ROADWORKS SUMMARY
Burma Road, BERKELEY, GL13 9UQ
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for Burma Road, GL13 9UQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Burma Road, BERKELEY, GL13 9UQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Burma Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
21 Apr 2025
Gloucestershire County Council are carrying out Highway repair and maintenance works on Road From Junction At Gurshill Farm To Junction At Chandlers, Etloe.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 January 2024 at 10:49 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 27 Jan 2025 at 12:13.
10 Apr 2025
Gloucestershire County Council are carrying out Highway repair and maintenance works on New Road, Whitecroft.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 January 2024 at 12:00 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 17 Jan 2025 at 09:45.
28 Mar 2025
Gloucestershire County Council are carrying out Highway repair and maintenance works on Millend, Blakeney.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 June 2024 at 14:22 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 30 Jan 2025 at 10:22.
31 Mar 2025
Gloucestershire County Council are carrying out Highway repair and maintenance works on Newerne Street, Lydney.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 12 Feb 2025 at 14:52.
31 Jan and 28 Feb 2025
Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on Newnham Road, Blakeney.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Feb 2025 at 10:16.
28 Feb 2025
Gloucestershire County Council are carrying out Highway repair and maintenance works on Newnham Road, Blakeney.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 12:42 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 5 Feb 2025 at 11:36.
4 and 28 Feb 2025
Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on Newnham Road, Blakeney.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 6 Feb 2025 at 11:45.
17 and 28 Feb 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on New Road, Whitecroft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 2 Jan 2025 at 10:33.
17 and 28 Feb 2025
Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on New Road, Whitecroft.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 24 Dec 2024 at 12:17.
21 and 25 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Stone, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.
21 and 25 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Woodford, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.
21 and 25 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Gloucester Road, Stone, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.
24 Feb and 4 Apr 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Woodland Rise, Lydney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 13 Feb 2025 at 16:29.
24 Feb and 14 Mar 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on New Road, Whitecroft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 6 Feb 2025 at 15:32.
5 and 7 Mar 2025
Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on 300006 Alvington Village, Lydney.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 11 Dec 2024 at 16:05.
5 and 7 Mar 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on 300006 Alvington Village, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 23 Dec 2024 at 10:10.
5 and 7 Mar 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on 300006 Alvington Village, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 24 Dec 2024 at 12:26.
17 and 19 Mar 2025
Gigaclear were proposing to carry out Utility asset works on Mule Street, Woodford, Berkeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 24 Dec 2024 at 14:11.
17 and 21 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Cam Footpath 53, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footpath only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:13.
17 and 21 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Cam Footpath 53, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footpath only.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:53.
17 and 21 Mar 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Driffield Road, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 8 Oct 2024 at 11:50.
18 and 21 Mar 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on 500046 Pleasant View, Blakeney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 12 Dec 2024 at 15:55.
18 and 28 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Marment Road, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:48.
18 and 21 Mar 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on 500046 Pleasant View, Blakeney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 24 Dec 2024 at 13:04.
18 and 28 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Marment Road, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:32.
21 Mar and 3 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Woodend Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:57.
21 Mar and 3 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Knapp Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 10 Jan 2025 at 07:48.
21 Mar and 3 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Knapp Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:03.
21 Mar and 3 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Woodend Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:42.
24 and 26 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Road, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 10:29.
24 and 26 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Road, Lydney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 12:51.
24 and 28 Mar 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Road From Junction With Branches Road To Junction With A48, Awre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 12 Dec 2024 at 16:19.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:28.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:15.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:42.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 109 To 115 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:29.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 109 To 115 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:36.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:48.
1 and 3 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oldcroft Road, Oldcroft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 16:23.
1 and 3 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oldcroft Road, Oldcroft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 16:28.
7 and 9 Apr 2025
Gigaclear are proposing to carry out Remedial works on New Road, Blakeney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gigaclear on 29 Jan 2025 at 11:52.
7 and 9 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Road From Junction With New Road To Park, Parkend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 31 Jan 2025 at 10:14.
7 and 9 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Road From Junction With New Road To Park, Parkend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Feb 2025 at 17:01.
14 and 16 Apr 2025
Gigaclear are proposing to carry out Remedial works on New Road, Blakeney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gigaclear on 10 Feb 2025 at 16:14.
14 and 22 Apr 2025
Gigaclear are proposing to carry out Utility asset works on Field Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 23 Jan 2025 at 14:36.
22 and 24 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Etloe Road, Blakeney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Feb 2025 at 17:05.
23 and 29 Apr 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Blakeney Hill Road, Blakeney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 31 Jan 2025 at 08:02.
28 and 30 Apr 2025
Gigaclear are proposing to carry out Utility asset works on Clapton Road, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 15 Feb 2025 at 07:54.
30 Apr and 2 May 2025
Gigaclear were proposing to carry out Utility asset works on Damery Lane, Woodford, Berkeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 31 Jan 2025 at 15:15.
6 and 8 May 2025
Severn Trent Water are proposing to carry out New service connection on Sun Green Road, Bream.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 31 Jan 2025 at 09:15.
Roadworks Map near to Burma Road, BERKELEY, GL13 9UQ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Burma Road, BERKELEY, GL13 9UQ (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.