ROADWORKS SUMMARY
Wykwood, LIPHOOK, GU30 7AJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wykwood, GU30 7AJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wykwood, LIPHOOK, GU30 7AJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wykwood are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Haslemere Footpath 12/10

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haslemere Footpath 12/10, Haslemere.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:17.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hindhead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hindhead Road, Hindhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 10:20.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Haslemere Footpath 12/10

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Haslemere Footpath 12/10, Haslemere.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 14:02.

Southern Gas Networks logo
LONG TERM
Between
5 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Forest Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Forest Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Jul 2024 at 10:55.

Southern Gas Networks logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Forest Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Forest Road, Liss.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 10:00 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 10:20.

Vattenfall Networks logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Warren Road

Vattenfall Networks are carrying out New service connection on Warren Road, Liss.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:30 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vattenfall Networks on 3 Dec 2024 at 14:01.

Hampshire County Council logo
LONG TERM
Between
12 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Bolley Avenue

Hampshire County Council are proposing to carry out Section 50 on Bolley Avenue, Whitehill, Bordon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Oct 2024 at 16:02.

Hampshire County Council logo
LONG TERM
Between
12 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Bolley Avenue

Hampshire County Council are proposing to carry out Section 50 on Bolley Avenue, Whitehill, Bordon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 22 Oct 2024 at 14:19.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Dolphin Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Dolphin Close, Haslemere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Highercombe Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Highercombe Road, Haslemere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:30 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 08:42.

Southern Gas Networks logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Bell Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bell Road, Kingsley Green, Fernhurst.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 14:42.

West Sussex County Council logo
Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Bell Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Bell Road, Fernhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Oct 2024 at 13:48.

Hampshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Portsmouth Road

Hampshire County Council are carrying out Highway repair and maintenance works on Portsmouth Road, Liphook.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 16:00 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 2 Dec 2024 at 15:00.

West Sussex County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Portsmouth Road

West Sussex County Council are carrying out Highway repair and maintenance works on Portsmouth Road, Milland.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 11:00 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 2 Dec 2024 at 09:21.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wey Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wey Hill, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 11:02.

South East Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Rectory Lane

South East Water are proposing to carry out New service connection on Rectory Lane, Bramshott, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 28 Oct 2024 at 10:29.

South East Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Rectory Lane

South East Water are proposing to carry out New service connection on Rectory Lane, Bramshott, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 23 Oct 2024 at 15:52.

Hampshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 16 Oct 2024 at 15:15.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Passfield Road

BT are proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:41.

South East Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Marley Lane

South East Water are proposing to carry out Utility repair and maintenance works on Marley Lane, Fernhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 29 Nov 2024 at 09:18.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Passfield Road

BT were proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Sep 2024 at 11:18.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Passfield Road

BT are proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Sep 2024 at 11:48.

West Sussex County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Tennysons Lane

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Tennysons Lane, Lurgashall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 12:40.

Hampshire County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Headley Road, Lindford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Sep 2024 at 15:33.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Devils Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Devils Lane, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2024 at 16:11.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Devils Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Devils Lane, Liphook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Aug 2024 at 14:14.

Surrey County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Haste Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Haste Hill, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 07:40.

Surrey County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Scotland Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Scotland Lane, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 07:40.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Bell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bell Road, Fernhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 12:51.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 11 Mar 2025
Details
View Map
Share
Follow
Bell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bell Road, Fernhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2024 at 09:28.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Dolphin Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dolphin Close, Haslemere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:10.

Gigaclear logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Churt Road

Gigaclear were proposing to carry out Utility asset works on Churt Road, Churt, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 15 Oct 2024 at 13:53.

Thames Water logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 09:14.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hale House Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Oct 2024 at 09:50.

Thames Water logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Highercombe Road

Thames Water were proposing to carry out New service connection on Highercombe Road, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 14:39.

BT logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Hollycombe Lane

BT were proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:53.

Network Rail logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Mill Road

Network Rail are proposing to carry out Works for Rail Purposes on Mill Road, Liss.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Aug 2024 at 15:59.

