ROADWORKS SUMMARY
Blacknest Road, ALTON, GU34 4QB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Blacknest Road, GU34 4QB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Blacknest Road, ALTON, GU34 4QB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Blacknest Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Station Hill

Surrey County Council are proposing to carry out Highway improvement works on Station Hill, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:36.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Farnham By-pass

Surrey County Council are proposing to carry out Highway improvement works on Farnham By-pass, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:38.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Longbridge

Surrey County Council are proposing to carry out Highway improvement works on Longbridge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:42.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Lower Church Lane

Surrey County Council are proposing to carry out Highway improvement works on Lower Church Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:43.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Victoria Road

Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Union Road

Surrey County Council are proposing to carry out Highway improvement works on Union Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Upper Church Lane

Surrey County Council are proposing to carry out Highway improvement works on Upper Church Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:45.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:40.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
West Street

Surrey County Council are proposing to carry out Highway improvement works on West Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:46.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Downing Street

Surrey County Council are proposing to carry out Highway improvement works on Downing Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:44.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Bear Lane

Surrey County Council are proposing to carry out Highway improvement works on Bear Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
The Borough

Surrey County Council are proposing to carry out Highway improvement works on The Borough, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Woolmead

Surrey County Council are proposing to carry out Highway improvement works on Woolmead, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:49.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
East Street

Surrey County Council are proposing to carry out Highway improvement works on East Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:50.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Castle Street

Surrey County Council are proposing to carry out Highway improvement works on Castle Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:47.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:39.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Farnham Footpath 171/20

Surrey County Council are proposing to carry out Highway improvement works on Farnham Footpath 171/20, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footpath only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 12:48.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 17 Mar 2025
Details
View Map
Share
Follow
Lodge Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 14:12.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Old Compton Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Compton Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2024 at 08:52.

Hampshire County Council logo
LONG TERM
Between
12 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bolley Avenue

Hampshire County Council are proposing to carry out Section 50 on Bolley Avenue, Whitehill, Bordon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 22 Jan 2025 at 16:50.

Surrey County Council logo
LONG TERM
Between
19 Nov 2024 and 19 May 2025
Details
View Map
Share
Follow
Lickfolds Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lickfolds Road, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 11:44.

Southern Gas Networks logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Green Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 15 Jan 2024 at 14:11.

Surrey County Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Alton Road

Surrey County Council are proposing to carry out Highway improvement works on Alton Road, Farnham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 08:26.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Station Hill

Surrey County Council were proposing to carry out Highway improvement works on Station Hill, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:56.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Farnham By-pass

Surrey County Council were proposing to carry out Highway improvement works on Farnham By-pass, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:52.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Longbridge

Surrey County Council were proposing to carry out Highway improvement works on Longbridge, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:54.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Lower Church Lane

Surrey County Council were proposing to carry out Highway improvement works on Lower Church Lane, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:55.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Upper Church Lane

Surrey County Council were proposing to carry out Highway improvement works on Upper Church Lane, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:57.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
South Street

Surrey County Council were proposing to carry out Highway improvement works on South Street, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:55.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Union Road

Surrey County Council were proposing to carry out Highway improvement works on Union Road, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:57.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
West Street

Surrey County Council were proposing to carry out Highway improvement works on West Street, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:57.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Victoria Road

Surrey County Council were proposing to carry out Highway improvement works on Victoria Road, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:57.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Downing Street

Surrey County Council were proposing to carry out Highway improvement works on Downing Street, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:53.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
The Borough

Surrey County Council were proposing to carry out Highway improvement works on The Borough, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:56.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Bear Lane

Surrey County Council were proposing to carry out Highway improvement works on Bear Lane, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:52.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Woolmead

Surrey County Council were proposing to carry out Highway repair and maintenance works on Woolmead, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:58.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
East Street

Surrey County Council were proposing to carry out Highway improvement works on East Street, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:53.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Park Row

Surrey County Council were proposing to carry out Highway improvement works on Park Row, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:55.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
High Park Road

Surrey County Council were proposing to carry out Highway improvement works on High Park Road, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 10:11.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Castle Street

Surrey County Council were proposing to carry out Highway improvement works on Castle Street, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 09:52.

Hampshire County Council logo
LONG TERM
Between
15 Jan and 12 Mar 2025
Details
View Map
Share
Follow
Anstey Road

Hampshire County Council are proposing to carry out Works for road purposes on Anstey Road, Alton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 14 Jan 2025 at 12:08.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Lodge Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:10.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
Lindford Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Lindford Road, Bordon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 January 2025 at 09:45 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Feb 2025 at 16:09.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Tilford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:47.

