ROADWORKS SUMMARY
Beech Drive, WOKING, GU23 6LG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Beech Drive, GU23 6LG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Beech Drive, WOKING, GU23 6LG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Beech Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Ockham Road North

National Highways are carrying out Highway improvement works on Ockham Road North, Ockham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2023 at 20:00 and could run through until 30 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 10 Sep 2025 at 01:10.

National Highways logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Portsmouth Road

National Highways are carrying out Highway improvement works on Portsmouth Road, Ockham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2023 at 20:00 and could run through until 30 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 19 Jun 2025 at 14:58.

National Highways logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Elm Lane

National Highways are carrying out Highway improvement works on Elm Lane, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2023 at 08:00 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Sep 2024 at 11:22.

National Highways logo
LONG TERM
Between
11 Nov 2024 and 31 Dec 2026
Details
View Map
Share
Follow
Wisley Lane

National Highways are proposing to carry out Works for road purposes on Wisley Lane, Wisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 4 Oct 2024 at 10:55.

National Highways logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Wisley Lane

National Highways are carrying out Works for road purposes on Wisley Lane, Wisley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 08:51.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 12:00.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Woodbridge Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodbridge Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 11:13.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Clover Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clover Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 07:57.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
London Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on London Road, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 May 2025 at 13:12.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Woking Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 10:47.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Park Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Lane, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 15:39.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Keens Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Keens Lane, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 14:02.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Worplesdon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Worplesdon Road, Worplesdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 09:46.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Station Parade

Surrey County Council are proposing to carry out Highway repair and maintenance works on Station Parade, East Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 31 Jan 2025 at 16:09.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Howard Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Howard Road, Effingham Junction, East Horsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 15:14.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Saunders Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Saunders Lane, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Mar 2025 at 08:11.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Westfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Westfield Road, Westfield, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Sep 2024 at 08:25.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Vicarage Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Kingfield, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Sep 2024 at 08:27.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Gorsewood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gorsewood Road, St Johns, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Jan 2025 at 14:33.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Old Woking Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Woking Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 15:55.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Walton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Sep 2024 at 08:19.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Station Approach

Surrey County Council were proposing to carry out Highway repair and maintenance works on Station Approach, West Byfleet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 14:11.

Surrey County Council logo
LONG TERM
Between
21 Apr and 21 Oct 2025
Details
View Map
Share
Follow
Seven Hills Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Seven Hills Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Jan 2025 at 14:35.

Surrey County Council logo
LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Portsmouth Road

Surrey County Council are carrying out Works for road purposes on Portsmouth Road, Send.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 April 2025 at 07:30 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 14:24.

Surrey County Council logo
LONG TERM
Between
1 May and 1 Nov 2025
Details
View Map
Share
Follow
Howard Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Howard Road, Effingham Junction, East Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Feb 2025 at 09:02.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Maybury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Maybury Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Mar 2025 at 09:21.

Surrey County Council logo
LONG TERM
Between
1 Jul 2025 and 1 Jan 2026
Details
View Map
Share
Follow
Portsmouth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Portsmouth Road, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 1 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 15:05.

Surrey County Council logo
LONG TERM
Between
1 Jul 2025 and 1 Jan 2026
Details
View Map
Share
Follow
Saunders Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Saunders Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 1 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Mar 2025 at 14:16.

Surrey County Council logo
LONG TERM
Between
1 Jul 2025 and 1 Jan 2026
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 1 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 15:11.

Surrey County Council logo
LONG TERM
Between
1 Jul 2025 and 1 Jan 2026
Details
View Map
Share
Seven Hills Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Seven Hills Road, Cobham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 1 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Jan 2025 at 13:24.

Electricity Network Company logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Old Lane

Electricity Network Company were proposing to carry out Utility asset works on Old Lane, Cobham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 25 Jul 2025 at 09:21.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 13 Oct 2025
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Jun 2024 at 09:16.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 13 Oct 2025
Details
View Map
Share
Portsmouth Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Portsmouth Road, Guildford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 15:48.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 17 Nov 2025
Details
View Map
Share
High Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on High Street, Old Woking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 17 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 15:34.

