ROADWORKS SUMMARY
New Road, MIDHURST, GU29 9HY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for New Road, GU29 9HY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to New Road, MIDHURST, GU29 9HY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for New Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 25 May 2025
Details
View Map
Share
Easebourne Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Easebourne Street, Easebourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 25 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:44.

West Sussex County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
A286 The Grove To Cobblers Row

West Sussex County Council are carrying out Highway improvement works on A286 The Grove To Cobblers Row, Singleton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 8 Jan 2025 at 10:59.

West Sussex County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Charlton Road

West Sussex County Council are carrying out Highway improvement works on Charlton Road, Singleton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 8 Jan 2025 at 11:28.

West Sussex County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
A286 Cobblers Row To Middlefield

West Sussex County Council are carrying out Highway improvement works on A286 Cobblers Row To Middlefield, Singleton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 8 Jan 2025 at 11:27.

West Sussex County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
A286 Town Lane To The Grove

West Sussex County Council are carrying out Highway improvement works on A286 Town Lane To The Grove, Singleton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 8 Jan 2025 at 10:57.

West Sussex County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
A286 Cobblers Row To Middlefield

West Sussex County Council are carrying out Highway improvement works on A286 Cobblers Row To Middlefield, Singleton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 8 Jan 2025 at 11:25.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Egmont Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Egmont Road, Easebourne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:53.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chichester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chichester Road, West Lavington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 09:39.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
New Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on New Road, Midhurst.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:49.

Southern Water logo
Between
4 Feb and 6 Mar 2025
Details
View Map
Share
June Lane

Southern Water were proposing to carry out Utility repair and maintenance works on June Lane, Midhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 16:26.

Southern Gas Networks logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Selham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Selham Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 2 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:46.

Southern Water logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Graffham Common Road

Southern Water were proposing to carry out Utility repair and maintenance works on Graffham Common Road, Graffham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Southern Water on 12 Nov 2024 at 16:10.

West Sussex County Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
North Street

West Sussex County Council are carrying out Highway improvement works on North Street, Midhurst.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 11:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Feb 2025 at 13:20.

West Sussex County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
New Road

West Sussex County Council were proposing to carry out Highway repair and maintenance works on New Road, South Ambersham, Graffham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 11:17.

West Sussex County Council logo
Between
3 and 10 Mar 2025
Details
View Map
Share
Follow
New Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on New Road, South Ambersham, Graffham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 10:57.

West Sussex County Council logo
Between
13 and 17 Mar 2025
Details
View Map
Share
Follow
Topleigh Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Topleigh Road, Graffham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:03.

West Sussex County Council logo
Between
13 and 17 Mar 2025
Details
View Map
Share
Follow
Leggs Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Leggs Lane, Heyshott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:06.

Southern Gas Networks logo
Between
24 Mar and 13 Apr 2025
Details
View Map
Share
Selham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Selham Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 13 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:51.

Portsmouth Waterworks Company logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
The Grove

Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on The Grove, Singleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Portsmouth Waterworks Company on 29 Jan 2025 at 09:41.

West Sussex County Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Brambling Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Brambling Lane, Woolbeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 13:37.

West Sussex County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Hollist Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hollist Lane, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Feb 2025 at 09:22.

National Grid Electricity Transmission logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Chithurst Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Chithurst Lane, Chithurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 15 Jan 2025 at 07:58.

National Grid Electricity Transmission logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Woolbeding Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Woolbeding Lane, Woolbeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 17 Jan 2025 at 12:11.

National Grid Electricity Transmission logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Woolbeding Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Woolbeding Lane, Woolbeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 23 Jan 2025 at 10:40.

National Grid Electricity Transmission logo
Between
1 and 8 Apr 2025
Details
View Map
Share
Follow
Chithurst Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Chithurst Lane, Chithurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 22 Jan 2025 at 13:48.

National Grid Electricity Transmission logo
Between
1 and 8 Apr 2025
Details
View Map
Share
Follow
Chithurst Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Chithurst Lane, Chithurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 24 Jan 2025 at 11:27.

Southern Gas Networks logo
Between
7 and 27 Apr 2025
Details
View Map
Share
Church Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 27 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:25.

West Sussex County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Hollist Lane

West Sussex County Council are proposing to carry out Permanent reinstatement on Hollist Lane, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Feb 2025 at 15:47.

Southern Gas Networks logo
Between
7 and 27 Apr 2025
Details
View Map
Share
Church Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 27 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:13.

West Sussex County Council logo
Between
8 and 12 Apr 2025
Details
View Map
Share
A286 Cobblers Row To Middlefield

West Sussex County Council were proposing to carry out Highway repair and maintenance works on A286 Cobblers Row To Middlefield, Singleton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Feb 2025 at 16:12.

West Sussex County Council logo
Between
9 and 18 Apr 2025
Details
View Map
Share
Wardley Lane

West Sussex County Council were proposing to carry out Highway improvement works on Wardley Lane, Milland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Feb 2025 at 10:57.

West Sussex County Council logo
Between
9 and 15 Apr 2025
Details
View Map
Share
A286 Cobblers Row To Middlefield

West Sussex County Council were proposing to carry out Highway repair and maintenance works on A286 Cobblers Row To Middlefield, Singleton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Feb 2025 at 15:56.