Southern Gas Networks logo
Between
4 Feb and 4 Mar 2025
Details
View Map
Share
Bourne Grove

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bourne Grove, Lower Bourne, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Feb 2025 at 15:43.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Oakhanger Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Oakhanger Road, Oakhanger, Bordon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Nov 2024 at 12:07.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Cakers Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Cakers Lane, East Worldham, Alton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 08:54.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
The Street

Thames Water are proposing to carry out Utility repair and maintenance works on The Street, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 15:57.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Hale House Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:36.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Hale House Lane

Southern Gas Networks were proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 14:39.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Sheephatch Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Sheephatch Lane, Tilford, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 13:18.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Burnt Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Burnt Hill Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Feb 2025 at 09:51.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Tilford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Feb 2025 at 15:45.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Wrecclesham Road

Network Rail were proposing to carry out Works for Rail Purposes on Wrecclesham Road, Wrecclesham, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 12:41.

Surrey County Council logo
LONG TERM
Between
17 Feb and 29 Nov 2025
Details
View Map
Share
Follow
Downing Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Downing Street, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:06.

Surrey County Council logo
LONG TERM
Between
17 Feb and 29 Nov 2025
Details
View Map
Share
Follow
Downing Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Downing Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 14:48.

Surrey County Council logo
LONG TERM
Between
17 Feb and 29 Nov 2025
Details
View Map
Share
Follow
West Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on West Street, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:09.

Surrey County Council logo
LONG TERM
Between
17 Feb and 29 Nov 2025
Details
View Map
Share
Follow
West Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on West Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 14:48.

Surrey County Council logo
LONG TERM
Between
17 Feb and 29 Nov 2025
Details
View Map
Share
Follow
The Borough

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Borough, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:08.

Surrey County Council logo
LONG TERM
Between
17 Feb and 29 Nov 2025
Details
View Map
Share
Follow
The Borough

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Borough, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 14:49.

Hampshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Doras Green Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Doras Green Lane, Crondall, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 27 Jan 2025 at 09:07.

Hampshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Doras Green Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Doras Green Lane, Crondall, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 29 Jan 2025 at 15:19.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Doras Green Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Doras Green Lane, Crondall, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 10 Feb 2025 at 14:55.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Burnt Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Burnt Hill Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 07:03.

Surrey County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Sheephatch Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Sheephatch Lane, Tilford, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 13:19.

Surrey County Council logo
LONG TERM
Between
24 Feb and 29 May 2025
Details
View Map
Share
Follow
Downing Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Downing Street, Farnham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:04.

Surrey County Council logo
LONG TERM
Between
24 Feb and 29 May 2025
Details
View Map
Share
Follow
Downing Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Downing Street, Farnham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 14:52.

Surrey County Council logo
LONG TERM
Between
24 Feb and 29 May 2025
Details
View Map
Share
Follow
Longbridge

Surrey County Council are proposing to carry out Highway repair and maintenance works on Longbridge, Farnham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 10:05.

Surrey County Council logo
LONG TERM
Between
24 Feb and 29 May 2025
Details
View Map
Share
Follow
Longbridge

Surrey County Council are proposing to carry out Highway repair and maintenance works on Longbridge, Farnham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 14:51.

Scottish Hydro Electric Power Dis logo
Between
1 and 5 Mar 2025
Details
View Map
Share
Follow
Oakhanger Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oakhanger Road, Oakhanger, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 14:12.

Scottish Hydro Electric Power Dis logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
York Close Footpaths

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on York Close Footpaths, Whitehill, Bordon.

These works are categorised as Major.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Feb 2025 at 15:14.

Hampshire County Council logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Pond Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Pond Road, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 28 Nov 2024 at 15:42.

Hampshire County Council logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 30 Jan 2025 at 16:15.

Hampshire County Council logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 13:37.

Hampshire County Council logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 30 Jan 2025 at 16:04.

Hampshire County Council logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 13:36.

Scottish Hydro Electric Power Dis logo
Between
5 and 19 Mar 2025
Details
View Map
Share
Follow
Louisburg Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Louisburg Avenue, Bordon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Feb 2025 at 15:25.

Hampshire County Council logo
Between
5 and 14 Mar 2025
Details
View Map
Share
Follow
Doras Green Lane

Hampshire County Council are proposing to carry out Highway improvement works on Doras Green Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Sep 2024 at 11:22.

Hampshire County Council logo
Between
6 and 13 Mar 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 30 Jan 2025 at 16:00.

Hampshire County Council logo
Between
6 and 13 Mar 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 13:27.

Hampshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Chalet Hill

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Chalet Hill, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Feb 2025 at 16:22.

Thames Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Burnt Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Burnt Hill Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 09:31.

