ROADWORKS SUMMARY
Theobalds Way, CAMBERLEY, GU16 9RF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Theobalds Way, GU16 9RF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Theobalds Way, CAMBERLEY, GU16 9RF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Theobalds Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Deepcut Bridge Road

Surrey County Council are carrying out Highway repair and maintenance works on Deepcut Bridge Road, Deepcut, Camberley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2023 at 07:00 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 21 Aug 2023 at 12:29.

Surrey County Council logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Mindenhurst Road

Surrey County Council are carrying out Highway improvement works on Mindenhurst Road, Deepcut, Camberley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2023 at 07:00 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Sep 2023 at 10:30.

Surrey County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Deepcut Bridge Road

Surrey County Council are carrying out Works for road purposes on Deepcut Bridge Road, Deepcut, Camberley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 08:55.

Southern Gas Networks logo
LONG TERM
Between
26 Jul and 16 Dec 2024
Details
View Map
Share
Portsmouth Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Portsmouth Road, Frimley, Camberley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 July 2024 and run through until 16 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 15:12.

Hampshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Farnborough Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Farnborough Road, Farnborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 15:24.

Cadent Gas logo
LONG TERM
Between
23 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Cadent Gas are proposing to carry out Utility asset works on Coronation Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 10:19.

Cadent Gas logo
LONG TERM
Between
23 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Cadent Gas are proposing to carry out Utility asset works on Coronation Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 11:12.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Cadent Gas are carrying out Utility asset works on Coronation Road, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 07:31 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 11:55.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Benner Lane

Surrey County Council are proposing to carry out Highway improvement works on Benner Lane, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 31 Jul 2024 at 07:47.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
7 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Pirbright Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Pirbright Road, Normandy.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 17 January 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2024 at 13:32.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
7 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Pirbright Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Pirbright Road, Normandy.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 14:50.

Network Rail logo
LONG TERM
Between
14 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Shawfield Road

Network Rail are proposing to carry out Works for Rail Purposes on Shawfield Road, Ash.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 28 February 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 20 Aug 2024 at 11:25.

Southern Gas Networks logo
LONG TERM
Between
14 Oct 2024 and 24 Feb 2025
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Frimley, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:20.

Surrey County Council logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Broadway Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Broadway Road, Lightwater.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Sep 2024 at 11:18.

Surrey County Council logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Broadway Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Broadway Road, Lightwater.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Sep 2024 at 07:37.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Windlesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:44.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Windlesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 07:22.

Southern Gas Networks logo
LONG TERM
Between
21 Oct 2024 and 2 May 2025
Details
View Map
Share
Follow
Hook Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Heath Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 11:53.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Albion Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2024 at 15:57.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Windlesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:00.

Cadent Gas logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are carrying out Utility asset works on London Road, Windlesham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 08:02 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 09:00.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 7 Mar 2025
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Windlesham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 10 Mar 2025
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Frimley, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 07:18.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Blackwater Valley Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Blackwater Valley Road, Ash.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 13:13.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Barrs Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barrs Lane, Knaphill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Aug 2024 at 10:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Lucas Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lucas Green Road, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Aug 2024 at 12:04.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Park Street

Surrey County Council were proposing to carry out Highway repair and maintenance works on Park Street, Camberley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Sep 2024 at 08:32.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Park Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Street, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 11:05.

Southern Gas Networks logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Portsmouth Road, Frimley, Camberley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 07:45 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:35.

Bracknell Forest Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Orchard Gate

Bracknell Forest Council are carrying out Highway repair and maintenance works on Orchard Gate, Sandhurst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 00:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 4 Nov 2024 at 16:19.

Surrey County Council logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Broadway Road

Surrey County Council are carrying out Highway repair and maintenance works on Broadway Road, Lightwater.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:30 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 13:38.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 16 Dec 2024
Details
View Map
Share
Prospect Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Prospect Road, Farnborough.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
11 Nov 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Crabtree Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crabtree Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 11:11.