Surrey County Council logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Merrow Common Road

Surrey County Council are carrying out Highway repair and maintenance works on Merrow Common Road, Guildford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 14:53 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Sep 2025 at 14:47.

Surrey County Council logo
LONG TERM
Between
14 Aug 2025 and 14 Feb 2026
Details
View Map
Share
Follow
Effingham Common Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Common Road, Effingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 14 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 May 2025 at 21:45.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Send Marsh Road

UK Power Networks South Eastern were proposing to carry out New service connection on Send Marsh Road, Ripley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 26 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Aug 2025 at 08:38.

Cadent Gas logo
LONG TERM
Between
18 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Woodham Lane

Cadent Gas are proposing to carry out Utility asset works on Woodham Lane, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 16:30.

Cadent Gas logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Woodham Lane

Cadent Gas are carrying out Utility asset works on Woodham Lane, Woking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 09:30 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 09:23.

Cadent Gas logo
LONG TERM
Between
18 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Woodham Lane

Cadent Gas are proposing to carry out Utility asset works on Woodham Lane, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 11:15.

Surrey County Council logo
LONG TERM
Between
1 Sep and 12 Dec 2025
Details
View Map
Share
Follow
North Street

Surrey County Council are proposing to carry out Works for road purposes on North Street, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 5 Aug 2025 at 08:09.

Affinity Water logo
LONG TERM
Between
1 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Burnt Common Lane

Affinity Water are proposing to carry out Utility asset works on Burnt Common Lane, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Apr 2025 at 15:21.

Affinity Water logo
LONG TERM
Between
1 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Burnt Common Lane

Affinity Water are proposing to carry out Utility asset works on Burnt Common Lane, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 12:35.

Southern Gas Networks logo
LONG TERM
Between
1 Sep 2025 and 13 Feb 2026
Details
View Map
Share
Follow
Send Marsh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Send Marsh Road, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 08:06.

Southern Gas Networks logo
LONG TERM
Between
1 Sep 2025 and 13 Feb 2026
Details
View Map
Share
Send Marsh Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Send Marsh Road, Ripley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 13 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 10:48.

Southern Gas Networks logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Send Marsh Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Send Marsh Road, Ripley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 15:48 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 15:48.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Winston Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Winston Way, Old Woking, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 11:45 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 14:53.

Surrey County Council logo
LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
White Rose Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on White Rose Lane, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 May 2025 at 15:34.

Surrey County Council logo
LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
White Rose Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on White Rose Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 May 2025 at 15:38.

Surrey County Council logo
LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Heathside Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Heathside Road, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Jun 2025 at 13:34.

Cadent Gas logo
LONG TERM
Between
1 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Woodham Lane

Cadent Gas are proposing to carry out Utility asset works on Woodham Lane, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:23.

Network Rail logo
Between
6 and 28 Sep 2025
Details
View Map
Share
Follow
Sample Oak Lane

Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Apr 2025 at 08:46.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Quarry Street

Surrey County Council are proposing to carry out Highway improvement works on Quarry Street, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 15 Jan 2025 at 10:54.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Quarry Street

Surrey County Council were proposing to carry out Highway improvement works on Quarry Street, Guildford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 15 May 2025 at 11:47.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Quarry Street

Surrey County Council are proposing to carry out Highway improvement works on Quarry Street, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 19 May 2025 at 19:57.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Millbrook

Surrey County Council are proposing to carry out Highway improvement works on Millbrook, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Aug 2025 at 09:49.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Millbrook

Surrey County Council were proposing to carry out Highway improvement works on Millbrook, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Mar 2025 at 11:55.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Millbrook

Surrey County Council are proposing to carry out Highway improvement works on Millbrook, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Apr 2025 at 10:22.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Millbrook

Surrey County Council were proposing to carry out Highway improvement works on Millbrook, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Jun 2025 at 08:04.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Millbrook

Surrey County Council are proposing to carry out Highway improvement works on Millbrook, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 10:21.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Millbrook

Surrey County Council were proposing to carry out Highway improvement works on Millbrook, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Aug 2025 at 09:44.

