ROADWORKS SUMMARY
Fir Grove, BORDON, GU35 9ED

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fir Grove, GU35 9ED and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fir Grove, BORDON, GU35 9ED

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fir Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hampshire County Council logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Barleywood Farm Lane

Hampshire County Council are carrying out Highway repair and maintenance works on Barleywood Farm Lane, West Worldham, Alton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:00 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 16:12.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Cakers Lane

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Cakers Lane, East Worldham, Alton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 13:00 and could run through until 28 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 12:47.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Headley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Headley Road, Liphook.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 14:12.

Southern Gas Networks logo
LONG TERM
Between
5 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Forest Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Forest Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Jul 2024 at 10:55.

Southern Gas Networks logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Forest Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Forest Road, Liss.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 10:00 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 10:20.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Headley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Headley Road, Liphook.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 11:15 and could run through until 24 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:23.

Vattenfall Networks logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Warren Road

Vattenfall Networks are carrying out New service connection on Warren Road, Liss.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vattenfall Networks on 11 Nov 2024 at 09:33.

Hampshire County Council logo
LONG TERM
Between
12 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Bolley Avenue

Hampshire County Council are proposing to carry out Section 50 on Bolley Avenue, Whitehill, Bordon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 22 Oct 2024 at 14:19.

Hampshire County Council logo
LONG TERM
Between
12 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Bolley Avenue

Hampshire County Council are proposing to carry out Section 50 on Bolley Avenue, Whitehill, Bordon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Oct 2024 at 16:02.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Hale House Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hale House Lane, Churt, Farnham.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:21.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Crossways

Southern Gas Networks are carrying out Utility repair and maintenance works on Crossways, Churt, Farnham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 23:30 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:31.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Selborne Road

Hampshire County Council are carrying out Highway repair and maintenance works on Selborne Road, Selborne, Alton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 20:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 22 Nov 2024 at 08:19.

Hampshire County Council logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Clays Lane

Hampshire County Council are proposing to carry out Highway improvement works on Clays Lane, Binsted, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 30 Oct 2024 at 11:08.

Hampshire County Council logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Clays Lane

Hampshire County Council are proposing to carry out Highway improvement works on Clays Lane, Binsted, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 31 Oct 2024 at 10:14.

Southern Gas Networks logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Church Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Bramshott, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:11.

Hampshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Wolf's Lane

Hampshire County Council were proposing to carry out Highway improvement works on Wolf's Lane, Chawton, Alton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 7 Nov 2024 at 09:24.

Hampshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Selborne Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Selborne Road, Selborne, Alton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 7 Nov 2024 at 09:15.

Hampshire County Council logo
Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Wolf's Lane

Hampshire County Council are proposing to carry out Highway improvement works on Wolf's Lane, Chawton, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 15:20.

Hampshire County Council logo
Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Wolf's Lane

Hampshire County Council are proposing to carry out Highway improvement works on Wolf's Lane, Chawton, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 08:27.

Hampshire County Council logo
Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Selborne Road

Hampshire County Council are proposing to carry out Highway improvement works on Selborne Road, Selborne, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 15:21.

Hampshire County Council logo
Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Selborne Road

Hampshire County Council are proposing to carry out Highway improvement works on Selborne Road, Selborne, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 08:26.

South East Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Rectory Lane

South East Water are proposing to carry out New service connection on Rectory Lane, Bramshott, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 28 Oct 2024 at 10:29.

South East Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Rectory Lane

South East Water are proposing to carry out New service connection on Rectory Lane, Bramshott, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 23 Oct 2024 at 15:52.

Hampshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 16 Oct 2024 at 15:15.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Passfield Road

BT are proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:41.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Passfield Road

BT are proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Sep 2024 at 11:48.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Passfield Road

BT were proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Sep 2024 at 11:18.

Hampshire County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Headley Road, Lindford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Sep 2024 at 15:33.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Devils Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Devils Lane, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2024 at 16:11.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Devils Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Devils Lane, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Aug 2024 at 14:14.

Gigaclear logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Churt Road

Gigaclear were proposing to carry out Utility asset works on Churt Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 15 Oct 2024 at 13:53.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hale House Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Oct 2024 at 09:50.

South East Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Boundary Road

South East Water are proposing to carry out New service connection on Boundary Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 29 Oct 2024 at 13:33.

South East Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Boundary Road

South East Water are proposing to carry out New service connection on Boundary Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 8 Nov 2024 at 10:16.

South East Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
High Thicket Road

South East Water are proposing to carry out New service connection on High Thicket Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 8 Nov 2024 at 10:15.

South East Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
High Thicket Road

South East Water are proposing to carry out New service connection on High Thicket Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 29 Oct 2024 at 12:25.

Network Rail logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Mill Road

Network Rail are proposing to carry out Works for Rail Purposes on Mill Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Aug 2024 at 15:59.

BT logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Hollycombe Lane

BT were proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:53.

Hampshire County Council logo
Between
29 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:21.

Hampshire County Council logo
Between
29 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 11:46.

Hampshire County Council logo
Between
29 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Nov 2024 at 10:46.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Hollycombe Lane

BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:02.

Hampshire County Council logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 15:21.

Hampshire County Council logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:25.

Hampshire County Council logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 13:50.

Hampshire County Council logo
LONG TERM
Between
7 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Hullam Lane

Hampshire County Council are proposing to carry out Works for road purposes on Hullam Lane, Newton Valence, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 14:53.

Hampshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 13:49.

Hampshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:27.

Hampshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 11:48.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Tunbridge Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tunbridge Lane, Bramshott, Liphook.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:28.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hale House Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:36.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Hollycombe Lane

BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:00.


Roadworks Map near to Fir Grove, BORDON, GU35 9ED

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 11:35
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fir Grove, BORDON, GU35 9ED (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Giganet logo
FERNLEA, WHITEHILL 
(0.3 miles)
Giganet
Remedial works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 22 Nov 2024 14:40
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
0.3
Details
Share
Follow
2
Giganet logo
ST ANDREWS ROAD, WHITEHILL 
(0.3 miles)
Giganet
Remedial works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 15 Nov 2024 12:20
(Scheduled: 14 Nov 2024 - 28 Nov 2024)
0.3
Details
Share
Follow
3
Scottish Hydro Electric Power Dis logo
MAJOR
  
SOUTH HURST, WHITEHILL 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 7 Nov 2024 08:00
(Scheduled: 5 Nov 2024 - 4 Dec 2024)
0.5
Details
Share
Follow
4
Scottish Hydro Electric Power Dis logo
URGENT
  
ATHOLL ROAD FOOTPATHS, WHITEHILL 
(0.8 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footpath - Some carriageway incursion
Cancelled
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.8
Details
Share
5
Scottish Hydro Electric Power Dis logo
URGENT
  
ATHOLL ROAD FOOTPATHS, WHITEHILL 
(0.8 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footpath - Some carriageway incursion
In Progress
Since: 21 Nov 2024 10:03
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.8
Details
Share
Follow
6
Hampshire County Council logo
MAJOR
  
TEMPLARS WAY 
(0.8 miles)
Hampshire County Council
Works for road purposes - Footway - No carriageway incursion
Planned
Scheduled: 8 Jul 2024 - 24 Nov 2024
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.