ROADWORKS SUMMARY
Brunswick Road, CAMBERLEY, GU16 6FE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Brunswick Road, GU16 6FE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Brunswick Road, CAMBERLEY, GU16 6FE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brunswick Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hampshire County Council logo
LONG TERM
Between
3 Feb and 24 Dec 2025
Details
View Map
Share
Follow
Denmark Street

Hampshire County Council are proposing to carry out Works for road purposes on Denmark Street, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 5 Dec 2024 at 12:04.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Saunders Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Saunders Lane, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Mar 2025 at 08:11.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Gresham Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gresham Way, Frimley Green, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 11:56.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Gorsewood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gorsewood Road, St Johns, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Jan 2025 at 14:33.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Barrs Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barrs Lane, Knaphill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Dec 2024 at 07:37.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Lucas Green Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Lucas Green Road, West End, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 13:28.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Martindale Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Martindale Avenue, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 11:33.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Church Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Lane, Bisley, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 15:01.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Park Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Street, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 18 Dec 2024 at 07:00.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Elsenwood Drive

Surrey County Council were proposing to carry out Highway repair and maintenance works on Elsenwood Drive, Camberley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 15:00.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Bagshot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 07:55.

Surrey County Council logo
LONG TERM
Between
5 May and 20 Sep 2025
Details
View Map
Share
Follow
Foreman Road

Surrey County Council are proposing to carry out Works for road purposes on Foreman Road, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 2 May 2025 at 09:42.

Surrey County Council logo
LONG TERM
Until
18 Oct 2025
Details
View Map
Share
Follow
Foreman Road

Surrey County Council are carrying out Works for road purposes on Foreman Road, Ash.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 08:00 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 07:34.

Surrey County Council logo
LONG TERM
Between
5 May and 20 Sep 2025
Details
View Map
Share
Follow
Ash Green Road

Surrey County Council are proposing to carry out Works for road purposes on Ash Green Road, Ash Green, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 2 May 2025 at 09:43.

Surrey County Council logo
LONG TERM
Until
18 Oct 2025
Details
View Map
Share
Follow
Ash Green Road

Surrey County Council are carrying out Works for road purposes on Ash Green Road, Ash Green, Guildford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 08:00 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 09:44.

Southern Gas Networks logo
LONG TERM
Between
12 May and 29 Sep 2025
Details
View Map
Share
Farnborough Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnborough Road, Farnborough.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 29 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 11:01.

Surrey County Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Lightwater By-pass

Surrey County Council are carrying out Works for road purposes on Lightwater By-pass, Lightwater.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 07:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 27 Aug 2025 at 08:39.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Priest Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Priest Lane, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 17 Mar 2025 at 07:19.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Lucas Green Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Lucas Green Road, West End, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Feb 2025 at 10:14.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Lucas Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lucas Green Road, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 18 Mar 2025 at 08:27.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 22 Sep 2025
Details
View Map
Share
Sandy Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandy Lane, Farnborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 12:39.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Sandy Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane, Farnborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 13:07.

Hampshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
North Lane

Hampshire County Council are carrying out Highway repair and maintenance works on North Lane, Aldershot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 July 2025 at 09:30 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 1 Sep 2025 at 09:22.

Surrey County Council logo
LONG TERM
Between
1 Jul 2025 and 1 Jan 2026
Details
View Map
Share
Follow
Saunders Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Saunders Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 1 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Mar 2025 at 14:16.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Frimley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Frimley Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Jan 2025 at 07:33.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Frimley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Frimley Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Jun 2025 at 07:57.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Watchetts Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Watchetts Drive, Camberley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:25 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2025 at 08:33.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Park Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Park Road, Camberley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 11:16.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Park Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Park Road, Camberley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 09:57.

Southern Gas Networks logo
LONG TERM
Between
11 Aug and 22 Sep 2025
Details
View Map
Share
Princes Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Princes Way, Aldershot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:25.

Southern Gas Networks logo
LONG TERM
Between
11 Aug and 22 Sep 2025
Details
View Map
Share
Hospital Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hospital Hill, Aldershot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:22.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
11 Aug and 16 Sep 2025
Details
View Map
Share
Apollo Rise

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Apollo Rise, Farnborough.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 16 September 2025. The works were due to impact the carriageway, verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 May 2025 at 10:20.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Fairview Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairview Road, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:57.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Ash Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ash Hill Road, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:59.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Queens Road

Thames Water are carrying out Utility repair and maintenance works on Queens Road, Aldershot.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 10:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 16:02.