Southern Gas Networks logo
LONG TERM
Between
11 Nov 2024 and 16 Jan 2025
Details
View Map
Share
Crabtree Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crabtree Road, Camberley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 16 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 12:50.

Southern Gas Networks logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Crabtree Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Crabtree Road, Camberley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 14:00 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 14:15.

Thames Water logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Longmeadow

Thames Water are carrying out Utility repair and maintenance works on Longmeadow, Frimley, Camberley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 07:35.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Round Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Round Close, Yateley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2024 at 09:49.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Snows Ride

Surrey County Council are proposing to carry out Highway repair and maintenance works on Snows Ride, Windlesham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Aug 2024 at 07:02.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Hatton Hill

Surrey County Council were proposing to carry out Highway repair and maintenance works on Hatton Hill, Windlesham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 10:38.

Southern Gas Networks logo
LONG TERM
Until
21 Jan 2025
Details
View Map
Share
Follow
Bayfield Avenue

Southern Gas Networks are carrying out roadworks on Bayfield Avenue, Frimley, Camberley.

These works are categorised as Major.

The works started on 14 November 2024 at 09:00 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 09:05.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Cadent Gas are carrying out Utility asset works on Coronation Road, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 09:18 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:15.

Surrey County Council logo
LONG TERM
Between
14 Nov 2024 and 14 May 2025
Details
View Map
Share
Blackwater Valley Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Blackwater Valley Road, Ash.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Aug 2024 at 14:10.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Gole Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gole Road, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 12:24.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Gole Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gole Road, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 10:26.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Dawney Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dawney Hill, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 12:23.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Dawney Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dawney Hill, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:50.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Connaught Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Connaught Road, Pirbright.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Aug 2024 at 09:19.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Connaught Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Connaught Road, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 12:24.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Connaught Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Connaught Road, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 14:40.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Bisley Camp Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bisley Camp Road, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 14:00.

Surrey County Council logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Bisley Camp Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bisley Camp Road, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:48.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Totland Close Footpath

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Totland Close Footpath, Farnborough.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Aug 2024 at 11:48.

Hampshire County Council logo
Between
18 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Pinewood Park

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Pinewood Park, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Aug 2024 at 13:59.

Hampshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Pinewood Park

Hampshire County Council are carrying out Highway repair and maintenance works on Pinewood Park, Farnborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 10:04.

Hampshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Greatfield Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Greatfield Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 10 Oct 2024 at 15:27.

Hampshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Greatfield Road

Hampshire County Council are carrying out Highway repair and maintenance works on Greatfield Road, Farnborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 07:13 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 07:22.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Crabtree Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crabtree Road, Camberley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 23 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 08:25.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Fenns Lane

Affinity Water are carrying out Utility repair and maintenance works on Fenns Lane, West End, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:29 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 07:08.

Surrey County Council logo
Between
18 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Station Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Station Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:05.

Surrey County Council logo
Between
18 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Station Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Station Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 08:33.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Cadent Gas are proposing to carry out Utility asset works on Coronation Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 10:06.

Surrey County Council logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Works for road purposes on Church Road, Windlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 12:56.

Hampshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Lakeside Gardens

Hampshire County Council are proposing to carry out Highway improvement works on Lakeside Gardens, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 25 Oct 2024 at 12:25.

Hampshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Lakeside Gardens

Hampshire County Council are proposing to carry out Highway improvement works on Lakeside Gardens, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Oct 2024 at 10:24.

Hampshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Fernhill Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Fernhill Road, Blackwater, Camberley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:40.

BT logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Chobham Road

BT were proposing to carry out Utility asset works on Chobham Road, Knaphill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by BT on 20 Sep 2024 at 15:08.

Bracknell Forest Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Long Mickle

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Long Mickle, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 21 Nov 2024 at 10:37.

Bracknell Forest Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Maxine Close

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Maxine Close, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 21 Nov 2024 at 11:09.

Bracknell Forest Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Maxine Close

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Maxine Close, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 21 Nov 2024 at 15:26.

Surrey County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Works for road purposes on Church Road, Windlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 14:19.

