County Council are carrying out Works for road purposes on Alldens Lane, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 10:00 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 28 Jan 2025 at 11:53.
Tuesday
UK Power Networks South Eastern were proposing to carry out New service connection on Peaslake Lane, Peaslake.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 4 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Dec 2024 at 12:28.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Horsham Road, Shalford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 10:03 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Jan 2025 at 12:21.
27 Jan and 24 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Pewley Hill, Guildford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:46.
27 Jan and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 10:25.
27 Jan and 14 Feb 2025
UK Power Networks South Eastern were proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 10:37.
Today
Thames Water are proposing to carry out New service connection on Croft Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:33.
Today
Thames Water are carrying out New service connection on Croft Road, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 10:15 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 10:25.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Tilthams Corner Road, Godalming.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 18:29 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Jan 2025 at 10:32.
28 Feb 2025
Thames Water are carrying out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 07:30 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 08:58.
Tuesday
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Church Lane, Shere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 15:50.
Tuesday
Southern Gas Networks are carrying out Disconnection or alteration of supply on Church Lane, Shere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 January 2025 at 11:00 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 11:00.
Monday
Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:58.
Monday
Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:33.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Lane, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Jan 2025 at 17:53.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Nov 2024 at 10:31.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Jan 2025 at 08:56.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Jan 2025 at 09:21.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Little London, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Jan 2025 at 17:55.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 30 Dec 2024 at 08:34.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Nov 2024 at 10:58.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Jan 2025 at 08:57.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Jan 2025 at 11:29.
31 Jan and 28 Feb 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 10:43.
31 Jan and 28 Feb 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 10:02.
1 and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Sep 2024 at 10:29.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Ockford Ridge, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Jan 2025 at 15:40.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Ockford Ridge, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 09:58.
3 Feb and 30 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on The Burys, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:45.
3 Feb and 30 Mar 2025
Thames Water are proposing to carry out Utility asset works on Tilehouse Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 16:25.
3 Feb and 30 Mar 2025
Thames Water are proposing to carry out Utility asset works on Tilehouse Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 10:39.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 10:58.
10 and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hound House Road, Shere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Jan 2025 at 10:02.
10 and 13 Feb 2025
Thames Water were proposing to carry out New service connection on Brook Lane, Albury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:40.
10 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Weybrook Drive, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Jan 2025 at 09:17.
11 Feb and 3 Mar 2025
UK Power Networks South Eastern were proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 3 March 2025. The works were due to impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Dec 2024 at 14:12.
13 and 25 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Envis Way, Fairlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 14:36.
13 and 25 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Envis Way, Fairlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Jan 2025 at 08:50.
15 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Lido Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Jan 2025 at 09:51.
15 Feb and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Stoke Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Mar 2024 at 14:18.
15 Feb and 17 Apr 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Stoke Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 13:03.
16 Feb and 16 May 2025
Surrey County Council are proposing to carry out Highway improvement works on The Street, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:03.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:21.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:27.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:26.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:32.
17 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Holloway Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Oct 2024 at 12:07.
17 Feb and 17 May 2025
Surrey County Council are proposing to carry out Highway improvement works on Broadford Road, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:07.
17 Feb and 17 May 2025
Surrey County Council are proposing to carry out Highway improvement works on Kings Road, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:08.
17 Feb and 7 Mar 2025
UK Power Networks South Eastern were proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Dec 2024 at 15:55.
17 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Road, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 11:33.
17 and 21 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 15:18.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:32.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 09:54.
17 and 19 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Stoke Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 21 Jan 2025 at 09:36.
17 Feb and 8 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Southway, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 13:26.
18 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Aarons Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:12.
20 and 26 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Raymond Crescent, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by UK Power Networks South Eastern on 5 Dec 2024 at 12:28.
21 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Oct 2024 at 07:50.
24 and 28 Feb 2025
Southern Gas Networks were proposing to carry out New service connection on Guildown Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 14:39.
27 Feb and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Jan 2025 at 09:46.
28 Feb and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 17:06.
28 Feb and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Dec 2024 at 09:27.
28 Feb and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 10:16.
3 and 7 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horseblock Hollow, Cranleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 09:38.
3 and 7 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horseblock Hollow, Cranleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 10:57.
3 and 7 Mar 2025
Southern Gas Networks were proposing to carry out New service connection on Castle Street, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 09:46.
3 and 7 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Stoke Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Jan 2025 at 08:35.
4 and 6 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Queens Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 14:31.
5 and 7 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Stoke Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 21 Jan 2025 at 09:39.
10 and 15 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hound House Road, Shere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 24 Jan 2025 at 11:56.
10 and 14 Mar 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Peaslake Lane, Peaslake.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Jan 2025 at 14:17.
10 and 21 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tannery Lane, Bramley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 9 Jan 2025 at 11:35.
10 and 24 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Station Road, Shalford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 16:46.