Surrey County Council logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Slyfield Green

Surrey County Council are proposing to carry out Works for road purposes on Slyfield Green, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Jun 2025 at 12:44.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Old Lane

National Highways are carrying out Works for road purposes on Old Lane, Mays Green, Cobham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 21:00 and could run through until 22 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 9 Sep 2025 at 14:31.

Between
8 Sep and 6 Oct 2025
Details
View Map
Share
Littlewick Roundabout

Aurora Utilities Limited were proposing to carry out New service connection on Littlewick Roundabout, Horsell, Woking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 1 Jul 2025 at 08:09.

Network Rail logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Sample Oak Lane

Network Rail are carrying out Works for Rail Purposes on Sample Oak Lane, Chilworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2025 at 23:55 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Sep 2025 at 07:59.

Surrey County Council logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
North Street

Surrey County Council are proposing to carry out Section 50 on North Street, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 09:31.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Clay Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Clay Lane, Jacobs Well.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 12:07 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 16:07.

Finishing
Friday
Details
View Map
Share
Follow
Clandon Road

Leep Utilities Electric are proposing to carry out New service connection on Clandon Road, Send.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leep Utilities Electric on 9 Jul 2025 at 11:24.

Surrey County Council logo
LONG TERM
Between
15 Sep and 31 Oct 2025
Details
View Map
Share
Follow
White Rose Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on White Rose Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Aug 2025 at 12:02.

Surrey County Council logo
LONG TERM
Between
15 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Heathside Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Heathside Road, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Aug 2025 at 11:55.

National Highways logo
LONG TERM
Between
15 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Portsmouth Road

National Highways are proposing to carry out Works for road purposes on Portsmouth Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 27 Aug 2025 at 09:34.

National Highways logo
LONG TERM
Until
15 Nov 2025
Details
View Map
Share
Follow
Portsmouth Road

National Highways are carrying out Works for road purposes on Portsmouth Road, Cobham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 21:00 and could run through until 15 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 17:25.

National Highways logo
LONG TERM
Between
15 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Byfleet Road

National Highways are proposing to carry out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 27 Aug 2025 at 09:35.

National Highways logo
LONG TERM
Until
15 Nov 2025
Details
View Map
Share
Follow
Byfleet Road

National Highways are carrying out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 21:00 and could run through until 15 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 17:26.

National Highways logo
LONG TERM
Between
15 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Byfleet Road

National Highways are proposing to carry out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Aug 2025 at 09:35.

Between
16 Sep and 6 Oct 2025
Details
View Map
Share
Carthouse Lane

Aurora Utilities Limited were proposing to carry out New service connection on Carthouse Lane, Horsell, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 1 Jul 2025 at 07:16.

Surrey County Council logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Roundhill Way

Surrey County Council are carrying out Highway repair and maintenance works on Roundhill Way, Guildford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 08:00 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Sep 2025 at 09:36.

National Highways logo
LONG TERM
Until
15 Nov 2025
Details
View Map
Share
Follow
Byfleet Road

National Highways are carrying out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 21:00 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Sep 2025 at 07:44.

Surrey County Council logo
LONG TERM
Between
20 Sep 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Woking Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 Jul 2025 at 10:39.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cross Lanes

Thames Water are proposing to carry out New service connection on Cross Lanes, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 09:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cross Lanes

Thames Water are proposing to carry out New service connection on Cross Lanes, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 10:15.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Walnut Tree Close

Network Rail are proposing to carry out Works for Rail Purposes on Walnut Tree Close, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jul 2025 at 12:51.

Cornerstone Telecommunications Infrastructure logo
Finishing
Thursday
Details
View Map
Share
Follow
Lockfield Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility repair and maintenance works on Lockfield Drive, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 19 Aug 2025 at 16:52.

Cornerstone Telecommunications Infrastructure logo
Finishing
Thursday
Details
View Map
Share
Follow
Lockfield Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility repair and maintenance works on Lockfield Drive, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 22 Aug 2025 at 11:37.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Oyster Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Oyster Lane, Byfleet, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Jul 2025 at 09:24.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Oyster Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Oyster Lane, Byfleet, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2025 at 10:50.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Oyster Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Oyster Lane, Byfleet, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 08:55.

