ROADWORKS SUMMARY
Tyndale Road, GLOUCESTER, GL2 7DL
Introduction
View current and future planned roadworks and road closures for Tyndale Road, GL2 7DL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Tyndale Road, GLOUCESTER, GL2 7DL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tyndale Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
20 Dec 2024
Gloucestershire County Council are carrying out Highway repair and maintenance works on Station Road, Berkeley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 January 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 30 Sep 2024 at 10:36.
28 Jan 2025
Gloucestershire County Council are carrying out Highway repair and maintenance works on Road From Junction At Gurshill Farm To Junction At Chandlers, Etloe.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 January 2024 at 10:49 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 5 Nov 2024 at 11:27.
30 Jan 2025
Gloucestershire County Council are carrying out Highway repair and maintenance works on Millend, Blakeney.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 June 2024 at 14:22 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 6 Dec 2024 at 10:02.
29 Aug 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Road To Downton Farm, Stanley Downton, Stonehouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 13:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 14:13.
25 Nov 2024 and 29 Aug 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Greenstyles To Bath Road Leonard Stanley, Stanley Downton, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:03.
4 Sep 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Greenstyles To Bath Road Leonard Stanley, Stanley Downton, Stonehouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 17:00 and could run through until 4 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 2 Dec 2024 at 08:38.
25 Nov 2024 and 29 Aug 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Farm To Railway Underpass, Stanley Downton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 12:43.
4 Sep 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Farm To Railway Underpass, Stanley Downton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 13:00 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 14:35.
25 Nov 2024 and 29 Aug 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Road To Downton Farm, Stanley Downton, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:03.
25 Nov 2024 and 29 Aug 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Road, Bridgend, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:05.
25 Nov 2024 and 29 Aug 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Road, Bridgend, Stonehouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 31 Oct 2024 at 12:56.
29 Aug 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Road, Bridgend, Stonehouse.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 13:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 14:11.
Tomorrow
Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Jul 2024 at 09:53.
Tomorrow
Network Rail were proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 16 Oct 2024 at 09:53.
Tomorrow
Gloucestershire County Council are carrying out Highway repair and maintenance works on The Ham, Coaley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 10 Dec 2024 at 08:12.
Today
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Overton Lane, Arlingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 09:36.
Wednesday
Severn Trent Water are proposing to carry out roadworks on The Broadway, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Sep 2024 at 13:05.
Wednesday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 17 Sep 2024 at 12:59.
Wednesday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 26 Sep 2024 at 11:03.
6 and 8 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Damery Lane, Woodford, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 09:59.
6 and 27 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Ann Wicks Road, Frampton On Severn.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Nov 2024 at 10:14.
6 and 8 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Damery Lane, Woodford, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 12 Nov 2024 at 12:43.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Elcombe, Uley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 27 Sep 2024 at 11:03.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Elcombe, Uley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 14:16.
13 and 15 Jan 2025
Gigaclear are proposing to carry out Utility asset works on The Splatt, Frampton On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 21 Oct 2024 at 09:57.
13 and 24 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on High Street, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 08:48.
14 and 17 Jan 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Coldharbour Farm To Hydegate, Uley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 10 Oct 2024 at 11:01.
14 and 17 Jan 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Drake Lane To Coldharbour Farm, Farfield, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 10 Oct 2024 at 11:01.
15 and 17 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Elcombe, Uley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 10:58.
15 and 17 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Elcombe, Uley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 08:28.
20 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Aug 2024 at 08:29.
20 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 30 Jul 2024 at 12:58.
21 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Silver Street, Coaley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 28 Nov 2024 at 10:06.
21 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Silver Street, Coaley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 07:56.
22 and 24 Jan 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Road From Junction With A48 To Junction At Gurshill Farm, The Purlieu, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:23.
22 and 24 Jan 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Road From Junction At Gurshill Farm To Junction At Chandlers, Etloe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:23.
22 and 24 Jan 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Lensbrook, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:23.
24 and 28 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Damery Lane, Woodford, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 28 Nov 2024 at 08:26.
24 and 28 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Damery Lane, Woodford, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 29 Nov 2024 at 07:41.
27 Jan and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Uley Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 13:55.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Corner House To Primrose Cottage, Purton, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:11.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Stambourne Lane To Vinecroft Wanswell, Wanswell, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:13.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Riddle Street To Slimbridge Lane, Halmore, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:09.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Road From Lammastide Inn To Stambourne Lane, New Brookend, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:14.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Brookend Lane To Lammastide Inn Brookend, Old Brookend, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:14.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Luggs Farm To The Malthouse Sharpness, Sharpness, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:13.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Riddle Street, Purton, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:10.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Purton To Shamrock House Hinton, Purton, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:12.
28 Jan and 5 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on 3229 Shamrock House Hinton To Station Road Sharpness, Hinton, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:12.
3 and 5 Feb 2025
Gigaclear were proposing to carry out Utility asset works on Ashmead, Cam.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 14:45.
3 and 14 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Church Road, Leonard Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 10:00.
3 and 14 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Church Road, Leonard Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 27 Nov 2024 at 11:54.
3 and 12 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Quietways, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 08:04.
3 and 12 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Quietways, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 10:33.
5 and 7 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Road From Junction With A48 To Junction At Gurshill Farm, The Purlieu, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 2 Dec 2024 at 14:55.
5 and 12 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Sanigar Lane, Newtown, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 15:05.
5 and 12 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Gloucester Road, Newtown, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 15:04.
5 and 12 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Oldminster Road, Sharpness, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 15:04.
5 and 7 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Road From Junction At Gurshill Farm To Junction At Chandlers, Etloe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 2 Dec 2024 at 14:54.
5 and 7 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Lensbrook, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 2 Dec 2024 at 14:53.
11 and 14 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Road From High Street Berkeley To Ham, Ham, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 15:10.
11 and 14 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on High Street, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 14:28.
14 and 17 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 12:00.
17 and 28 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Uley Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 08:53.
18 and 21 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on May Lane, Dursley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 08:49.
21 and 25 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Woodford, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.
3 and 7 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 30 Jul 2024 at 11:31.
3 and 7 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Aug 2024 at 08:28.
3 and 7 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Grove Lane, Westend, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 11:38.
3 and 7 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Grove Lane, Westend, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 12:23.
7 and 11 Mar 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Passage Road, Saul.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.
11 and 14 Mar 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Passage Road, Saul.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 10 Oct 2024 at 11:12.
Roadworks Map near to Tyndale Road, GLOUCESTER, GL2 7DL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Tyndale Road, GLOUCESTER, GL2 7DL (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.