ROADWORKS SUMMARY
Alder Grove, GUILDFORD, GU4 8FA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Alder Grove, GU4 8FA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Alder Grove, GUILDFORD, GU4 8FA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Alder Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
Burchets Hollow

Surrey County Council are proposing to carry out Highway repair and maintenance works on Burchets Hollow, Peaslake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 27 Nov 2023 at 09:16.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
Clandon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clandon Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Oct 2023 at 14:04.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
Southway

Surrey County Council are proposing to carry out Highway repair and maintenance works on Southway, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 16 Oct 2023 at 11:20.

Thames Water logo
LONG TERM
Between
1 Jul and 4 Nov 2024
Details
View Map
Share
Follow
Upfold Close

Thames Water are proposing to carry out roadworks on Upfold Close, Cranleigh.

These works are categorised as Major.

The works will start on or after 1 July 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:08.

BT logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
High Street

BT are carrying out Utility asset works on High Street, Bramley, Guildford.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 21:00 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Sep 2024 at 09:41.

Surrey County Council logo
LONG TERM
Until
7 Nov 2024
Details
View Map
Share
Follow
Woodbridge Meadows

Surrey County Council are carrying out Highway repair and maintenance works on Woodbridge Meadows, Guildford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 August 2024 at 20:00 and could run through until 7 November 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 09:24.

Surrey County Council logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Woodbridge Road

Surrey County Council are carrying out Highway repair and maintenance works on Woodbridge Road, Guildford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 August 2024 at 20:00 and could run through until 1 November 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 09:22.

Surrey County Council logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Ladymead

Surrey County Council are carrying out Highway repair and maintenance works on Ladymead, Guildford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 August 2024 at 20:00 and could run through until 1 November 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 09:23.

Surrey County Council logo
LONG TERM
Until
7 Nov 2024
Details
View Map
Share
Follow
Europa Park Road

Surrey County Council are carrying out Highway repair and maintenance works on Europa Park Road, Guildford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 August 2024 at 20:00 and could run through until 7 November 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 09:24.

Surrey County Council logo
LONG TERM
Between
1 Aug 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Woodbridge Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodbridge Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Mar 2024 at 14:27.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Bedford Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bedford Road, Guildford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 August 2024 at 12:45 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 11:18.

Surrey County Council logo
LONG TERM
Between
31 Aug 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Clandon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clandon Road, West Clandon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 May 2024 at 08:29.

Surrey County Council logo
LONG TERM
Between
31 Aug 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Clandon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clandon Road, Send.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 May 2024 at 08:29.

Thames Water logo
LONG TERM
Between
2 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Guildford Road, Cranleigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 10 Aug 2024 at 07:36.

Thames Water logo
LONG TERM
Between
2 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Guildford Road, Cranleigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 10:08.

Thames Water logo
LONG TERM
Between
2 Sep and 6 Dec 2024
Details
View Map
Share
Guildford Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Guildford Road, Cranleigh.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:38.

Surrey County Council logo
LONG TERM
Between
3 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Broadford Road

Surrey County Council are proposing to carry out Highway improvement works on Broadford Road, Shalford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Surrey County Council on 2 May 2024 at 11:57.

UK Power Networks South Eastern logo
Until
7 Oct 2024
Details
View Map
Share
Follow
Waterside Road

UK Power Networks South Eastern are carrying out Statutory Infrastructure Works on Waterside Road, Guildford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 10:00 and could run through until 7 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 09:31.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Nightingale Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Nightingale Road, Godalming.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 09:53 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 09:45.

Surrey County Council logo
LONG TERM
Between
15 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Catteshall Road

Surrey County Council are proposing to carry out Highway improvement works on Catteshall Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:42.

Thames Water logo
Between
16 and 30 Sep 2024
Details
View Map
Share
Follow
Shere Road

Thames Water are proposing to carry out Utility asset works on Shere Road, Albury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 11:55.

Thames Water logo
Until
30 Sep 2024
Details
View Map
Share
Follow
Shere Road

Thames Water are carrying out Utility asset works on Shere Road, Albury.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:37 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 08:38.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Waterside Road

Thames Water are carrying out Utility repair and maintenance works on Waterside Road, Guildford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 14:37 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 10:03.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Baillie Road

Thames Water are carrying out Utility repair and maintenance works on Baillie Road, Guildford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 12:34 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 10:02.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jun 2024 at 09:04.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 09:41.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Burrows Lane

Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jun 2024 at 09:03.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Burrows Lane

Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 13:29.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
New Road

Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Jun 2024 at 13:41.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
New Road

Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Sep 2024 at 07:45.

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 29 Nov 2024
Details
View Map
Share
Trodds Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Trodds Lane, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 11:13.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Jun 2024 at 13:39.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 09:45.

Network Rail logo
Between
27 and 30 Sep 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Jun 2024 at 10:29.