Surrey County Council logo
LONG TERM
Between
24 Sep 2025 and 13 Feb 2026
Details
View Map
Share
Follow
Woking Road

Surrey County Council are proposing to carry out Works for road purposes on Woking Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 10 Sep 2025 at 08:54.

Surrey County Council logo
LONG TERM
Between
24 Sep 2025 and 13 Feb 2026
Details
View Map
Share
Follow
Woking Road

Surrey County Council are proposing to carry out Works for road purposes on Woking Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 13 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 10 Sep 2025 at 10:32.

Surrey County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Sherbourne

Surrey County Council are proposing to carry out Highway repair and maintenance works on Sherbourne, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 11:16.

Surrey County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Shere Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Shere Road, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Sep 2025 at 10:14.

UK Power Networks South Eastern logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Whitmoor Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Whitmoor Lane, Sutton Green, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 09:20.

Southern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Park Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Park Road, Woking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 15:53.

Surrey County Council logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Clay Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Clay Lane, Jacobs Well.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Sep 2025 at 08:43.

Surrey County Council logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Woking Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Sep 2025 at 12:24.

Between
1 and 27 Oct 2025
Details
View Map
Share
Follow
Camphill Road

Leep Utilities Electric are proposing to carry out New service connection on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 4 Aug 2025 at 08:41.

UK Power Networks South Eastern logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
One Tree Hill Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on One Tree Hill Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jul 2025 at 13:49.

UK Power Networks South Eastern logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Albury Road

UK Power Networks South Eastern are proposing to carry out New service connection on Albury Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Jul 2025 at 14:19.

Surrey County Council logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Uplands Road

Surrey County Council are proposing to carry out Highway improvement works on Uplands Road, Christchurch, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 20 Jan 2025 at 15:45.

Surrey County Council logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Epsom Road

Surrey County Council are proposing to carry out Highway improvement works on Epsom Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 20 Jan 2025 at 14:38.

Surrey County Council logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Boxgrove Road

Surrey County Council are proposing to carry out Highway improvement works on Boxgrove Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 20 Jan 2025 at 13:13.

Surrey County Council logo
Between
6 and 23 Oct 2025
Details
View Map
Share
Follow
Slyfield Green

Surrey County Council are proposing to carry out Works for road purposes on Slyfield Green, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 23 October 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Surrey County Council on 28 May 2025 at 11:28.

Southern Gas Networks logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Maybury Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 09:52.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Old Woking Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Woking Road, Woking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 14:18.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Old Woking Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Woking Road, Woking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Sep 2025 at 16:30.

Surrey County Council logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Walton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Sep 2025 at 11:03.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Woodham Park Road

UK Power Networks South Eastern are proposing to carry out New service connection on Woodham Park Road, Addlestone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Jun 2025 at 12:08.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Woodham Park Road

UK Power Networks South Eastern are proposing to carry out New service connection on Woodham Park Road, Addlestone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Jun 2025 at 14:01.

Electricity Network Company logo
Between
7 and 26 Oct 2025
Details
View Map
Share
Follow
Portsmouth Road

Electricity Network Company are proposing to carry out Utility asset works on Portsmouth Road, Ockham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 21 Aug 2024 at 14:11.

UK Power Networks South Eastern logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Commercial Road

UK Power Networks South Eastern are proposing to carry out New service connection on Commercial Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Jul 2025 at 14:20.

Surrey County Council logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Roundhill Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Roundhill Way, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2025 at 08:02.

Surrey County Council logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Roundhill Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Roundhill Way, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Jun 2025 at 12:23.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Maybury Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 14:49.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 5 Dec 2025
Details
View Map
Share
Old Woking Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Woking Road, Woking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 16:02.

Surrey County Council logo
LONG TERM
Between
14 Oct 2025 and 14 Mar 2026
Details
View Map
Share
Follow
Keens Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Keens Lane, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 09:29.

Surrey County Council logo
LONG TERM
Between
14 Oct 2025 and 14 Mar 2026
Details
View Map
Share
Follow
Station Approach

Surrey County Council are proposing to carry out Highway repair and maintenance works on Station Approach, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Aug 2025 at 15:35.

