ROADWORKS SUMMARY
Mill Lane, WOKING, GU23 6QT
Introduction
View current and future planned roadworks and road closures for Mill Lane, GU23 6QT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Mill Lane, WOKING, GU23 6QT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mill Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:32.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Constitution Hill, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:59.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Mount Hermon Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:04.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Hill View Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:05.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on York Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:50.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Station Approach, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:44.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Bradfield Close, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 9 Feb 2021 at 12:42.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Heathside Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:03.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Heathside Crescent, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 9 Apr 2021 at 09:58.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:47.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Goldsworth Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:01.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Church Street West, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:57.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Forge End, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:00.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Victoria Way, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:49.
1 Nov 2022 and 31 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Victoria Way, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2022 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 9 Jun 2021 at 06:50.
Saturday
Surrey County Council are proposing to carry out Section 50 on Oriental Road, Woking.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2023 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 27 Apr 2021 at 10:14.
20 Dec 2024
National Highways are carrying out Highway improvement works on Ockham Road North, Ockham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2023 at 20:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 12:57.
20 Dec 2024
National Highways are carrying out Highway improvement works on Portsmouth Road, Ockham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2023 at 20:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 12:56.
31 Dec 2026
National Highways are carrying out Highway improvement works on Elm Lane, Ockham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2023 at 08:00 and could run through until 31 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 30 Sep 2024 at 11:22.
1 Apr 2024 and 1 Apr 2026
Surrey County Council are proposing to carry out Highway improvement works on Elmgrove Road, Weybridge.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 1 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 12:26.
Saturday
National Highways are carrying out Highway improvement works on Byfleet Road, Cobham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 23:01 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 May 2024 at 06:33.
20 May 2024 and 20 May 2026
Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.
20 May 2024 and 20 May 2026
Surrey County Council are proposing to carry out Highway improvement works on Monument Hill, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:45.
20 May 2024 and 20 May 2026
Surrey County Council are proposing to carry out Highway improvement works on Monument Green, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.
3 Jun 2024 and 1 Sep 2026
Surrey County Council were proposing to carry out Highway improvement works on Old Wharf Way, Weybridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 June 2024 and run through until 1 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 16:43.
3 Jun 2024 and 1 Sep 2026
Surrey County Council were proposing to carry out Highway improvement works on Bridge Road, Weybridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 June 2024 and run through until 1 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 16:44.
4 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Fairmile Park Road, Cobham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 14:00 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:20.
1 Sep 2024 and 1 Mar 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Clandon Road, West Clandon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:44.
1 Sep 2024 and 1 Mar 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Clandon Road, Send.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:44.
2 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 11:49.
2 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 16 Feb 2024 at 09:46.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity Network Company on 14 Aug 2024 at 15:14.
1 Oct 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on St Georges Avenue, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 08:21.
5 Oct 2024 and 26 Apr 2025
Surrey County Council are proposing to carry out Works for road purposes on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2024 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 13:59.
26 Apr 2025
Surrey County Council are carrying out Works for road purposes on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2024 at 07:30 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 09:54.
5 Oct 2024 and 24 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2024 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 24 Sep 2024 at 09:43.
24 Apr 2025
Surrey County Council are carrying out Highway improvement works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 October 2024 at 07:30 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 09:05.
7 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Maple Road, Send.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 08:00 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:25.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Woking Road, Woking.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 13:13.
7 Oct 2024 and 18 Apr 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 14:15.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity Network Company on 31 Jul 2024 at 08:41.
14 Oct 2024 and 27 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:43.
21 Oct and 8 Dec 2024
Electricity Network Company were proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 8 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 4 Oct 2024 at 15:04.
21 Oct and 7 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity Network Company on 17 Oct 2024 at 09:13.
26 Oct and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Westfield Avenue, Westfield, Woking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 08:56.
Friday
Surrey County Council are carrying out Highway repair and maintenance works on London Road, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 12:38.
Friday
Surrey County Council are carrying out Highway repair and maintenance works on Winterhill Way, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 14:18.
Today
Surrey County Council were proposing to carry out Highway repair and maintenance works on London Road, Guildford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 24 November 2024. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 22 Oct 2024 at 09:42.
30 Oct 2024 and 28 Mar 2025
Electricity Network Company were proposing to carry out Utility asset works on Newark Lane, Ripley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 October 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 18 Nov 2024 at 09:28.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Heath Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Jul 2024 at 13:59.
4 Nov and 13 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Nov 2024 at 14:48.
13 Dec 2024
Affinity Water are carrying out Utility asset works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 14:40 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 16:34.
