ROADWORKS SUMMARY
Rogate, PETERSFIELD, GU31 5EQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for GU31 5EQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Rogate, PETERSFIELD, GU31 5EQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
16 Dec 2024 and 5 May 2025
Details
View Map
Share
Follow
South Gardens

West Sussex County Council are proposing to carry out Highway repair and maintenance works on South Gardens, South Harting.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 5 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 11 Dec 2024 at 15:07.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Hollist Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 08:36.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Hollist Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:57.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Hollist Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 09:20.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 25 May 2025
Details
View Map
Share
Easebourne Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Easebourne Street, Easebourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 25 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:44.

West Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
North Street

West Sussex County Council are carrying out Highway improvement works on North Street, Midhurst.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 January 2025 at 00:21 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 24 Jan 2025 at 10:55.

Southern Gas Networks logo
Until
14 Feb 2025
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Egmont Road, Easebourne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:00 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jan 2025 at 09:28.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Easebourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 13:23.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Easebourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Jan 2025 at 08:38.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Easebourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 12:03.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Egmont Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Egmont Road, Easebourne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:53.

Southern Gas Networks logo
Between
20 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Chichester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chichester Road, West Lavington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 09:39.

BT logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Hollycombe Lane

BT were proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:53.

Southern Gas Networks logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
New Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on New Road, Midhurst.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:49.

West Sussex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hammer Lane

West Sussex County Council are carrying out Highway improvement works on Hammer Lane, Iping.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 12:31 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 14:17.

West Sussex County Council logo
Finishing
Wednesday
Details
View Map
Share
Bepton Road

West Sussex County Council were proposing to carry out Highway improvement works on Bepton Road, Bepton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Dec 2024 at 13:47.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Hollycombe Lane

BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:02.

Southern Water logo
Between
4 Feb and 6 Mar 2025
Details
View Map
Share
June Lane

Southern Water were proposing to carry out Utility repair and maintenance works on June Lane, Midhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 16:26.

Southern Water logo
Finishing
Thursday
Details
View Map
Share
Follow
June Lane

Southern Water are proposing to carry out Utility repair and maintenance works on June Lane, Midhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 8 Nov 2024 at 14:17.

Southern Water logo
Finishing
Thursday
Details
View Map
Share
June Lane

Southern Water were proposing to carry out Utility repair and maintenance works on June Lane, Midhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 14:15.

West Sussex County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Bepton Road

West Sussex County Council are proposing to carry out Highway improvement works on Bepton Road, Bepton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Dec 2024 at 07:49.

Southern Gas Networks logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Selham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Selham Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 2 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:46.

West Sussex County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Bepton Road

West Sussex County Council are proposing to carry out Highway improvement works on Bepton Road, Bepton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 19 Dec 2024 at 11:20.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Rogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 3 Jan 2025 at 11:23.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Rogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 3 Jan 2025 at 10:46.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Hollycombe Lane

BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Jan 2025 at 08:30.

West Sussex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
B2146 Compton Down To Harting Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on B2146 Compton Down To Harting Hill, South Harting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 13 Dec 2024 at 10:46.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Cinder Lane

BT are proposing to carry out Utility asset works on Cinder Lane, Milland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:01.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Cinder Lane

BT are proposing to carry out Utility asset works on Cinder Lane, Milland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Jan 2025 at 08:31.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Hollycombe Lane

BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:00.

West Sussex County Council logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
B2146 Compton Down To Harting Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on B2146 Compton Down To Harting Hill, South Harting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 3 Jan 2025 at 08:47.

West Sussex County Council logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
B2146 Elsted Road To Torberry Lane

West Sussex County Council are proposing to carry out Section 50 on B2146 Elsted Road To Torberry Lane, South Harting.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 19 Dec 2024 at 08:59.

Network Rail logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Andlers Ash Road

Network Rail are proposing to carry out Works for Rail Purposes on Andlers Ash Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Nov 2024 at 11:46.

West Sussex County Council logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
B2146 Compton Down To Harting Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on B2146 Compton Down To Harting Hill, South Harting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Dec 2024 at 15:13.

Network Rail logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Andlers Ash Road

Network Rail are proposing to carry out Works for Rail Purposes on Andlers Ash Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jan 2025 at 12:10.

BT logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Hollycombe Lane

BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Jan 2025 at 07:51.

Network Rail logo
Between
21 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2024 at 09:18.

Network Rail logo
Between
21 and 31 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jan 2025 at 12:18.

Southern Gas Networks logo
Between
24 Mar and 13 Apr 2025
Details
View Map
Share
Selham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Selham Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 13 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:51.

West Sussex County Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
North Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on North Lane, South Harting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 19 Dec 2024 at 08:12.

West Sussex County Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
North Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on North Lane, South Harting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Dec 2024 at 11:40.

West Sussex County Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Brambling Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Brambling Lane, Woolbeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 13:37.

Network Rail logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
School Lane

Network Rail are proposing to carry out Works for Rail Purposes on School Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Nov 2024 at 16:14.

Network Rail logo
Between
28 and 31 Mar 2025
Details
View Map
Share
Follow
Kingsfernsden Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kingsfernsden Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jan 2025 at 12:21.

Network Rail logo
Between
28 and 31 Mar 2025
Details
View Map
Share
Follow
Kingsfernsden Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kingsfernsden Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Nov 2024 at 16:12.