Surrey County Council logo
Between
17 and 24 Oct 2025
Details
View Map
Share
Follow
Keens Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Keens Lane, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Aug 2025 at 14:28.

Electricity Network Company logo
LONG TERM
Between
17 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

Electricity Network Company are proposing to carry out Utility asset works on Portsmouth Road, Ockham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 18 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 3 Feb 2025 at 09:52.

Electricity Network Company logo
LONG TERM
Between
17 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

Electricity Network Company are proposing to carry out Utility asset works on Portsmouth Road, Ockham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 18 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 11 Feb 2025 at 11:44.

Electricity Network Company logo
LONG TERM
Between
17 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

Electricity Network Company are proposing to carry out Utility asset works on Portsmouth Road, Ockham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 18 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 18 Feb 2025 at 11:53.

Electricity Network Company logo
LONG TERM
Between
17 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

Electricity Network Company are proposing to carry out Utility asset works on Portsmouth Road, Ockham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 18 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 13 Jan 2025 at 10:50.

Electricity Network Company logo
LONG TERM
Between
17 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

Electricity Network Company are proposing to carry out Utility asset works on Portsmouth Road, Ockham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 18 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 4 Sep 2025 at 17:58.

Electricity Network Company logo
LONG TERM
Between
17 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

Electricity Network Company are proposing to carry out Utility asset works on Portsmouth Road, Ockham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 18 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 11 Sep 2025 at 15:51.

UK Power Networks South Eastern logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Albury Road

UK Power Networks South Eastern are proposing to carry out New service connection on Albury Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Jul 2025 at 10:33.

UK Power Networks South Eastern logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Albury Road

UK Power Networks South Eastern are proposing to carry out New service connection on Albury Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 09:41.

Thames Water logo
Between
20 and 27 Oct 2025
Details
View Map
Share
Jenner Road

Thames Water were proposing to carry out Utility repair and maintenance works on Jenner Road, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 12:16.

Network Rail logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Walnut Tree Close

Network Rail are proposing to carry out Works for Rail Purposes on Walnut Tree Close, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Sep 2025 at 09:18.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Ripley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 15:50.

National Highways logo
Between
20 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Portsmouth Road

National Highways are proposing to carry out Works for road purposes on Portsmouth Road, Ockham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 13 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 16 Jul 2025 at 09:59.

Surrey County Council logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Potters Lane

Surrey County Council are proposing to carry out Section 50 on Potters Lane, Send.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Aug 2025 at 16:02.

Surrey County Council logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
North Street

Surrey County Council are proposing to carry out Section 50 on North Street, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Sep 2025 at 10:40.

Surrey County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Upfolds Green

Surrey County Council are proposing to carry out Highway repair and maintenance works on Upfolds Green, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 12:15.

Surrey County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Gosden Hill Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gosden Hill Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 11:45.

UK Power Networks South Eastern logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Silkmore Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Silkmore Lane, West Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Aug 2025 at 12:16.

UK Power Networks South Eastern logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Silkmore Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Silkmore Lane, West Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2025 at 08:57.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Camphill Road

Leep Utilities Electric are proposing to carry out New service connection on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 17 Sep 2025 at 11:18.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Camphill Road

Leep Utilities Electric are proposing to carry out New service connection on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 19 Sep 2025 at 09:46.

Surrey County Council logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Send Barns Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Send Barns Lane, Send.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Sep 2025 at 14:46.

Surrey County Council logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Send Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Send Road, Send.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Sep 2025 at 14:35.

Affinity Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Russell Road

Affinity Water are proposing to carry out Highway repair and maintenance works on Russell Road, Horsell, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Jul 2025 at 14:02.

Surrey County Council logo
Between
30 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Slyfield Green

Surrey County Council are proposing to carry out Works for road purposes on Slyfield Green, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Aug 2025 at 11:41.

Network Rail logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Walnut Tree Close

Network Rail are proposing to carry out Works for Rail Purposes on Walnut Tree Close, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jul 2025 at 12:48.

Surrey County Council logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Epsom Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Epsom Road, West Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Jul 2025 at 10:01.