Network Rail logo
Between
27 and 30 Sep 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 13:33.

Network Rail logo
Between
27 and 30 Sep 2024
Details
View Map
Share
Follow
Burrows Lane

Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Jun 2024 at 10:18.

Network Rail logo
Between
27 and 30 Sep 2024
Details
View Map
Share
Follow
Burrows Lane

Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 13:24.

Network Rail logo
Between
28 and 30 Sep 2024
Details
View Map
Share
Follow
Bourne Road

Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Jun 2024 at 13:41.

Network Rail logo
Between
28 and 30 Sep 2024
Details
View Map
Share
Follow
Bourne Road

Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 10:09.

Network Rail logo
Between
28 and 30 Sep 2024
Details
View Map
Share
Follow
New Road

Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Jun 2024 at 11:32.

Network Rail logo
Between
28 and 30 Sep 2024
Details
View Map
Share
Follow
New Road

Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Sep 2024 at 16:18.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Foxburrow Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxburrow Hill Road, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:41.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Foxburrow Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxburrow Hill Road, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 11:29.

Southern Gas Networks logo
Between
30 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Foxburrow Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxburrow Hill Road, Bramley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 25 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2024 at 09:33.

Southern Gas Networks logo
Between
30 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Foxburrow Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxburrow Hill Road, Bramley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 25 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 11:27.

Surrey County Council logo
Between
30 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Kings Road

Surrey County Council are proposing to carry out Highway improvement works on Kings Road, Shalford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 18 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 08:34.

Surrey County Council logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Dorking Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dorking Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Sep 2024 at 09:15.

Surrey County Council logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
The Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Street, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2024 at 11:38.

Surrey County Council logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Chilworth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chilworth Road, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Sep 2024 at 11:30.

Surrey County Council logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
The Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Street, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Sep 2024 at 14:22.

Surrey County Council logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Sherbourne

Surrey County Council are proposing to carry out Highway repair and maintenance works on Sherbourne, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2024 at 11:38.

BT logo
LONG TERM
Between
30 Sep and 2 Dec 2024
Details
View Map
Share
Follow
Leapale Road

BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by BT on 17 Sep 2024 at 10:47.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 7 May 2025
Details
View Map
Share
Follow
Horsham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Horsham Road, Grafham, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:57.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 7 May 2025
Details
View Map
Share
Follow
Horsham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Horsham Road, Grafham, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 09:36.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 7 May 2025
Details
View Map
Share
Follow
Rooks Hill

Thames Water are proposing to carry out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:00.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 7 May 2025
Details
View Map
Share
Follow
Rooks Hill

Thames Water are proposing to carry out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 09:36.

BT logo
LONG TERM
Between
9 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Leapale Road

BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Sep 2024 at 13:36.

Thames Water logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
The Street

Thames Water are proposing to carry out New service connection on The Street, Hascombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 27 Jul 2024 at 06:20.

Thames Water logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
The Street

Thames Water are proposing to carry out New service connection on The Street, Hascombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Aug 2024 at 09:07.

Southern Gas Networks logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Pitch Hill

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Pitch Hill, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 13:42.

Southern Gas Networks logo
Between
14 and 28 Oct 2024
Details
View Map
Share
Follow
Green Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farncombe, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 28 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2024 at 07:03.

Southern Gas Networks logo
Between
14 and 28 Oct 2024
Details
View Map
Share
Follow
Elm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elm Road, Farncombe, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 28 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2024 at 06:45.

Southern Gas Networks logo
Between
14 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2024 at 10:09.

Network Rail logo
Between
26 Oct and 4 Nov 2024
Details
View Map
Share
Farncombe Street

Network Rail were proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 4 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Aug 2024 at 11:59.

Southern Gas Networks logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Pitch Hill

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Pitch Hill, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Aug 2024 at 11:25.

Southern Gas Networks logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Pitch Hill

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Pitch Hill, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 11:25.

BT logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Holloway Hill

BT are proposing to carry out Utility asset works on Holloway Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Jul 2024 at 10:15.

Surrey County Council logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Nightingale Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Nightingale Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jun 2024 at 12:18.

Surrey County Council logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Park Barn Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Barn Drive, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Aug 2024 at 12:27.

Surrey County Council logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Park Barn Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Barn Drive, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 08:58.

Surrey County Council logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 7 Jun 2024 at 12:09.

Surrey County Council logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Winterhill Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Winterhill Way, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 7 Jun 2024 at 12:53.

Surrey County Council logo
Between
28 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Keens Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Keens Lane, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Sep 2024 at 12:13.

Network Rail logo
Between
30 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Salt Box Road

Network Rail are proposing to carry out Works for Rail Purposes on Salt Box Road, Worplesdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Jul 2024 at 14:59.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Woking Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 15:31.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Snowdenham Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Snowdenham Links Road, Bramley, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:47.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
White Lane

Thames Water are proposing to carry out Utility repair and maintenance works on White Lane, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 12:43.