West Sussex County Council logo
LONG TERM
Between
31 Mar and 11 May 2025
Details
View Map
Share
Follow
B2146 Compton Down To Harting Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on B2146 Compton Down To Harting Hill, South Harting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 19 Nov 2024 at 14:28.

National Grid Electricity Transmission logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Woolbeding Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Woolbeding Lane, Woolbeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 23 Jan 2025 at 10:40.

National Grid Electricity Transmission logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Woolbeding Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Woolbeding Lane, Woolbeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 17 Jan 2025 at 12:11.

West Sussex County Council logo
LONG TERM
Between
31 Mar and 11 May 2025
Details
View Map
Share
Follow
B2146 Compton Down To Harting Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on B2146 Compton Down To Harting Hill, South Harting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 19 Nov 2024 at 14:19.

National Grid Electricity Transmission logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Chithurst Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Chithurst Lane, Chithurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 15 Jan 2025 at 07:58.

West Sussex County Council logo
LONG TERM
Between
31 Mar and 11 May 2025
Details
View Map
Share
B2146 Compton Down To Harting Hill

West Sussex County Council were proposing to carry out Section 50 on B2146 Compton Down To Harting Hill, South Harting.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 12:37.

West Sussex County Council logo
LONG TERM
Between
31 Mar and 11 May 2025
Details
View Map
Share
Follow
B2146 Compton Down To Harting Hill

West Sussex County Council are proposing to carry out Section 50 on B2146 Compton Down To Harting Hill, South Harting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Jan 2025 at 14:44.

National Grid Electricity Transmission logo
Between
1 and 8 Apr 2025
Details
View Map
Share
Follow
Chithurst Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Chithurst Lane, Chithurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 22 Jan 2025 at 13:48.

National Grid Electricity Transmission logo
Between
1 and 8 Apr 2025
Details
View Map
Share
Follow
Chithurst Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Chithurst Lane, Chithurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 24 Jan 2025 at 11:27.

South East Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Chapel Street

South East Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 14 Jan 2025 at 16:22.

Southern Gas Networks logo
Between
7 and 27 Apr 2025
Details
View Map
Share
Church Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 27 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:25.

Southern Gas Networks logo
Between
7 and 27 Apr 2025
Details
View Map
Share
Church Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 27 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:13.

West Sussex County Council logo
Between
9 and 18 Apr 2025
Details
View Map
Share
Follow
Wardley Lane

West Sussex County Council are proposing to carry out Highway improvement works on Wardley Lane, Milland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 13:32.

Southern Gas Networks logo
Between
10 Apr and 9 May 2025
Details
View Map
Share
Hollist Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 April 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 15:06.

Network Rail logo
Between
11 and 14 Apr 2025
Details
View Map
Share
Follow
Kingsfernsden Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kingsfernsden Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jan 2025 at 12:22.

Network Rail logo
Between
12 and 14 Apr 2025
Details
View Map
Share
Follow
Kingsfernsden Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kingsfernsden Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Sep 2024 at 11:25.

Network Rail logo
Between
12 and 14 Apr 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jan 2025 at 16:16.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 16 May 2025
Details
View Map
Share
Follow
Hollist Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 11:27.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 16 May 2025
Details
View Map
Share
Follow
Hollist Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Jan 2025 at 13:56.

Hampshire County Council logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Pulens Lane

Hampshire County Council are proposing to carry out Highway improvement works on Pulens Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Jan 2025 at 15:53.

Hampshire County Council logo
LONG TERM
Between
15 Apr 2025 and 17 Apr 2026
Details
View Map
Share
Follow
Pulens Lane

Hampshire County Council are proposing to carry out Highway improvement works on Pulens Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 14:26.

Hampshire County Council logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Pulens Lane

Hampshire County Council are proposing to carry out Highway improvement works on Pulens Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 10 Jan 2025 at 15:57.

Hampshire County Council logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Pulens Lane

Hampshire County Council are proposing to carry out Highway improvement works on Pulens Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jan 2025 at 13:04.

Network Rail logo
Between
18 and 21 Apr 2025
Details
View Map
Share
Follow
Andlers Ash Road

Network Rail are proposing to carry out Works for Rail Purposes on Andlers Ash Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Jan 2025 at 14:47.

Network Rail logo
Between
18 and 21 Apr 2025
Details
View Map
Share
Follow
School Lane

Network Rail are proposing to carry out Works for Rail Purposes on School Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Jan 2025 at 14:47.

Network Rail logo
Between
19 and 21 Apr 2025
Details
View Map
Share
Follow
Andlers Ash Road

Network Rail are proposing to carry out Works for Rail Purposes on Andlers Ash Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Sep 2024 at 11:09.

Network Rail logo
Between
19 and 21 Apr 2025
Details
View Map
Share
Follow
School Lane

Network Rail are proposing to carry out Works for Rail Purposes on School Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Sep 2024 at 11:22.

Network Rail logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Long Road

Network Rail are proposing to carry out Works for Rail Purposes on Long Road, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Jan 2025 at 14:21.

Network Rail logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Kingsfernsden Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kingsfernsden Lane, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Jan 2025 at 14:21.

South East Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Dragon Street

South East Water are proposing to carry out Utility repair and maintenance works on Dragon Street, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 18 Dec 2024 at 13:25.

South East Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Dragon Street

South East Water are proposing to carry out Utility repair and maintenance works on Dragon Street, Petersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 18 Dec 2024 at 17:24.


Roadworks Map near to Rogate, PETERSFIELD, GU31 5EQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 3 Feb 2025 04:49
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Rogate, PETERSFIELD, GU31 5EQ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)