ROADWORKS SUMMARY
Arford Road, BORDON, GU35 8BT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Arford Road, GU35 8BT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Arford Road, BORDON, GU35 8BT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Arford Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hampshire County Council logo
LONG TERM
Between
10 Mar and 10 Jun 2025
Details
View Map
Share
Follow
Longmoor Road

Hampshire County Council are proposing to carry out Section 50 on Longmoor Road, Greatham, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 12 Feb 2025 at 16:13.

Hampshire County Council logo
LONG TERM
Between
10 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Longmoor Road

Hampshire County Council are proposing to carry out Section 50 on Longmoor Road, Greatham, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 22 May 2025 at 16:13.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Tilford Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 14:04.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Frensham Heights Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frensham Heights Road, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:21.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Tilford Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 13:27.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Sturt Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sturt Road, Haslemere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 09:11.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 7 Jul 2025
Details
View Map
Share
Sturt Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sturt Road, Haslemere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 7 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 14:29.

Surrey County Council logo
LONG TERM
Between
1 May and 1 Nov 2025
Details
View Map
Share
Follow
Tilford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 13:37.

Southern Gas Networks logo
LONG TERM
Between
12 May and 29 Aug 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 16:15.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Trout Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Trout Road, Haslemere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Mar 2025 at 09:15.

Southern Gas Networks logo
LONG TERM
Between
19 May and 30 Jun 2025
Details
View Map
Share
Moorfield

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Moorfield, Camelsdale, Linchmere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 30 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 14:56.

Southern Gas Networks logo
Between
19 May and 10 Jun 2025
Details
View Map
Share
Camelsdale Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Camelsdale Road, Camelsdale, Linchmere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 10 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 11:03.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Summerfield Lane

Surrey County Council are carrying out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 May 2025 at 09:34.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Critchmere Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Critchmere Hill, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 08:35.

Surrey County Council logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Bacon Lane

Surrey County Council are carrying out Highway repair and maintenance works on Bacon Lane, Frensham, Farnham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 00:11 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Jun 2025 at 09:08.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are carrying out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 00:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 2 Jun 2025 at 09:36.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Headley Road

Hampshire County Council were proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 29 May 2025 at 10:44.

South East Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hollycombe Lane

South East Water are carrying out Utility repair and maintenance works on Hollycombe Lane, Linch.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 12:25 and could run through until 4 June 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 30 May 2025 at 11:43.

Surrey County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Tilford Road

Surrey County Council are carrying out Highway repair and maintenance works on Tilford Road, Hindhead.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 00:17 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Jun 2025 at 12:28.

Hampshire County Council logo
LONG TERM
Between
2 Jun and 6 Jul 2025
Details
View Map
Share
Station Road

Hampshire County Council were proposing to carry out Highway improvement works on Station Road, Bordon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 29 May 2025 at 16:48.

Hampshire County Council logo
LONG TERM
Between
2 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Station Road

Hampshire County Council are proposing to carry out Highway improvement works on Station Road, Bordon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 3 Apr 2025 at 15:27.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Weydown Road

Thames Water were proposing to carry out Utility repair and maintenance works on Weydown Road, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 5 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 14 Mar 2025 at 12:11.

Surrey County Council logo
Between
8 and 13 Jun 2025
Details
View Map
Share
Follow
The Long Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Long Road, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 13:22.

Surrey County Council logo
Between
8 and 13 Jun 2025
Details
View Map
Share
Follow
High Thicket Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Thicket Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 13:23.

Surrey County Council logo
Between
8 and 13 Jun 2025
Details
View Map
Share
Follow
High Thicket Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Thicket Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 14:21.

Surrey County Council logo
Between
8 and 13 Jun 2025
Details
View Map
Share
Follow
High Thicket Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Thicket Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 13:41.

Surrey County Council logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Churt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 Jan 2025 at 09:11.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Greenhanger

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenhanger, Churt, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 09:13.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Green Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Churt, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 09:13.

Surrey County Council logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Churt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 13:29.

Surrey County Council logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Hindhead Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hindhead Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 13:35.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Jun 2025
Details
View Map
Share
Follow
The Old Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Old Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 May 2024 at 12:17.

Surrey County Council logo
Between
12 and 19 Jun 2025
Details
View Map
Share
Follow
High Thicket Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Thicket Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Jan 2025 at 10:56.

Surrey County Council logo
Between
12 and 19 Jun 2025
Details
View Map
Share
Follow
The Long Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Long Road, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Jan 2025 at 10:34.

Surrey County Council logo
Between
12 and 19 Jun 2025
Details
View Map
Share
Follow
High Thicket Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Thicket Road, Dockenfield, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jan 2025 at 11:39.

BT logo
Between
21 Jun and 5 Jul 2025
Details
View Map
Share
Hamlash Lane

BT were proposing to carry out Utility asset works on Hamlash Lane, Frensham, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Apr 2025 at 10:58.