UK Power Networks South Eastern logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Parkway

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Parkway, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Mar 2024 at 14:05.

Surrey County Council logo
Between
4 and 19 Nov 2024
Details
View Map
Share
Follow
Cumberland Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cumberland Avenue, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Sep 2024 at 14:53.

Surrey County Council logo
LONG TERM
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Holly Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Holly Lane, Worplesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Sep 2024 at 15:49.

Surrey County Council logo
LONG TERM
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Worplesdon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Worplesdon Road, Worplesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Sep 2024 at 15:44.

Southern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Munstead Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Munstead Heath Road, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:43.

Southern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Horsham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsham Road, Gosden Common.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:55.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
St Martha Footpath 260/10

Thames Water are proposing to carry out New service connection on St Martha Footpath 260/10, St Martha.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:51.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Follow
Blacksmith Lane

Thames Water are proposing to carry out New service connection on Blacksmith Lane, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:00.

Thames Water logo
Between
11 and 27 Nov 2024
Details
View Map
Share
Follow
Albury Byway 517/30

Thames Water are proposing to carry out Utility repair and maintenance works on Albury Byway 517/30, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 09:14.

Surrey County Council logo
Between
14 and 25 Nov 2024
Details
View Map
Share
Follow
Southway

Surrey County Council are proposing to carry out Highway repair and maintenance works on Southway, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2024 at 13:25.

Network Rail logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Bourne Road

Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Aug 2024 at 09:18.

UK Power Networks South Eastern logo
Between
18 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Brook Hill

UK Power Networks South Eastern are proposing to carry out New service connection on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Sep 2024 at 10:28.

UK Power Networks South Eastern logo
Between
18 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Brook Hill

UK Power Networks South Eastern are proposing to carry out New service connection on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 12:43.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 4 Jun 2025
Details
View Map
Share
Follow
Shere Road

Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jun 2024 at 11:01.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Halfpenny Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 14:39.

Surrey County Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Chertsey Street

Surrey County Council are proposing to carry out Highway improvement works on Chertsey Street, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Aug 2024 at 10:02.

Surrey County Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Chertsey Street

Surrey County Council are proposing to carry out Highway improvement works on Chertsey Street, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Aug 2024 at 14:43.

UK Power Networks South Eastern logo
Between
20 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Woking Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Woking Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Mar 2024 at 11:42.

Network Rail logo
Between
22 and 25 Nov 2024
Details
View Map
Share
Follow
Bourne Road

Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Jul 2024 at 06:27.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Aug 2024 at 12:35.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Sep 2024 at 10:39.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 15:44.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
New Road

Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Jul 2024 at 15:33.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Burrows Lane

Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Aug 2024 at 08:24.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Burrows Lane

Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 14:55.

Network Rail logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Sample Oak Lane

Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Jul 2024 at 15:15.

UK Power Networks South Eastern logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hoe Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Hoe Lane, Abinger Hammer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 15:59.

UK Power Networks South Eastern logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hoe Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Hoe Lane, Abinger Hammer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 16:09.

UK Power Networks South Eastern logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Dorking Road

UK Power Networks South Eastern are proposing to carry out New service connection on Dorking Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2024 at 10:15.

UK Power Networks South Eastern logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Guildford Footpath 2/30

UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2024 at 13:12.

Affinity Water logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Applegarth Avenue

Affinity Water are proposing to carry out Utility asset works on Applegarth Avenue, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Sep 2024 at 07:30.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Sep 2024 at 09:34.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Sep 2024 at 09:42.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Sep 2024 at 09:49.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Sep 2024 at 09:57.

Thames Water logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Markenfield Road

Thames Water are proposing to carry out Utility asset works on Markenfield Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 13:20.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:55.


Roadworks Map near to Alder Grove, GUILDFORD, GU4 8FA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Sep 2024 03:06
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Alder Grove, GUILDFORD, GU4 8FA (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Network Rail logo
MAJOR
  
NEW ROAD 
(0.3 miles)
Network Rail
Works for Rail Purposes - Footway, Carriageway - Road closure
Planned
Scheduled: 21 Sep 2024 - 23 Sep 2024
0.3
Details
Share
Follow
2
Network Rail logo
MAJOR
  
NEW ROAD 
(0.3 miles)
Network Rail
Works for Rail Purposes - Footway, Carriageway - Road closure
Planned
Scheduled: 21 Sep 2024 - 23 Sep 2024
0.3
Details
Share
Follow
3
Network Rail logo
NEW ROAD 
(0.3 miles)
Network Rail
Works for Rail Purposes - Footway, Carriageway - Two-way signals
Planned
Scheduled: 20 Sep 2024 - 22 Sep 2024
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.