Surrey County Council logo
LONG TERM
Between
10 Mar and 30 May 2025
Details
View Map
Share
Follow
Farnham By-pass

Surrey County Council are proposing to carry out Works for road purposes on Farnham By-pass, Farnham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 3 Feb 2025 at 08:57.

Surrey County Council logo
LONG TERM
Between
10 Mar and 30 May 2025
Details
View Map
Share
Follow
Farnham By-pass

Surrey County Council are proposing to carry out Works for road purposes on Farnham By-pass, Farnham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 3 Feb 2025 at 10:27.

Scottish Hydro Electric Power Dis logo
Between
11 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Oakhanger Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oakhanger Road, Bordon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Feb 2025 at 08:25.

Hampshire County Council logo
Between
11 and 25 Mar 2025
Details
View Map
Share
Follow
Pond Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Pond Road, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 5 Dec 2024 at 15:37.

Hampshire County Council logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Doras Green Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Doras Green Lane, Crondall, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Feb 2025 at 08:44.

Scottish Hydro Electric Power Dis logo
Between
17 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Cakers Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cakers Lane, East Worldham, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Jan 2025 at 14:49.

Scottish Hydro Electric Power Dis logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Tilford Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Tilford Road, Tilford, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 09:52.

Surrey County Council logo
Between
27 and 31 Mar 2025
Details
View Map
Share
Follow
Upper Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Upper Way, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Feb 2025 at 12:56.

South East Water logo
Between
31 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Green Lane

South East Water are proposing to carry out Utility repair and maintenance works on Green Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 12 Dec 2024 at 09:47.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Tilford Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 14:04.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Tilford Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 13:27.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Frensham Heights Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frensham Heights Road, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:21.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Little Green Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Little Green Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2024 at 14:10.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Upper Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Upper Way, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 09:45.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Union Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Union Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:26.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 10:17.

Hampshire County Council logo
Between
3 and 9 Apr 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Feb 2025 at 15:42.

South East Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Green Lane

South East Water are proposing to carry out Utility repair and maintenance works on Green Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 2 Jan 2025 at 08:24.

South East Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Green Lane

South East Water are proposing to carry out Utility repair and maintenance works on Green Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 8 Jan 2025 at 14:38.

Thames Water logo
Between
7 and 13 Apr 2025
Details
View Map
Share
Follow
The Street

Thames Water are proposing to carry out Utility repair and maintenance works on The Street, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 13:23.

Scottish Hydro Electric Power Dis logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Tilford Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Tilford Road, Tilford, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Dec 2024 at 14:35.

Scottish Hydro Electric Power Dis logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Tilford Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Tilford Road, Tilford, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Jan 2025 at 11:20.

Surrey County Council logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
The Long Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Long Road, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Feb 2025 at 09:05.

Surrey County Council logo
LONG TERM
Between
1 May and 1 Nov 2025
Details
View Map
Share
Follow
Tilford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 13:37.

Surrey County Council logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Tilford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tilford Road, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 14:21.

Hampshire County Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
London Road

Hampshire County Council are proposing to carry out Highway improvement works on London Road, Holybourne, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Sep 2024 at 16:01.

Hampshire County Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
London Road

Hampshire County Council are proposing to carry out Highway improvement works on London Road, Holybourne, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 17 Sep 2024 at 11:40.

Hampshire County Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
London Road

Hampshire County Council are proposing to carry out Highway improvement works on London Road, Holybourne, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Sep 2024 at 15:33.

Hampshire County Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Crondall Lane

Hampshire County Council are proposing to carry out Highway improvement works on Crondall Lane, Crondall, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 15:48.

Hampshire County Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Crondall Lane

Hampshire County Council are proposing to carry out Highway improvement works on Crondall Lane, Crondall, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 29 Jan 2025 at 11:57.

Hampshire County Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Dippenhall Street

Hampshire County Council are proposing to carry out Highway improvement works on Dippenhall Street, Crondall, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 15:49.

Hampshire County Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Dippenhall Street

Hampshire County Council are proposing to carry out Highway improvement works on Dippenhall Street, Crondall, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 29 Jan 2025 at 14:13.

Hampshire County Council logo
Between
14 and 29 May 2025
Details
View Map
Share
Follow
Blanket Street

Hampshire County Council are proposing to carry out Highway improvement works on Blanket Street, East Worldham, Alton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 14:19.

Hampshire County Council logo
Between
15 and 29 May 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Feb 2025 at 11:51.

Hampshire County Council logo
Between
16 and 30 May 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Feb 2025 at 11:51.

Hampshire County Council logo
Between
16 and 30 May 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Feb 2025 at 11:51.


Roadworks Map near to Blacknest Road, ALTON, GU34 4QB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Feb 2025 16:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Blacknest Road, ALTON, GU34 4QB (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.