Surrey County Council logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Epsom Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Epsom Road, West Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 13:03.

Surrey County Council logo
LONG TERM
Between
3 Nov and 20 Dec 2025
Details
View Map
Share
Follow
Heathside Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Heathside Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Sep 2025 at 12:24.

UK Power Networks South Eastern logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Bridge Barn Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Bridge Barn Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Aug 2025 at 15:05.

UK Power Networks South Eastern logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Bridge Barn Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Bridge Barn Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2025 at 12:12.

Surrey County Council logo
LONG TERM
Between
3 Nov and 20 Dec 2025
Details
View Map
Share
Follow
White Rose Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on White Rose Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Sep 2025 at 11:40.

Cadent Gas logo
LONG TERM
Between
3 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Scotland Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Scotland Bridge Road, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 15:37.

Surrey County Council logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Woking Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Sep 2025 at 08:55.

Surrey County Council logo
LONG TERM
Between
10 Nov 2025 and 10 May 2026
Details
View Map
Share
Follow
Chobham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Aug 2025 at 16:02.

Surrey County Council logo
LONG TERM
Between
10 Nov 2025 and 10 May 2026
Details
View Map
Share
Follow
Kettlewell Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kettlewell Hill, Horsell, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Aug 2025 at 15:54.

Cadent Gas logo
LONG TERM
Between
10 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Scotland Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Scotland Bridge Road, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:53.

Cadent Gas logo
LONG TERM
Between
10 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Scotland Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Scotland Bridge Road, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 11:00.

Affinity Water logo
LONG TERM
Between
17 Nov and 29 Dec 2025
Details
View Map
Share
Follow
Clandon Road

Affinity Water are proposing to carry out Utility asset works on Clandon Road, Send.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 29 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Sep 2025 at 16:19.

National Highways logo
Between
17 Nov and 6 Dec 2025
Details
View Map
Share
Portsmouth Road

National Highways were proposing to carry out Works for road purposes on Portsmouth Road, Cobham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 6 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 19 Sep 2025 at 11:23.

National Highways logo
Between
17 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

National Highways are proposing to carry out Works for road purposes on Portsmouth Road, Cobham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 6 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 19 Sep 2025 at 11:29.

Thames Water logo
Between
18 and 21 Nov 2025
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out New service connection on Grove Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 10:27.

Surrey County Council logo
Between
21 and 28 Nov 2025
Details
View Map
Share
Follow
Slyfield Green

Surrey County Council are proposing to carry out Works for road purposes on Slyfield Green, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Aug 2025 at 11:49.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
St Johns Hill Road

Network Rail are proposing to carry out Works for Rail Purposes on St Johns Hill Road, St Johns, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Aug 2025 at 16:04.

Surrey County Council logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Roundhill Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Roundhill Way, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 13:04.

Surrey County Council logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Hillcrest Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hillcrest Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 12:45.

Surrey County Council logo
Between
24 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Slyfield Green

Surrey County Council are proposing to carry out Works for road purposes on Slyfield Green, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Jun 2025 at 12:43.

National Highways logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Ockham Road North

National Highways are proposing to carry out Works for road purposes on Ockham Road North, Ockham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Feb 2025 at 12:18.

National Highways logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Portsmouth Road

National Highways were proposing to carry out Works for road purposes on Portsmouth Road, Ockham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 22 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Feb 2025 at 15:37.

National Highways logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Portsmouth Road

National Highways are proposing to carry out Works for road purposes on Portsmouth Road, Ockham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Feb 2025 at 12:15.

Southern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Park Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Park Road, Woking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 15:16.

Thames Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Artillery Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Artillery Terrace, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 10:51.

Network Rail logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Walnut Tree Close

Network Rail are proposing to carry out Works for Rail Purposes on Walnut Tree Close, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Sep 2025 at 14:08.

Thames Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Guildford Road, Mayford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Aug 2025 at 21:00.

Surrey County Council logo
Between
3 and 5 Dec 2025
Details
View Map
Share
Ockham Road South

Surrey County Council were proposing to carry out Highway repair and maintenance works on Ockham Road South, East Horsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2025 and run through until 5 December 2025. The works were due to impact the verge only.