West Sussex County Council logo
Between
9 and 12 Apr 2025
Details
View Map
Share
Cocking Hill

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Cocking Hill, Cocking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Feb 2025 at 16:15.

West Sussex County Council logo
Between
9 and 15 Apr 2025
Details
View Map
Share
Cocking Hill

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Cocking Hill, Cocking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Feb 2025 at 16:03.

West Sussex County Council logo
Between
9 and 12 Apr 2025
Details
View Map
Share
A286 Church Lane To Bell Lane

West Sussex County Council were proposing to carry out Highway repair and maintenance works on A286 Church Lane To Bell Lane, Cocking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Feb 2025 at 16:21.

West Sussex County Council logo
Between
9 and 15 Apr 2025
Details
View Map
Share
A286 Church Lane To Bell Lane

West Sussex County Council were proposing to carry out Highway repair and maintenance works on A286 Church Lane To Bell Lane, Cocking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Feb 2025 at 16:08.

Southern Gas Networks logo
Between
10 Apr and 9 May 2025
Details
View Map
Share
Hollist Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 April 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 15:06.

West Sussex County Council logo
Between
11 and 15 Apr 2025
Details
View Map
Share
Follow
Ambersham Hollow Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Ambersham Hollow Road, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Feb 2025 at 11:43.

West Sussex County Council logo
Between
11 and 15 Apr 2025
Details
View Map
Share
Follow
Ambersham Hollow Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Ambersham Hollow Road, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 14:52.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 16 May 2025
Details
View Map
Share
Follow
Hollist Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 11:27.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 16 May 2025
Details
View Map
Share
Follow
Hollist Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollist Lane, Easebourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Jan 2025 at 13:56.

West Sussex County Council logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
Cocking Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cocking Hill, Cocking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Feb 2025 at 14:35.

West Sussex County Council logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
A286 Church Lane To Bell Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on A286 Church Lane To Bell Lane, Cocking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Feb 2025 at 14:35.

West Sussex County Council logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
A286 Cobblers Row To Middlefield

West Sussex County Council are proposing to carry out Highway repair and maintenance works on A286 Cobblers Row To Middlefield, Singleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Feb 2025 at 14:34.

Southern Gas Networks logo
Between
5 and 25 May 2025
Details
View Map
Share
Follow
Vanzell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanzell Road, Easebourne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 09:40.

Southern Gas Networks logo
Between
5 May and 1 Jun 2025
Details
View Map
Share
Church Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Road, West Lavington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 1 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:31.

West Sussex County Council logo
Between
6 and 10 May 2025
Details
View Map
Share
Follow
Cocking Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cocking Hill, Cocking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Feb 2025 at 13:37.

West Sussex County Council logo
Between
6 and 10 May 2025
Details
View Map
Share
Follow
A286 Church Lane To Bell Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on A286 Church Lane To Bell Lane, Cocking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Feb 2025 at 13:43.

West Sussex County Council logo
Between
6 and 10 May 2025
Details
View Map
Share
Follow
A286 Cobblers Row To Middlefield

West Sussex County Council are proposing to carry out Highway repair and maintenance works on A286 Cobblers Row To Middlefield, Singleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Feb 2025 at 13:33.


Roadworks Map near to New Road, MIDHURST, GU29 9HY (8 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Marker
Marker
Marker
Marker
Last Updated: 15 Feb 2025 05:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to New Road, MIDHURST, GU29 9HY (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
NEW ROAD 
(0.0 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Cancelled
(Scheduled: 27 Jan 2025 - 16 Feb 2025)
0.0
Details
Share
2
West Sussex County Council logo
MAJOR
  
BOURNE WAY 
(0.1 miles)
West Sussex County Council
Works for road purposes - Footway, Carriageway, Verge - No carriageway incursion
Planned
Scheduled: 17 Dec 2024 - 14 Jun 2025
0.1
Details
Share
Follow
3
Southern Gas Networks logo
EMERGENCY
  
BEPTON ROAD 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Multi-way signals
Complete
6 Feb 2025 14:11 - 13 Feb 2025 15:30
0.2
Details
Share
4
Southern Gas Networks logo
MAJOR
  
CHICHESTER ROAD 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 20 Jan 2025 - 16 Feb 2025
0.3
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
SELHAM ROAD 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Two-way signals
Cancelled
(Scheduled: 10 Feb 2025 - 2 Mar 2025)
0.3
Details
Share
6
West Sussex County Council logo
MAJOR
  
GOODWOOD CLOSE 
(0.4 miles)
West Sussex County Council
Works for road purposes - Footway, Carriageway, Verge - No carriageway incursion
Planned
Scheduled: 11 Oct 2024 - 8 Apr 2025
0.4
Details
Share
Follow
7
Southern Water logo
MAJOR
  
JUNE LANE 
(0.6 miles)
Southern Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 4 Feb 2025 - 6 Mar 2025)
0.6
Details
Share
8
West Sussex County Council logo
EMERGENCY
  
NORTH STREET 
(0.8 miles)
West Sussex County Council
Highway improvement works - Carriageway - Multi-way signals
In Progress
Since: 14 Feb 2025 11:00
(Scheduled: 14 Feb 2025 - 28 Mar 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.