ROADWORKS SUMMARY
Jenner Court, BERKELEY, GL13 9BT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Jenner Court, GL13 9BT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Jenner Court, BERKELEY, GL13 9BT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Jenner Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Gloucestershire County Council logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
Road From Junction At Gurshill Farm To Junction At Chandlers

Gloucestershire County Council are carrying out Highway repair and maintenance works on Road From Junction At Gurshill Farm To Junction At Chandlers, Etloe.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 January 2024 at 10:49 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Jan 2025 at 12:13.

Gloucestershire County Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Millend

Gloucestershire County Council are carrying out Highway repair and maintenance works on Millend, Blakeney.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 June 2024 at 14:22 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 30 Jan 2025 at 10:22.

Gloucestershire County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Newerne Street

Gloucestershire County Council are carrying out Highway repair and maintenance works on Newerne Street, Lydney.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 12 Feb 2025 at 14:52.

Gloucestershire County Council logo
Between
31 Jan and 28 Feb 2025
Details
View Map
Share
Newnham Road

Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on Newnham Road, Blakeney.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Feb 2025 at 10:16.

Gloucestershire County Council logo
Until
28 Feb 2025
Details
View Map
Share
Follow
Newnham Road

Gloucestershire County Council are carrying out Highway repair and maintenance works on Newnham Road, Blakeney.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 12:42 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 5 Feb 2025 at 11:36.

South Gloucestershire Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Little Bristol Lane

South Gloucestershire Council are carrying out Highway improvement works on Little Bristol Lane, Charfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 07:45 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 3 Feb 2025 at 08:22.

Gloucestershire County Council logo
Between
4 and 28 Feb 2025
Details
View Map
Share
Newnham Road

Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on Newnham Road, Blakeney.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 6 Feb 2025 at 11:45.

Gloucestershire County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
New Road

Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on New Road, Whitecroft.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 24 Dec 2024 at 12:17.

Gloucestershire County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
New Road

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on New Road, Whitecroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 2 Jan 2025 at 10:33.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
May Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on May Lane, Dursley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 08:49.

Gloucestershire County Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Damery Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Stone, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.

Gloucestershire County Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Gloucester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Gloucester Road, Stone, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.

Gloucestershire County Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Damery Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Woodford, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.

Wales And West Utilities logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Woodland Rise

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Woodland Rise, Lydney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Feb 2025 at 16:29.

Gloucestershire County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
New Road

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on New Road, Whitecroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 6 Feb 2025 at 15:32.

Bristol Waterworks Company logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Morton Street

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Morton Street, Thornbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 17 Feb 2025 at 11:25.

Wales And West Utilities logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
May Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 Dec 2024 at 10:28.

Wales And West Utilities logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
May Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 Dec 2024 at 15:02.

Gloucestershire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Driffield Road

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Driffield Road, Lydney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 8 Oct 2024 at 11:50.

Gigaclear logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Mule Street

Gigaclear were proposing to carry out Utility asset works on Mule Street, Woodford, Berkeley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 24 Dec 2024 at 14:11.

Nexfibre Networks Limited logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cam Footpath 53

Nexfibre Networks Limited are proposing to carry out Utility asset works on Cam Footpath 53, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footpath only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:53.

Nexfibre Networks Limited logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cam Footpath 53

Nexfibre Networks Limited are proposing to carry out Utility asset works on Cam Footpath 53, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footpath only.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:13.

Gloucestershire County Council logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
500046 Pleasant View

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on 500046 Pleasant View, Blakeney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 12 Dec 2024 at 15:55.

Nexfibre Networks Limited logo
Between
18 and 28 Mar 2025
Details
View Map
Share
Follow
Marment Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Marment Road, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:48.

Nexfibre Networks Limited logo
Between
18 and 28 Mar 2025
Details
View Map
Share
Follow
Marment Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Marment Road, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:32.

Gloucestershire County Council logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
500046 Pleasant View

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on 500046 Pleasant View, Blakeney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 24 Dec 2024 at 13:04.

Nexfibre Networks Limited logo
Between
18 and 31 Mar 2025
Details
View Map
Share
Follow
Rosebery Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Rosebery Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:49.

Nexfibre Networks Limited logo
Between
18 and 31 Mar 2025
Details
View Map
Share
Follow
Rosebery Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Rosebery Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:27.

Nexfibre Networks Limited logo
Between
21 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Knapp Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Knapp Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Jan 2025 at 07:48.

Nexfibre Networks Limited logo
Between
21 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Woodend Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Woodend Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:42.

Nexfibre Networks Limited logo
Between
21 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Woodend Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Woodend Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:57.

Nexfibre Networks Limited logo
Between
21 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Knapp Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Knapp Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:03.

Severn Trent Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Jubilee Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Jubilee Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Dec 2024 at 08:30.

Severn Trent Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Jubilee Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Jubilee Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 31 Dec 2024 at 10:07.

Nexfibre Networks Limited logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Kingshill Park

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingshill Park, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:34.

Nexfibre Networks Limited logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Kingshill Park

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingshill Park, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Jan 2025 at 07:45.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:42.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Kingsdown

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingsdown, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:38.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Kingsdown

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingsdown, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:51.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:48.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:15.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway Adjoining 109 To 115 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 109 To 115 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:36.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway Adjoining 109 To 115 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 109 To 115 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:29.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:28.

Severn Trent Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Oldcroft Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oldcroft Road, Oldcroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 16:28.

Severn Trent Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Oldcroft Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oldcroft Road, Oldcroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 16:23.

Gigaclear logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
New Road

Gigaclear are proposing to carry out Remedial works on New Road, Blakeney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 29 Jan 2025 at 11:52.

Gigaclear logo
Between
14 and 22 Apr 2025
Details
View Map
Share
Follow
Field Lane

Gigaclear are proposing to carry out Utility asset works on Field Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 23 Jan 2025 at 14:36.

Gigaclear logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
New Road

Gigaclear are proposing to carry out Remedial works on New Road, Blakeney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 10 Feb 2025 at 16:14.

Severn Trent Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Etloe Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Etloe Road, Blakeney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Feb 2025 at 17:05.

Gigaclear logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Clapton Road

Gigaclear are proposing to carry out Utility asset works on Clapton Road, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 15 Feb 2025 at 07:54.

Gigaclear logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Damery Lane

Gigaclear were proposing to carry out Utility asset works on Damery Lane, Woodford, Berkeley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 31 Jan 2025 at 15:15.

South Gloucestershire Council logo
LONG TERM
Between
3 May and 2 Oct 2025
Details
View Map
Share
Follow
Little Bristol Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Little Bristol Lane, Charfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 24 Jan 2025 at 10:50.


Roadworks Map near to Jenner Court, BERKELEY, GL13 9BT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Feb 2025 16:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Jenner Court, BERKELEY, GL13 9BT (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
CANONBURY STREET 
(0.3 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Two-way signals
Cancelled
(Scheduled: 18 Feb 2025 - 19 Feb 2025)
0.3
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.