Southern Gas Networks logo
LONG TERM
Until
23 Sep 2025
Details
View Map
Share
Follow
Farnborough Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Farnborough Road, Farnborough.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 17:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:24.

Southern Gas Networks logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Sycamore Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Sycamore Road, Farnborough.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2025 at 17:00 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 09:07.

Surrey County Council logo
Tomorrow
Details
View Map
Share
Bracknell Road

Surrey County Council carried out Highway repair and maintenance works on Bracknell Road, Bagshot.

The road was closed for some or all of the period.

The works were originally planned between 29 Aug 2025 and 4 Sep 2025 and were actually completed between 29 Aug 2025 (14:00) and 3 Sep 2025 (09:25). The works impacted the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2025 at 09:26.

Southern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Wyke Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyke Avenue, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 14:16.

Southern Gas Networks logo
Until
19 Sep 2025
Details
View Map
Share
Follow
Wyke Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Wyke Avenue, Ash.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 14:40 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 14:44.

Southern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Wyke Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyke Lane, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 14:16.

Southern Gas Networks logo
Until
23 Sep 2025
Details
View Map
Share
Follow
Wyke Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Wyke Lane, Ash.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:05 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 13 Oct 2025
Details
View Map
Share
Farnborough Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farnborough Road, Aldershot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:27.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 13 Oct 2025
Details
View Map
Share
Fleet Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fleet Road, Aldershot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:30.

Southern Gas Networks logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Prospect Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prospect Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 09:03.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Halebourne Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Halebourne Lane, Chobham, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jul 2025 at 09:49.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Halebourne Lane

Scottish Hydro Electric Power Dis are carrying out New service connection on Halebourne Lane, Chobham, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:18 and could run through until 5 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Sep 2025 at 10:35.

South East Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Pleasant Road

South East Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 12 May 2025 at 07:29.

South East Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Pleasant Road

South East Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 20 May 2025 at 07:54.

South East Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Pleasant Road

South East Water are carrying out Utility repair and maintenance works on Mount Pleasant Road, Aldershot.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 11:10 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 2 Sep 2025 at 13:05.

Southern Gas Networks logo
Between
2 and 16 Sep 2025
Details
View Map
Share
Follow
Wellington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellington Road, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 16 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 09:40.

Hampshire County Council logo
Between
5 and 17 Sep 2025
Details
View Map
Share
Follow
North Lane

Hampshire County Council are proposing to carry out Highway improvement works on North Lane, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Jun 2025 at 09:28.

Surrey County Council logo
Between
8 and 24 Sep 2025
Details
View Map
Share
Follow
Aldershot Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Aldershot Road, Worplesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 May 2025 at 21:36.

Surrey County Council logo
Between
8 and 24 Sep 2025
Details
View Map
Share
Follow
Aldershot Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Aldershot Road, Worplesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 May 2025 at 20:05.

T-Mobile (UK) logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Rectory Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rectory Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 17 Jul 2025 at 08:52.

Southern Gas Networks logo
LONG TERM
Between
8 Sep 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 2 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 10:00.

Southern Gas Networks logo
LONG TERM
Between
8 Sep 2025 and 2 Jan 2026
Details
View Map
Share
Portsmouth Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Portsmouth Road, Camberley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 2 January 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:22.

Surrey County Council logo
Between
15 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Oxenden Court

Surrey County Council are proposing to carry out Highway repair and maintenance works on Oxenden Court, Tongham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Apr 2025 at 13:27.

Southern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Elm Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elm Grove Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Southwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southwood Road, Farnborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:59.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Union Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Union Street, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 10:40.

Surrey County Council logo
Between
15 and 20 Sep 2025
Details
View Map
Share
Follow
Blackwater Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackwater Valley Road, Frimley, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 25 Jul 2025 at 10:29.