BT logo
Between
21 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Hamlash Lane

BT are proposing to carry out Utility asset works on Hamlash Lane, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 5 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 8 Apr 2025 at 13:51.

BT logo
Between
21 Jun and 5 Jul 2025
Details
View Map
Share
Fifield Lane

BT were proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Apr 2025 at 10:58.

BT logo
Between
21 Jun and 5 Jul 2025
Details
View Map
Share
Fifield Lane

BT were proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 9 Apr 2025 at 13:17.

Thames Water logo
Between
30 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Kings Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 10:53.

Thames Water logo
Between
30 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Kings Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 10:49.

Thames Water logo
Between
30 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Kings Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kings Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:38.

Hampshire County Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Green Street

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Green Street, Kingsley, Bordon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 10 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 1 Apr 2025 at 11:57.

Hampshire County Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Hogmoor Road

Hampshire County Council are proposing to carry out Highway improvement works on Hogmoor Road, Whitehill, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Jun 2025 at 10:02.

Hampshire County Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Hogmoor Road

Hampshire County Council are proposing to carry out Highway improvement works on Hogmoor Road, Whitehill, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Jun 2025 at 09:33.

BT logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Fifield Lane

BT are proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Apr 2025 at 08:58.

BT logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Hamlash Lane

BT are proposing to carry out Utility asset works on Hamlash Lane, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Apr 2025 at 08:58.

Hampshire County Council logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Petersfield Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Petersfield Road, Whitehill, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 25 Mar 2025 at 14:15.

Hampshire County Council logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Petersfield Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Petersfield Road, Whitehill, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 6 Feb 2025 at 15:25.

BT logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Hammer Lane

BT are proposing to carry out Utility asset works on Hammer Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Apr 2025 at 11:42.

BT logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Hammer Lane

BT are proposing to carry out Utility asset works on Hammer Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 Mar 2025 at 10:42.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Blacknest Road

BT are proposing to carry out Utility asset works on Blacknest Road, Binsted, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Apr 2025 at 16:28.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Blacknest Road

BT are proposing to carry out Utility asset works on Blacknest Road, Binsted, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 May 2025 at 15:00.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Station Road

BT are proposing to carry out Utility asset works on Station Road, Bentley, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Apr 2025 at 16:28.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Station Road

BT are proposing to carry out Utility asset works on Station Road, Bentley, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 May 2025 at 16:30.

Southern Gas Networks logo
LONG TERM
Between
22 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Moorfield

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Moorfield, Camelsdale, Linchmere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:28.

Southern Gas Networks logo
LONG TERM
Between
22 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Sturt Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sturt Avenue, Camelsdale, Linchmere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:34.

Surrey County Council logo
Between
25 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Churt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Apr 2025 at 08:02.

Scottish Hydro Electric Power Dis logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Trout Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Trout Road, Haslemere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Mar 2025 at 08:14.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 6 Oct 2025
Details
View Map
Share
Sturt Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sturt Road, Haslemere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 6 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:54.

Southern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Liphook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Liphook Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 12:11.

Southern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Liphook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Liphook Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 08:42.

Southern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Liphook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Liphook Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:48.

Southern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Liphook Road

Southern Gas Networks were proposing to carry out Remedial works on Liphook Road, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Feb 2025 at 15:36.

Scottish Hydro Electric Power Dis logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Trout Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Trout Road, Haslemere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 15 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Apr 2025 at 12:57.

Southern Gas Networks logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Dolphin Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dolphin Close, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 15:08.

BT logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Station Road

BT were proposing to carry out Utility asset works on Station Road, Bentley, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 6 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 20 May 2025 at 15:48.

Hampshire County Council logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Green Street

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Green Street, Kingsley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 9 Apr 2025 at 11:34.

Southern Gas Networks logo
Between
11 and 22 Aug 2025
Details
View Map
Share
Dolphin Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Dolphin Close, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 15:06.

South East Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Lower Hanger

South East Water are proposing to carry out Utility repair and maintenance works on Lower Hanger, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 21 May 2025 at 09:14.

Scottish Hydro Electric Power Dis logo
Between
12 and 21 Aug 2025
Details
View Map
Share
The Old Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on The Old Lane, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2025 and run through until 21 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Aug 2024 at 13:22.

BT logo
Between
25 and 27 Aug 2025
Details
View Map
Share
Station Road

BT were proposing to carry out Utility asset works on Station Road, Bentley, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 27 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 20 May 2025 at 16:09.

BT logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Station Road

BT are proposing to carry out Utility asset works on Station Road, Bentley, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 May 2025 at 10:00.

BT logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Blacknest Road

BT are proposing to carry out Utility asset works on Blacknest Road, Binsted, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 May 2025 at 09:59.


Roadworks Map near to Arford Road, BORDON, GU35 8BT (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 14:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Arford Road, BORDON, GU35 8BT (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Hampshire County Council logo
STANDFORD LANE, STANDFORD 
(0.9 miles)
Hampshire County Council
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 3 Jun 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.