4 Nov 2024 and 18 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Send Marsh Road, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 10:43.
Saturday
Surrey County Council were proposing to carry out Highway repair and maintenance works on Bridge Road, Weybridge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 30 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 9 Oct 2024 at 09:45.
4 Nov and 30 Dec 2024
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Wharf Way, Weybridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 30 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 16:01.
Saturday
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Wharf Way, Weybridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 30 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 9 Oct 2024 at 09:39.
Saturday
Surrey County Council were proposing to carry out Highway repair and maintenance works on Addlestone Road, Addlestone.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 30 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 9 Oct 2024 at 09:44.
19 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Woodham Lane, Addlestone.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 10:00 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 10:21.
8 Nov and 9 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Guildford Road, Chertsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Sep 2024 at 09:32.
8 Nov and 9 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Guildford Road, Chertsey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 11 Sep 2024 at 07:05.
8 Nov and 9 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Little Green Lane, Chertsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Aug 2024 at 10:21.
8 Nov and 9 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Little Green Lane, Chertsey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Sep 2024 at 07:04.
11 Nov 2024 and 31 Dec 2026
National Highways are proposing to carry out Works for road purposes on Wisley Lane, Wisley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 31 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Oct 2024 at 10:55.
31 Dec 2026
National Highways are carrying out Works for road purposes on Wisley Lane, Wisley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 00:01 and could run through until 31 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Nov 2024 at 08:51.
25 Jul 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Maybury Hill, Woking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 07:55 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:37.
11 Nov and 10 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Sandpit Hall Road, Chobham, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:02.
11 Nov and 7 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Bridge Road, Weybridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:58.
7 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Bridge Road, Weybridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 10:03.
11 Nov and 7 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Wharf Way, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:56.
7 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Old Wharf Way, Weybridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 10:05.
11 Nov and 7 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Addlestone Road, Addlestone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:32.
7 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Addlestone Road, Addlestone.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 10:04.
14 Nov and 7 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 10:17.
14 Nov and 21 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 31 Oct 2024 at 09:32.
21 Dec 2024
Electricity Network Company are carrying out Utility asset works on Church Hill, Pyrford, Woking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 10:30 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 14 Nov 2024 at 10:40.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Guildford Road, Woking.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 November 2024 at 13:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:59.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 12:32.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Portsmouth Road, Send.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 09:52.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:10.
12 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Sandpit Hall Road, Chobham, Woking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 08:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 08:06.
19 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Slyfield Green, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 09:37.
19 Nov 2024 and 19 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Maybury Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 15:48.
19 Nov and 21 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Barnes Wallis Drive, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 24 Sep 2024 at 16:02.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Forest Road, East Horsley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 14:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 14:40.
Thursday
BT are proposing to carry out Utility asset works on Cobham Road, Bookham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 Nov 2024 at 09:17.
25 Nov 2024 and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shaftesbury Road, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 11:40.
25 Nov and 19 Dec 2024
UK Power Networks South Eastern are proposing to carry out Utility asset works on Grange Road, New Haw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 15:38.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockham Road North, East Horsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 14:39.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockham Road North, East Horsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 09:41.
27 Nov and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out Utility asset works on Grange Road, New Haw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 08:35.
28 Nov and 12 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 08:59.
28 Nov and 12 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 09:11.
28 Nov and 12 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 12:46.
28 Nov and 12 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 09:14.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Station Road, Addlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Nov 2024 at 16:47.
2 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Send Marsh Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 15 Nov 2024 at 09:55.
2 and 7 Dec 2024
National Highways are proposing to carry out Works for road purposes on Ockham Road North, Ockham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 15:02.
2 and 7 Dec 2024
National Highways are proposing to carry out Works for road purposes on Ockham Road North, Ockham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 12:59.
2 and 7 Dec 2024
National Highways are proposing to carry out Works for road purposes on Portsmouth Road, Ockham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 12:58.
2 and 7 Dec 2024
National Highways are proposing to carry out Works for road purposes on Portsmouth Road, Ockham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 14:07.
2 and 5 Dec 2024
BT were proposing to carry out Utility asset works on Cobham Road, Bookham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 7 Nov 2024 at 08:26.
2 Dec 2024 and 1 May 2025
Electricity Network Company were proposing to carry out Utility asset works on Newark Lane, Ripley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 1 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 22 Nov 2024 at 15:07.
2 and 4 Dec 2024
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Camphill Road, West Byfleet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Oct 2024 at 07:55.