Network Rail logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Lakeside Road

Network Rail are proposing to carry out Works for Rail Purposes on Lakeside Road, Ash Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Sep 2024 at 14:18.

Network Rail logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Lakeside Road

Network Rail are proposing to carry out Works for Rail Purposes on Lakeside Road, Ash Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 12:43.

Hampshire County Council logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Follow
Kennels Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Kennels Lane, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 26 Jul 2024 at 14:26.

Hampshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Austen Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Austen Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 30 Oct 2024 at 15:42.

Hampshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Austen Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Austen Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 1 Nov 2024 at 09:29.

Network Rail logo
LONG TERM
Between
2 Jan and 30 May 2025
Details
View Map
Share
Follow
Shawfield Road

Network Rail are proposing to carry out Works for Rail Purposes on Shawfield Road, Ash.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 12:43.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Hunts Hill Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hunts Hill Road, Normandy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 09:34.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Rickford

BT are proposing to carry out Utility asset works on Rickford, Worplesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 13:14.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Bagshot Road

BT are proposing to carry out Utility asset works on Bagshot Road, Woking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 08:21.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Berry Lane

BT are proposing to carry out Utility asset works on Berry Lane, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 08:24.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Cove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cove Road, Farnborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 14:43.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
The Green

BT are proposing to carry out Utility asset works on The Green, Pirbright.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 13:10.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Avenue De Cagny

BT are proposing to carry out Utility asset works on Avenue De Cagny, Pirbright.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 14:01.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Dawney Hill

BT are proposing to carry out Utility asset works on Dawney Hill, Pirbright.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 15:37.

Hampshire County Council logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Blackwater Valley Road

Hampshire County Council were proposing to carry out Highway improvement works on Blackwater Valley Road, Mytchett, Camberley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 09:52.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
School Lane

BT are proposing to carry out Utility asset works on School Lane, Pirbright.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 13:59.

Network Rail logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Deepcut Bridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Deepcut Bridge Road, Deepcut, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Nov 2024 at 09:03.

Thames Water logo
LONG TERM
Between
6 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Deepcut Bridge Road

Thames Water are proposing to carry out Utility asset works on Deepcut Bridge Road, Deepcut, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 15:04.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Cemetery Pales

BT are proposing to carry out Utility asset works on Cemetery Pales, Brookwood, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 08:23.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Connaught Road

BT are proposing to carry out Utility asset works on Connaught Road, Brookwood, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 08:14.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Brookwood Lye Road

BT are proposing to carry out Utility asset works on Brookwood Lye Road, Brookwood, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 08:27.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Hermitage Road

BT are proposing to carry out Utility asset works on Hermitage Road, St Johns, Woking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 08:29.

Hampshire County Council logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Blackwater Valley Road

Hampshire County Council were proposing to carry out Highway improvement works on Blackwater Valley Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 13:23.

Hampshire County Council logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Blackwater Valley Road

Hampshire County Council are proposing to carry out Highway improvement works on Blackwater Valley Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Nov 2024 at 10:12.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Gorsewood Road

BT are proposing to carry out Utility asset works on Gorsewood Road, St Johns, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 08:12.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Frimley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Frimley Road, Frimley, Camberley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:27.

Surrey County Council logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Lane End Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lane End Drive, Knaphill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 15:00.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Frimley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Frimley Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 08:26.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Round Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Round Close, Yateley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 15:52.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Pennypot Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pennypot Lane, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 08:11.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Bagshot By-pass

BT were proposing to carry out Utility repair and maintenance works on Bagshot By-pass, Bagshot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 31 Oct 2024 at 11:10.

Hampshire County Council logo
Between
8 and 16 Jan 2025
Details
View Map
Share
Blackwater Valley Road

Hampshire County Council were proposing to carry out Highway improvement works on Blackwater Valley Road, Mytchett, Camberley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 09:53.

Hampshire County Council logo
Between
8 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwater Valley Road

Hampshire County Council are proposing to carry out Highway improvement works on Blackwater Valley Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Nov 2024 at 10:11.

Surrey County Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Windlesham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Windlesham Road, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 10:54.