Surrey County Council logo
Between
15 and 20 Sep 2025
Details
View Map
Share
Follow
Blackwater Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackwater Valley Road, Frimley, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 4 Aug 2025 at 15:18.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Yorktown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yorktown Road, Sandhurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:32.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Yorktown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yorktown Road, Sandhurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:07.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 29 Nov 2025
Details
View Map
Share
Follow
The Broadway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Broadway, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:00.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 29 Nov 2025
Details
View Map
Share
Follow
The Broadway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Broadway, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:37.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Albion Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:01.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Albion Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 10:01.

Southern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Wellington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellington Road, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 09:10.

Hampshire County Council logo
Between
16 and 23 Sep 2025
Details
View Map
Share
Follow
Martins Close

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Martins Close, Blackwater, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jul 2025 at 14:24.

Hampshire County Council logo
Between
16 and 23 Sep 2025
Details
View Map
Share
Follow
Martins Close

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Martins Close, Blackwater, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 16 Jul 2025 at 10:49.

Scottish Hydro Electric Power Dis logo
Between
17 Sep and 16 Oct 2025
Details
View Map
Share
Summit Avenue

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Summit Avenue, Farnborough.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2025 and run through until 16 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 May 2025 at 11:00.

Surrey County Council logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Poyle Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Poyle Road, Tongham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Jun 2025 at 15:04.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 22 Dec 2025
Details
View Map
Share
Guildford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Guildford Road, Ash.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 22 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 15:35.

Southern Gas Networks logo
LONG TERM
Between
22 Sep 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:29.

T-Mobile (UK) logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Rectory Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rectory Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 27 Aug 2025 at 15:29.

Surrey County Council logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Poyle Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Poyle Road, Tongham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Aug 2025 at 13:17.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Ively Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ively Road, Farnborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 10:14.

Network Rail logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Lysons Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Lysons Avenue, Ash Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Jun 2025 at 10:39.

Network Rail logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Lysons Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Lysons Avenue, Ash Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Aug 2025 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
6 Oct 2025 and 23 Jan 2026
Details
View Map
Share
Portsmouth Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Portsmouth Road, Camberley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 23 January 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 09:54.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 20 Dec 2025
Details
View Map
Share
Upper Park Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Park Road, Camberley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 20 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 15:35.

Southern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Acacia Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acacia Avenue, Owlsmoor, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Jul 2025 at 10:01.

Surrey County Council logo
LONG TERM
Between
14 Oct 2025 and 14 Mar 2026
Details
View Map
Share
Follow
Elsenwood Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Elsenwood Drive, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Jul 2025 at 12:04.

Surrey County Council logo
Between
20 and 27 Oct 2025
Details
View Map
Share
Follow
Poyle Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Poyle Road, Tongham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Aug 2025 at 11:55.

Surrey County Council logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Oxenden Court

Surrey County Council are proposing to carry out Highway repair and maintenance works on Oxenden Court, Tongham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Aug 2025 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
20 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 07:54.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Pennypot Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pennypot Lane, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 09:50.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Pennypot Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pennypot Lane, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 18:34.

Surrey County Council logo
Between
22 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Priest Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Priest Lane, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Aug 2025 at 10:47.

Surrey County Council logo
Between
22 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Lucas Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lucas Green Road, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 11:18.

Surrey County Council logo
Between
22 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Lucas Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lucas Green Road, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 09:45.

South East Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Church Lane West

South East Water are proposing to carry out Utility repair and maintenance works on Church Lane West, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 12 May 2025 at 09:22.

South East Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Church Lane West

South East Water are proposing to carry out Utility repair and maintenance works on Church Lane West, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 20 May 2025 at 08:00.

South East Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Church Lane West

South East Water are proposing to carry out Utility repair and maintenance works on Church Lane West, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 23 Jul 2025 at 23:14.

Surrey County Council logo
LONG TERM
Between
27 Oct and 20 Dec 2025
Details
View Map
Share
Follow
Ash Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Street, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 08:31.

Surrey County Council logo
LONG TERM
Between
27 Oct and 20 Dec 2025
Details
View Map
Share
Follow
Ash Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Church Road, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Sep 2025 at 08:46.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Oct 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Lulworth Close Footpaths

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Lulworth Close Footpaths, Farnborough.

These works are categorised as Major.

The works will start on or after 27 October 2025 and could run through until 12 January 2026. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Jun 2025 at 12:17.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Oct 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Robin Hood Close Footpaths

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Robin Hood Close Footpaths, Farnborough.