3 and 5 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Seven Hills Road, Cobham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 8 Jul 2024 at 14:31.
9 and 19 Dec 2024
National Highways are proposing to carry out Works for Rail Purposes on Portsmouth Road, Cobham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Oct 2024 at 12:48.
9 and 19 Dec 2024
National Highways are proposing to carry out Works for Rail Purposes on Portsmouth Road, Cobham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Oct 2024 at 14:14.
9 and 19 Dec 2024
National Highways are proposing to carry out Works for road purposes on Byfleet Road, Cobham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Oct 2024 at 12:48.
9 and 19 Dec 2024
National Highways are proposing to carry out Works for road purposes on Byfleet Road, Cobham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Oct 2024 at 14:14.
16 and 19 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 11:11.
16 and 18 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Nov 2024 at 09:20.
20 and 22 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Camphill Road, West Byfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 December 2024 and could run through until 22 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 15 Nov 2024 at 10:39.
2 Jan and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Bookham Street, Bookham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 10:30.
2 Jan and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Bookham Street, Bookham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 08:23.
2 Jan and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sole Farm Road, Bookham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 10:37.
2 Jan and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sole Farm Road, Bookham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:25.
2 Jan and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sole Farm Road, Bookham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 08:25.
2 and 5 Jan 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Camphill Road, West Byfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 24 Oct 2024 at 13:52.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Church Lane, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:48.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Devonshire Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:42.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Balfour Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:06.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Weybridge Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:48.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Churchfield Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:15.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Baker Street, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:06.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Church Street, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 13:25.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Minorca Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:43.
2 Jan and 19 Dec 2025
Surrey County Council are proposing to carry out Highway improvement works on Portmore Park Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:46.
6 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Street, West Clandon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 08:24.
6 and 24 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Send Marsh Road, Ripley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 07:35.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Balfour Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:01.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Balfour Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 12:00.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:02.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:37.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Devonshire Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:55.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Devonshire Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:32.
6 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Round Oak Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:37.
6 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Round Oak Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:36.
7 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Guildford Road, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 17:30.
13 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pembroke Road, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 09:31.
13 Jan and 13 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Barnes Wallis Drive, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 23 Oct 2024 at 15:24.
14 and 16 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Maybury, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 10:44.
15 and 17 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Brooklands Lane, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 09:38.
20 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 13:39.
20 and 23 Jan 2025
BT were proposing to carry out Utility asset works on Cobham Road, Bookham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Nov 2024 at 09:41.
20 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Hill, Addlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Aug 2024 at 07:04.
20 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Hill, Addlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 13:54.
20 and 24 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Pine Grove, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 10:57.
20 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wey Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:38.
20 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wey Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:30.
21 and 23 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Wisley Lane, Wisley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 10:09.
27 Jan and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smarts Heath Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 15:04.
27 Jan and 26 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 26 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 22 Nov 2024 at 15:11.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 10 Jul 2024 at 10:41.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Addlestone Road, Addlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 16 Jul 2024 at 13:52.
3 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woburn Hill, Addlestone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Sep 2024 at 17:10.
3 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woburn Hill, Addlestone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Oct 2024 at 09:13.
3 and 15 Feb 2025
Esso Petroleum Co are proposing to carry out Utility asset works on Canford Drive, Addlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Esso Petroleum Co on 20 Nov 2024 at 13:53.
3 and 15 Feb 2025
Esso Petroleum Co are proposing to carry out Utility asset works on Canford Drive, Addlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Esso Petroleum Co on 22 Nov 2024 at 14:59.
10 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheerwater Road, West Byfleet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Jun 2024 at 10:36.
10 Feb and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Madeira Road, West Byfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Jun 2024 at 07:37.
10 Feb and 23 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portmore Park Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:35.
10 Feb and 23 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portmore Park Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 08:57.
17 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 12:19.
17 Feb and 21 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 15:00.
17 Feb and 16 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 21 Aug 2024 at 15:04.
17 and 19 Feb 2025
BT are proposing to carry out Utility asset works on Common Close, Horsell, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 12 Nov 2024 at 16:31.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Camphill Road, West Byfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 10:36.
19 and 23 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:05.
Roadworks Map near to Mill Lane, WOKING, GU23 6QT
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Mill Lane, WOKING, GU23 6QT (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 17 Sep 2023 - 20 Dec 2024)
(Scheduled: 17 Sep 2023 - 20 Dec 2024)
(Scheduled: 11 Nov 2024 - 31 Dec 2026)
(Scheduled: 20 Nov 2024 - 25 Nov 2024)