11 and 14 Mar 2025
Thames Water were proposing to carry out New service connection on Dorking Road, Gomshall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 March 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 10:45.
11 and 13 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 13:33.
17 and 19 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Holloway Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:20.
17 and 21 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Peaslake Lane, Peaslake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Jan 2025 at 12:05.
17 and 21 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Broadford Road, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Jan 2025 at 13:58.
17 Mar and 30 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbridge Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 11:12.
17 and 28 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Worplesdon Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jan 2025 at 13:43.
22 and 24 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Catteshall Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Jan 2025 at 12:18.
24 and 26 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Dec 2024 at 10:55.
24 Mar and 4 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tilthams Corner Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 13:21.
24 and 27 Mar 2025
Thames Water were proposing to carry out New service connection on Brook Lane, Albury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Jan 2025 at 14:18.
24 and 27 Mar 2025
Thames Water are proposing to carry out New service connection on Brook Lane, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 21 Jan 2025 at 17:25.
25 and 28 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on New Pond Road, Peasmarsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Dec 2024 at 11:14.
25 and 28 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on New Pond Road, Compton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Dec 2024 at 10:43.
25 and 27 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Little Street, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 13 Jan 2025 at 09:47.
27 Mar and 25 Apr 2025
Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Jan 2025 at 09:44.
28 Mar and 25 Apr 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 17:05.
28 Mar and 25 Apr 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Dec 2024 at 10:54.
28 Mar and 25 Apr 2025
Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 10:40.
31 Mar and 2 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Dec 2024 at 09:30.
31 Mar and 18 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Kings Road, Shalford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 29 Jan 2025 at 12:31.
31 Mar and 18 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Kings Road, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 29 Jan 2025 at 12:38.
31 Mar and 4 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on Chapel Street, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jan 2025 at 14:13.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Barhatch Lane, Cranleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 9 Nov 2024 at 10:33.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Moon Hall Road, Ewhurst, Cranleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 9 Jan 2025 at 11:12.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockford Ridge, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 09:42.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Burchets Hollow, Peaslake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 07:56.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wonersh Common, Wonersh, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:20.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wonersh Common Road, Wonersh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Sep 2024 at 10:30.
1 and 3 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dorking Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jan 2025 at 11:07.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 12:00.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodbridge Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 11:13.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Clover Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 07:57.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 11:56.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 10:47.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Lane, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 15:39.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Keens Lane, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 07:58.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Worplesdon Road, Worplesdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 09:46.
2 and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hambledon Road, Busbridge, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 15 Jan 2025 at 12:15.
2 and 4 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Dec 2024 at 14:48.
4 and 8 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Clover Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Dec 2024 at 10:55.
6 Apr and 26 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Old Portsmouth Road, Peasmarsh, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 April 2025 and could run through until 26 June 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 2 May 2024 at 11:59.
7 and 9 Apr 2025
BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Oct 2024 at 08:11.
7 and 9 Apr 2025
BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Oct 2024 at 08:10.
7 and 9 Apr 2025
BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Oct 2024 at 08:09.
7 and 9 Apr 2025
BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Oct 2024 at 08:08.
7 and 10 Apr 2025
Thames Water are proposing to carry out New service connection on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 08:08.
7 and 10 Apr 2025
Thames Water are proposing to carry out New service connection on Blackheath Lane, Wonersh, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 9 Jan 2025 at 08:45.
7 and 9 Apr 2025
Thames Water are proposing to carry out New service connection on Dorking Road, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 10:52.
7 and 11 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on Castle Street, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 09:49.
7 and 21 Apr 2025
UK Power Networks South Eastern were proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 21 April 2025. The works were due to impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 17 Jan 2025 at 14:30.
8 and 10 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Munstead Heath Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 07:11.
10 and 16 Apr 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Tuesley Lane, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 09:49.
11 and 17 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Dec 2024 at 10:20.
14 and 16 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Holloway Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Dec 2024 at 10:31.
22 and 30 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Chestnut Way, Bramley, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Jan 2025 at 13:13.
22 and 25 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Dec 2024 at 08:24.
22 Apr and 13 Jun 2025
Affinity Water are proposing to carry out Utility asset works on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 28 Jan 2025 at 12:03.
23 and 25 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 31 Dec 2024 at 13:47.
25 Apr and 12 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Lane, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Jan 2025 at 12:51.
25 Apr and 12 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Little London, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Jan 2025 at 12:54.
28 Apr and 23 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Road, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Jan 2025 at 09:27.
28 Apr and 1 May 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on The Street, West Clandon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 1 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 08:12.
29 Apr and 2 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Sandy Lane, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Jan 2025 at 10:21.
Roadworks Map near to New Road, GUILDFORD, GU4 8LR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to New Road, GUILDFORD, GU4 8LR (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 Jan 2025 - 30 Jan 2025)
(Scheduled: 28 Jan 2025 - 30 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.