UK Power Networks South Eastern logo
Between
11 and 23 Jan 2025
Details
View Map
Share
Follow
Littlewick Road

UK Power Networks South Eastern are proposing to carry out New service connection on Littlewick Road, Knaphill, Woking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 23 January 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Sep 2024 at 15:02.

UK Power Networks South Eastern logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Littlewick Road

UK Power Networks South Eastern were proposing to carry out New service connection on Littlewick Road, Knaphill, Woking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 09:14.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:07.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 14:52.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Upper Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Park Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:57.

Hampshire County Council logo
Between
15 and 27 Jan 2025
Details
View Map
Share
Follow
Alexandra Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Aug 2024 at 08:49.

Hampshire County Council logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Canterbury Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Canterbury Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Aug 2024 at 11:28.

Hampshire County Council logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Canterbury Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Canterbury Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Aug 2024 at 12:20.

Southern Gas Networks logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Mytchett Lake Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mytchett Lake Road, Mytchett, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 08:31.

Hampshire County Council logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Sycamore Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Sycamore Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Aug 2024 at 12:20.

Hampshire County Council logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Manor Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Manor Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Aug 2024 at 12:19.

Hampshire County Council logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Chiltern Avenue

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Chiltern Avenue, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Aug 2024 at 14:08.

Surrey County Council logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Lane End Drive

Surrey County Council were proposing to carry out Highway repair and maintenance works on Lane End Drive, Knaphill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 14:59.

Hampshire County Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
The Grove

Hampshire County Council are proposing to carry out Highway repair and maintenance works on The Grove, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 16 Sep 2024 at 11:12.

Hampshire County Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
The Grove

Hampshire County Council were proposing to carry out Highway repair and maintenance works on The Grove, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Nov 2024 at 11:41.

Hampshire County Council logo
Between
30 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Sycamore Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Sycamore Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 16 Sep 2024 at 12:03.

Hampshire County Council logo
Between
30 Jan and 4 Feb 2025
Details
View Map
Share
Sycamore Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Sycamore Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Nov 2024 at 11:41.

Hampshire County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Reading Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Reading Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 17 Oct 2024 at 13:26.

Hampshire County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Reading Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Reading Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 18 Oct 2024 at 10:33.

National Highways logo
LONG TERM
Between
3 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Bagshot By-pass

National Highways are proposing to carry out Highway repair and maintenance works on Bagshot By-pass, Bagshot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Sep 2024 at 11:57.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Guildford Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Guildford Road, Normandy.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2024 at 11:35.

Southern Gas Networks logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Mytchett Lake Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mytchett Lake Road, Mytchett, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 14:48.

Hampshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Manor Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Manor Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Nov 2024 at 14:16.

Hampshire County Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Fernhill Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Fernhill Road, Blackwater, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 16:36.

Affinity Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Red Lion Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Red Lion Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:59.

Hampshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Chiltern Avenue

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Chiltern Avenue, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Nov 2024 at 14:21.

Hampshire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Trunk Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Trunk Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 16 Sep 2024 at 14:21.

Hampshire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Trunk Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Trunk Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 11 Oct 2024 at 13:43.

Hampshire County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Pinewood Park

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Pinewood Park, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 11 Oct 2024 at 12:50.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Yorktown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yorktown Road, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 09:19.


Roadworks Map near to Theobalds Way, CAMBERLEY, GU16 9RF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Theobalds Way, CAMBERLEY, GU16 9RF (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Fibre & Wireless Networks logo
THE MAULTWAY 
(0.3 miles)
Fibre & Wireless Networks
Utility repair and maintenance works - Verge - No carriageway incursion
Complete
20 Nov 2024 13:10 - 17:20
0.3
Details
Share
2
Fibre & Wireless Networks logo
OLD BISLEY ROAD, FRIMLEY 
(0.4 miles)
Fibre & Wireless Networks
Utility repair and maintenance works - Verge - No carriageway incursion
In Progress
Since: 21 Nov 2024 12:20
(Scheduled: 20 Nov 2024 - 25 Nov 2024)
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.