Hampshire County Council logo
Between
29 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 11:46.

Hampshire County Council logo
Between
29 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:21.

Hampshire County Council logo
Between
29 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Nov 2024 at 10:46.

Hampshire County Council logo
Between
29 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 11:09.

Thames Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Longdene Road

Thames Water are proposing to carry out Utility repair and maintenance works on Longdene Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 13:14.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Hollycombe Lane

BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:02.

Hampshire County Council logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 15:21.

Hampshire County Council logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:25.

Hampshire County Council logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Headley Road

Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 13:50.

Hampshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 11:48.

Hampshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:27.

Hampshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Standford Lane

Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 13:49.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hale House Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:36.

Southern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Liphook Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Liphook Road, Haslemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:58.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Shottermill Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shottermill Road, Hammer, Linchmere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Nov 2024 at 10:44.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Tunbridge Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tunbridge Lane, Bramshott, Liphook.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:28.

South East Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Marley Lane

South East Water are proposing to carry out Utility repair and maintenance works on Marley Lane, Fernhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 28 Nov 2024 at 09:35.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Hollycombe Lane

BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:00.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Cinder Lane

BT are proposing to carry out Utility asset works on Cinder Lane, Milland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 10:01.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Wey Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wey Hill, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 11:33.

Southern Gas Networks logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Liphook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Liphook Road, Haslemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 11:00.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Bell Road Access Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bell Road Access Road, Fernhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 14:46.

Hampshire County Council logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Pond Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Pond Road, Headley, Bordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 28 Nov 2024 at 15:42.


Roadworks Map near to Wykwood, LIPHOOK, GU30 7AJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wykwood, LIPHOOK, GU30 7AJ (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Giganet logo
ERLES ROAD 
(0.1 miles)
Giganet
Remedial works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 26 Nov 2024 15:20
(Scheduled: 26 Nov 2024 - 9 Dec 2024)
0.1
Details
Share
Follow
2
South East Water logo
CHAPPELL CLOSE 
(0.2 miles)
South East Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
2 Dec 2024 11:00 - 3 Dec 2024 11:12
0.2
Details
Share
3
Scottish Hydro Electric Power Dis logo
URGENT
  
MIDHURST ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
In Progress
Since: 1 Dec 2024 10:39
(Scheduled: 1 Dec 2024 - 6 Dec 2024)
0.4
Details
Share
Follow
4
West Sussex County Council logo
EMERGENCY
  
PORTSMOUTH ROAD 
(0.6 miles)
West Sussex County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 28 Nov 2024 11:00
(Scheduled: 28 Nov 2024 - 9 Dec 2024)
0.6
Details
Share
Follow
5
Scottish Hydro Electric Power Dis logo
GUNNS FARM 
(0.7 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 3 Dec 2024 - 16 Dec 2024
0.7
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
CHURCH ROAD, BRAMSHOTT 
(0.7 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Cancelled
(Scheduled: 5 Dec 2024 - 19 Dec 2024)
0.7
Details
Share
7
Southern Gas Networks logo
MAJOR
  
RECTORY LANE, BRAMSHOTT 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Cancelled
(Scheduled: 5 Dec 2024 - 19 Dec 2024)
0.8
Details
Share
8
Southern Gas Networks logo
MAJOR
  
CHURCH LANE, BRAMSHOTT 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 26 Nov 2024 11:00
(Scheduled: 25 Nov 2024 - 17 Dec 2024)
0.8
Details
Share
Follow
9
Hampshire County Council logo
EMERGENCY
  
PORTSMOUTH ROAD 
(0.9 miles)
Hampshire County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 27 Nov 2024 16:00
(Scheduled: 27 Nov 2024 - 9 Dec 2024)
0.9
Details
Share
Follow
10
Hampshire County Council logo
MAJOR
  
HEADLEY ROAD 
(0.9 miles)
Hampshire County Council
Highway improvement works - Footway - Give and take
Planned
Scheduled: 25 Nov 2024 - 6 Dec 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.