View current and future planned roadworks and road closures for Washford Lane, GU35 0RT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Washford Lane, BORDON, GU35 0RT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Washford Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
1 Nov 2025
Hampshire County Council are carrying out Highway repair and maintenance works on Barleywood Farm Lane, West Worldham, Alton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 08:00 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 4 Jun 2025 at 15:40.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Frensham Heights Road, Rowledge, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 14:15.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 14:04.
1 Apr and 1 Oct 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 13:27.
1 May and 1 Nov 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 13:37.
11 Aug and 6 Oct 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hollycombe Lane, Linch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 31 Jul 2025 at 11:19.
18 Aug and 26 Oct 2025
Hampshire County Council are proposing to carry out Highway improvement works on Bolley Avenue, Whitehill, Bordon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 8 Aug 2025 at 13:46.
18 Aug and 26 Oct 2025
Hampshire County Council are proposing to carry out Highway improvement works on Bolley Avenue, Whitehill, Bordon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 8 Aug 2025 at 11:27.
18 Aug and 13 Oct 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hollycombe Lane, Linch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 11 Aug 2025 at 08:14.
Today
Hampshire County Council are carrying out Highway improvement works on Woolmer Lane, Bramshott, Liphook.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:13 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 1 Sep 2025 at 08:14.
19 Oct 2025
Hampshire County Council are carrying out Highway improvement works on Station Road, Bordon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 08:00 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 8 Sep 2025 at 11:00.
9 and 26 Sep 2025
Hampshire County Council were proposing to carry out Highway repair and maintenance works on Locke Road, Liphook.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 7 Aug 2025 at 08:22.
9 and 26 Sep 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Locke Road, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 21 Mar 2025 at 12:16.
Today
Network Rail were proposing to carry out Works for Rail Purposes on Blacknest Road, Binsted, Alton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 17 Jul 2025 at 09:42.
Today
Network Rail are proposing to carry out Works for Rail Purposes on Blacknest Road, Binsted, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 3 Jun 2025 at 10:36.
15 and 26 Sep 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Norris Close, Whitehill, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 6 Feb 2025 at 15:29.
22 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Kennel Lane, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Sep 2025 at 08:12.
22 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Kennel Lane, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 9 Jul 2025 at 09:44.
22 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Sep 2025 at 08:13.
22 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Fifield Lane, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 9 Jul 2025 at 09:45.
Wednesday
West Sussex County Council are proposing to carry out Highway improvement works on Hammer Lane, Hammer, Linchmere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 24 September 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 Sep 2025 at 13:51.
26 Sep and 25 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Mill Road, Liss.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Jul 2024 at 12:53.
26 Sep and 25 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Mill Road, Liss.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Jul 2025 at 12:18.
29 Sep and 2 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Liphook.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 16:44.
6 and 14 Oct 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Picketts Hill, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 23 Jul 2025 at 15:45.
6 and 14 Oct 2025
Hampshire County Council were proposing to carry out Highway repair and maintenance works on Frensham Lane, Headley, Bordon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 14 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 15:25.
6 and 14 Oct 2025
Hampshire County Council were proposing to carry out Highway repair and maintenance works on Spats Lane, Headley, Bordon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 14 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 15:23.
8 and 10 Oct 2025
BT are proposing to carry out Utility asset works on Churt Road, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 13 Jun 2025 at 15:02.
8 and 10 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 11:13.
8 and 10 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 10:08.
8 and 10 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 11:13.
8 and 10 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 10:09.
14 Oct 2025 and 14 Mar 2026
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frensham Heights Road, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Jul 2025 at 12:07.
23 Oct and 21 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Star Hill, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 08:26.
23 Oct and 21 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Star Hill, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:56.
29 Oct and 4 Nov 2025
Hampshire County Council were proposing to carry out Highway repair and maintenance works on Standford Lane, Standford, Bordon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 2 Sep 2025 at 09:42.
29 Oct and 4 Nov 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Standford Lane, Standford, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 30 Jul 2025 at 11:16.
29 Oct and 4 Nov 2025
Hampshire County Council are proposing to carry out Highway improvement works on Tulls Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 30 Jul 2025 at 11:16.
29 Oct and 4 Nov 2025
Hampshire County Council were proposing to carry out Highway improvement works on Tulls Lane, Headley, Bordon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 2 Sep 2025 at 09:41.
30 Oct and 3 Nov 2025
Hampshire County Council are proposing to carry out Highway improvement works on Tulls Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 29 Jul 2025 at 10:41.
30 Oct and 3 Nov 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Standford Lane, Standford, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 29 Jul 2025 at 10:41.
3 and 11 Nov 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Frensham Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 16:12.
3 and 11 Nov 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Frensham Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 11 Sep 2025 at 13:02.
3 and 11 Nov 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Spats Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 11 Sep 2025 at 13:02.
3 and 11 Nov 2025
Hampshire County Council are proposing to carry out Highway improvement works on Picketts Hill, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 16:15.
3 and 11 Nov 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Spats Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 10 Sep 2025 at 16:12.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2025 at 08:57.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 13 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Jul 2025 at 08:50.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 08:50.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 13 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2025 at 15:42.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fullers Road, Rowledge, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Jul 2025 at 08:46.
24 Nov 2025 and 13 Feb 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on High Street, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2025 at 09:00.
24 and 28 Nov 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Standford Lane, Standford, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 2 Sep 2025 at 16:31.
24 Nov and 3 Dec 2025
Hampshire County Council were proposing to carry out Highway repair and maintenance works on Station Road, Bordon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Dec 2024 at 13:20.
24 Nov and 3 Dec 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 3 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 18 Dec 2024 at 12:19.
26 Nov and 11 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 16:45.
26 and 28 Nov 2025
BT are proposing to carry out Utility asset works on Oakhanger Road, Oakhanger, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 Aug 2025 at 15:35.
26 and 28 Nov 2025
BT are proposing to carry out Utility asset works on Oakhanger Road, Oakhanger, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Aug 2025 at 15:29.
26 and 28 Nov 2025
BT are proposing to carry out Utility asset works on Oakhanger Road, Oakhanger, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 19 Aug 2025 at 11:49.
1 and 3 Dec 2025
South East Water are proposing to carry out New service connection on The Street, Binsted, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 10 Sep 2025 at 14:14.
1 and 3 Dec 2025
South East Water are proposing to carry out New service connection on The Street, Binsted, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 8 Sep 2025 at 08:33.
1 and 3 Dec 2025
South East Water are proposing to carry out New service connection on The Street, Binsted, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 29 Aug 2025 at 14:13.
2 and 4 Dec 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Churt Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 08:50.
2 and 4 Dec 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Churt Road, Hindhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 08:50.
15 and 17 Dec 2025
South East Water are proposing to carry out Utility repair and maintenance works on Hewshott Lane, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 17 Sep 2025 at 07:35.
15 and 17 Dec 2025
South East Water are proposing to carry out Utility repair and maintenance works on Hewshott Lane, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 16 Sep 2025 at 14:09.
Roadworks Map near to Washford Lane, BORDON, GU35 0RT (4 Events)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Washford Lane, BORDON, GU35 0RT (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 8 Sep 2025 - 19 Oct 2025)
Contains public sector information licensed under the Open Government Licence v3.0.