These works are categorised as Major.

The works will start on or after 27 October 2025 and could run through until 12 January 2026. The works will impact the verge and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Jun 2025 at 09:39.

Cadent Gas logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Pennypot Lane

Cadent Gas are proposing to carry out Utility asset works on Pennypot Lane, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 07:21.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Swan Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swan Lane, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:56.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Swan Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swan Lane, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 08:58.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Yorktown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yorktown Road, Sandhurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 08:47.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Yorktown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yorktown Road, Sandhurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 09:36.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
York Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Way, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:58.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
York Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Way, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:08.

Southern Gas Networks logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Acacia Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acacia Avenue, Owlsmoor, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 09:25.

Surrey County Council logo
LONG TERM
Between
3 Nov 2025 and 7 Jan 2026
Details
View Map
Share
Follow
White Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on White Lane, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 Jul 2025 at 10:24.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Harpers Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harpers Road, Ash.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Mar 2025 at 12:59.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Harpers Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Harpers Road, Ash.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 1 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 15:36.

BT logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Harpers Road

BT are proposing to carry out Utility asset works on Harpers Road, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 31 Mar 2025 at 14:38.

Surrey County Council logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Whitmoor Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Whitmoor Road, Bagshot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Sep 2025 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Lakeside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakeside Road, Ash Vale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 13:53.

Southern Gas Networks logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Lakeside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakeside Road, Ash Vale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 12:09.

Southern Gas Networks logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Lakeside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakeside Road, Ash Vale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 13:45.

BT logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Barley Mow Lane

BT are proposing to carry out Utility asset works on Barley Mow Lane, Knaphill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 22 Aug 2025 at 15:59.

Southern Gas Networks logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on High Street, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 09:09.

Southern Gas Networks logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on London Road, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:45.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Guildford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Guildford Road, Ash.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 22 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 15:37.

Affinity Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Stanley Hill

Affinity Water are proposing to carry out Utility asset works on Stanley Hill, Pirbright.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 26 Aug 2025 at 14:40.

Southern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Swan Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swan Lane, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 15:35.

Southern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Swan Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swan Lane, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:54.

Southern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Swan Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swan Lane, Sandhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:23.

BT logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Mytchett Place Road

BT are proposing to carry out Utility asset works on Mytchett Place Road, Mytchett, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Sep 2025 at 11:29.

Hampshire County Council logo
Between
1 and 9 Dec 2025
Details
View Map
Share
Follow
Birchett Road

Hampshire County Council are proposing to carry out Highway improvement works on Birchett Road, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 23 Jan 2025 at 11:17.

Hampshire County Council logo
Between
1 and 9 Dec 2025
Details
View Map
Share
Follow
Birchett Road

Hampshire County Council are proposing to carry out Highway improvement works on Birchett Road, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 24 Jan 2025 at 15:26.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Dec 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Lulworth Close Footpaths

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Lulworth Close Footpaths, Farnborough.

These works are categorised as Major.

The works will start on or after 1 December 2025 and could run through until 16 February 2026. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jun 2025 at 09:01.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Dec 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Robin Hood Close Footpaths

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Robin Hood Close Footpaths, Farnborough.

These works are categorised as Major.

The works will start on or after 1 December 2025 and could run through until 16 February 2026. The works will impact the verge and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jun 2025 at 09:01.


Roadworks Map near to Brunswick Road, CAMBERLEY, GU16 6FE (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Brunswick Road, CAMBERLEY, GU16 6FE (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Scottish Hydro Electric Power Dis logo
URGENT
  
QUEENSWAY, FRIMLEY GREEN 
(0.7 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Give and take
Complete
31 Aug 2025 18:54 - 3 Sep 2025 11:50
0.7
Details
Share
2
Virgin Media logo
CALSHOT WAY, FRIMLEY 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 4 Sep 2025 - 5 Sep 2025
0.8
Details
Share
Follow
3
Scottish Hydro Electric Power Dis logo
URGENT
  
GUILDFORD ROAD, FRIMLEY GREEN 
(0.8 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 1 Sep 2025 08:59
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
0.8
Details
Share
Follow
4
BT logo
GUILDFORD ROAD, SURREY 
(0.9 miles)
BT
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.