This roadwork event was last updated by Surrey County Council on 19 Sep 2025 at 11:42.

Thames Water logo
Between
4 and 15 Dec 2025
Details
View Map
Share
Follow
Parkhurst Road

Thames Water are proposing to carry out Utility asset works on Parkhurst Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 16:23.

Surrey County Council logo
LONG TERM
Between
4 Dec 2025 and 7 Jan 2026
Details
View Map
Share
Follow
Woodlands Road

Surrey County Council are proposing to carry out Works for road purposes on Woodlands Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 7 January 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Surrey County Council on 1 Aug 2025 at 11:56.

Surrey County Council logo
LONG TERM
Between
4 Dec 2025 and 7 Jan 2026
Details
View Map
Share
Follow
Woodlands Road

Surrey County Council are proposing to carry out Works for road purposes on Woodlands Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 7 January 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Surrey County Council on 1 Aug 2025 at 11:57.

Thames Water logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Halfpenny Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 13:09.

UK Power Networks South Eastern logo
Between
8 and 14 Dec 2025
Details
View Map
Share
Follow
Keens Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Keens Lane, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 14 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Sep 2025 at 15:21.

Affinity Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Ockham Road South

Affinity Water are proposing to carry out Utility asset works on Ockham Road South, East Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Sep 2025 at 09:43.

UK Power Networks South Eastern logo
Between
12 and 19 Dec 2025
Details
View Map
Share
Follow
Clay Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Clay Lane, Jacobs Well.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Sep 2025 at 09:52.

Thames Water logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Addison Road

Thames Water are proposing to carry out Utility repair and maintenance works on Addison Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:35.


Roadworks Map near to Beech Drive, WOKING, GU23 6LG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 21 Sep 2025 22:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Beech Drive, WOKING, GU23 6LG (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
URGENT
  
BRAMBLE WAY 
(0.1 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 19 Sep 2025 09:20
(Scheduled: 19 Sep 2025 - 23 Sep 2025)
0.1
Details
Share
Follow
2
Surrey County Council logo
MAJOR
  
PORTSMOUTH ROAD 
(0.1 miles)
Surrey County Council
Works for road purposes - Footway, Carriageway, Verge - Two-way signals
In Progress
Since: 26 Apr 2025 07:30
(Scheduled: 26 Apr 2025 - 12 Oct 2025)
0.1
Details
Share
Follow
3
Southern Gas Networks logo
MAJOR
  
MAPLE ROAD 
(0.2 miles)
Southern Gas Networks
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway, Verge - Give and take
In Progress
Since: 2 Sep 2025 15:50
(Scheduled: 1 Sep 2025 - 22 Dec 2025)
0.2
Details
Share
Follow
4
UK Power Networks South Eastern logo
MAJOR
  
SEND MARSH ROAD 
(0.3 miles)
UK Power Networks South Eastern
New service connection - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 18 Aug 2025 - 26 Sep 2025)
0.3
Details
Share
5
Southern Gas Networks logo
MAJOR
  
SEND MARSH ROAD 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 1 Sep 2025 - 13 Feb 2026
0.3
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
SEND MARSH ROAD 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Cancelled
(Scheduled: 1 Sep 2025 - 13 Feb 2026)
0.3
Details
Share
7
Southern Gas Networks logo
MAJOR
  
SEND MARSH ROAD 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 2 Sep 2025 15:48
(Scheduled: 1 Sep 2025 - 19 Dec 2025)
0.3
Details
Share
Follow
8
MAJOR
  
CLANDON ROAD 
(0.3 miles)
Leep Utilities Electric
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 15 Sep 2025 - 26 Sep 2025
0.3
Details
Share
Follow
9
SEND BARNS LANE 
(0.3 miles)
Leep Utilities Electric
New service connection - Footway, Verge - No carriageway incursion
Planned
Scheduled: 15 Sep 2025 - 26 Sep 2025
0.3
Details
Share
Follow
10
SEND BARNS LANE 
(0.3 miles)
Leep Utilities Electric
New service connection - Footway, Verge - No carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 26 Sep 2025
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.