ROADWORKS SUMMARY
Kipling Road, DURSLEY, GL11 4QB
Introduction
View current and future planned roadworks and road closures for Kipling Road, GL11 4QB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Kipling Road, DURSLEY, GL11 4QB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kipling Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
4 Sep 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Farm To Railway Underpass, Stanley Downton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 13:00 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 14:35.
25 Nov 2024 and 29 Aug 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Farm To Railway Underpass, Stanley Downton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 12:43.
4 Sep 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Greenstyles To Bath Road Leonard Stanley, Stanley Downton, Stonehouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 17:00 and could run through until 4 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 2 Dec 2024 at 08:38.
25 Nov 2024 and 29 Aug 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Road To Downton Farm, Stanley Downton, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:03.
25 Nov 2024 and 29 Aug 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Greenstyles To Bath Road Leonard Stanley, Stanley Downton, Stonehouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:03.
29 Aug 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Road To Downton Farm, Stanley Downton, Stonehouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 13:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 14:13.
6 Jan and 4 Jul 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road To Coombe Road, Bowcott, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 11 Sep 2024 at 13:59.
4 Jul 2025
Gloucestershire County Council are carrying out Highway improvement works on Old London Road To Coombe Road, Bowcott, Wotton-under-edge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 00:00 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Jan 2025 at 11:54.
6 Jan and 13 Jun 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 8 Aug 2024 at 16:05.
6 Jan and 13 Jun 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 28 Aug 2024 at 16:54.
6 Jan and 4 Jul 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 11 Sep 2024 at 14:25.
4 Jul 2025
Gloucestershire County Council are carrying out Highway improvement works on Old London Road, Wotton-under-edge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 00:00 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Jan 2025 at 11:54.
6 Jan and 13 Jun 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Whiteway Hill To Old London Road, Bowcott, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 8 Aug 2024 at 16:10.
6 Jan and 13 Jun 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Whiteway Hill To Old London Road, Bowcott, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 28 Aug 2024 at 16:49.
6 Jan and 4 Jul 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Whiteway Hill To Old London Road, Bowcott, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 11 Sep 2024 at 14:10.
4 Jul 2025
Gloucestershire County Council are carrying out Highway improvement works on Whiteway Hill To Old London Road, Bowcott, Wotton-under-edge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 00:00 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Jan 2025 at 11:54.
6 Jan and 13 Jun 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road To Coombe Road, Bowcott, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 28 Aug 2024 at 10:11.
6 Jan and 13 Jun 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road To Coombe Road, Bowcott, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 28 Aug 2024 at 16:49.
Tomorrow
Nexfibre Networks Limited are carrying out Utility asset works on A4135 From Slimbridge Crossroads To Draycott Cam, Cam.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 20:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 27 Jan 2025 at 13:04.
Tomorrow
Nexfibre Networks Limited are carrying out Utility asset works on A38 Slimbridge Crossroads, Slimbridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 20:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 24 Jan 2025 at 10:58.
Today
Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on A46 District Boundary To Calcot Crossroads, Calcot, Kingscote.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 23 Jan 2025 at 08:44.
27 Jan and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Uley Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 13:55.
Wednesday
Gloucestershire County Council are proposing to carry out Highway improvement works on Riddle Street To Slimbridge Lane, Halmore, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:09.
Wednesday
Gloucestershire County Council are carrying out Highway improvement works on Riddle Street To Slimbridge Lane, Halmore, Berkeley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 09:15 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 28 Jan 2025 at 09:17.
Today
Gigaclear were proposing to carry out Utility asset works on Shortwood Road, Nailsworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 07:51.
Today
Gigaclear are proposing to carry out Utility asset works on Shortwood Road, Nailsworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gigaclear on 5 Nov 2024 at 10:39.
3 and 14 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Church Road, Leonard Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 27 Nov 2024 at 11:54.
3 and 14 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Church Road, Leonard Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 10:00.
Wednesday
Gigaclear were proposing to carry out Utility asset works on Ashmead, Cam.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 14:45.
3 Feb and 4 Jul 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Little Bristol Lane, Charfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 29 Jan 2025 at 07:11.
11 and 13 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Old Town, Wotton-under-edge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 13:33.
14 and 17 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 18 Dec 2024 at 13:46.
17 and 24 Feb 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Badgers Way, Nailsworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway only.
This roadwork event was last updated by Gloucestershire County Council on 18 Dec 2024 at 11:38.
17 and 24 Feb 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Badgers Way, Nailsworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway only.
This roadwork event was last updated by Gloucestershire County Council on 18 Dec 2024 at 11:31.
17 and 27 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Potters Pond, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Nov 2024 at 12:39.
17 and 27 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Potters Pond, Wotton-under-edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Jan 2025 at 08:01.
17 and 28 Feb 2025
Severn Trent Water were proposing to carry out Utility asset works on Uley Road, Dursley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 14:03.
18 and 21 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on May Lane, Dursley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 08:49.
18 and 20 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Old Town, Wotton-under-edge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 12:18.
21 and 25 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Woodford, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.
21 and 25 Feb 2025
Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Stone, Berkeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.
7 and 10 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 20 Dec 2024 at 10:28.
7 and 10 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 20 Dec 2024 at 15:02.
12 and 14 Mar 2025
Gigaclear were proposing to carry out Utility asset works on Higher Newmarket Road, Nailsworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 13 Jan 2025 at 13:54.
17 Mar and 16 May 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Downend, Horsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gloucestershire County Council on 6 Jan 2025 at 13:53.
17 Mar and 16 May 2025
Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Downend, Horsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gloucestershire County Council on 9 Jan 2025 at 11:53.
17 and 21 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Cam Footpath 53, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footpath only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:13.
17 and 21 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Cam Footpath 53, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footpath only.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:53.
17 and 19 Mar 2025
Gigaclear were proposing to carry out Utility asset works on Mule Street, Woodford, Berkeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 24 Dec 2024 at 14:11.
18 and 31 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Rosebery Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:49.
18 and 31 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Rosebery Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:27.
18 and 28 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Marment Road, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:48.
18 and 28 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Marment Road, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:32.
21 Mar and 3 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Woodend Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:42.
21 Mar and 3 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Woodend Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:57.
21 Mar and 3 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Knapp Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 10 Jan 2025 at 07:48.
21 Mar and 3 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Knapp Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:03.
24 and 27 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Jubilee Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Dec 2024 at 08:30.
24 and 27 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Jubilee Road, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 31 Dec 2024 at 10:07.
24 Mar and 4 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingshill Park, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:34.
24 Mar and 4 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingshill Park, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 10 Jan 2025 at 07:45.
31 Mar and 23 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bath Road, Leonard Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 28 Jan 2025 at 16:27.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:42.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:48.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:15.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 109 To 115 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:36.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 109 To 115 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:29.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingsdown, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:38.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:28.
31 Mar and 11 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingsdown, Dursley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:51.
14 and 22 Apr 2025
Gigaclear are proposing to carry out Utility asset works on Field Lane, Cam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 23 Jan 2025 at 14:36.
21 and 23 Apr 2025
Severn Trent Water are proposing to carry out New service connection on Church Road, Leonard Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 20 Jan 2025 at 09:14.
Roadworks Map near to Kipling Road, DURSLEY, GL11 4QB (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Kipling Road, DURSLEY, GL11 4QB (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 Jan 2025 - 3 Feb 2025)
(Scheduled: 30 Jan 2025 - 3 Feb 2025)
(Scheduled: 4 May 2023 - 10 Feb 2025)
(Scheduled: 30 Jan 2025 - 3 Feb 2025)