ROADWORKS SUMMARY
Somerset Avenue, DURSLEY, GL11 4PY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Somerset Avenue, GL11 4PY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Somerset Avenue, DURSLEY, GL11 4PY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Somerset Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wales And West Utilities logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Downton Road To Downton Farm

Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Road To Downton Farm, Stanley Downton, Stonehouse.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 13:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 14:13.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Downton Road To Downton Farm

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Road To Downton Farm, Stanley Downton, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:03.

Wales And West Utilities logo
LONG TERM
Until
4 Sep 2025
Details
View Map
Share
Follow
Downton Farm To Railway Underpass

Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Farm To Railway Underpass, Stanley Downton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 13:00 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 14:35.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Downton Farm To Railway Underpass

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Farm To Railway Underpass, Stanley Downton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 12:43.

Wales And West Utilities logo
LONG TERM
Until
4 Sep 2025
Details
View Map
Share
Follow
Greenstyles To Bath Road Leonard Stanley

Wales And West Utilities are carrying out Utility repair and maintenance works on Greenstyles To Bath Road Leonard Stanley, Stanley Downton, Stonehouse.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 17:00 and could run through until 4 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 2 Dec 2024 at 08:38.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Greenstyles To Bath Road Leonard Stanley

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Greenstyles To Bath Road Leonard Stanley, Stanley Downton, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:03.

Gloucestershire County Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Whiteway Hill To Old London Road

Gloucestershire County Council are carrying out Highway improvement works on Whiteway Hill To Old London Road, Bowcott, Wotton-under-edge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 00:00 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Jan 2025 at 11:54.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Old London Road To Coombe Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road To Coombe Road, Bowcott, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Aug 2024 at 16:49.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Old London Road To Coombe Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road To Coombe Road, Bowcott, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Aug 2024 at 10:11.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 4 Jul 2025
Details
View Map
Share
Follow
Whiteway Hill To Old London Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Whiteway Hill To Old London Road, Bowcott, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Sep 2024 at 14:10.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Whiteway Hill To Old London Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Whiteway Hill To Old London Road, Bowcott, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Aug 2024 at 16:49.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Whiteway Hill To Old London Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Whiteway Hill To Old London Road, Bowcott, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 8 Aug 2024 at 16:10.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 4 Jul 2025
Details
View Map
Share
Follow
Old London Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Sep 2024 at 14:25.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Old London Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Aug 2024 at 16:54.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Old London Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 8 Aug 2024 at 16:05.

Gloucestershire County Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Old London Road To Coombe Road

Gloucestershire County Council are carrying out Highway improvement works on Old London Road To Coombe Road, Bowcott, Wotton-under-edge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 00:00 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Jan 2025 at 11:54.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 4 Jul 2025
Details
View Map
Share
Follow
Old London Road To Coombe Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Old London Road To Coombe Road, Bowcott, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Sep 2024 at 13:59.

Gloucestershire County Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Old London Road

Gloucestershire County Council are carrying out Highway improvement works on Old London Road, Wotton-under-edge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 00:00 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Jan 2025 at 11:54.

Nexfibre Networks Limited logo
Finishing
Tomorrow
Details
View Map
Share
Follow
A4135 From Slimbridge Crossroads To Draycott Cam

Nexfibre Networks Limited are carrying out Utility asset works on A4135 From Slimbridge Crossroads To Draycott Cam, Cam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 20:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 27 Jan 2025 at 13:04.

Nexfibre Networks Limited logo
Finishing
Tomorrow
Details
View Map
Share
Follow
A38 Slimbridge Crossroads

Nexfibre Networks Limited are carrying out Utility asset works on A38 Slimbridge Crossroads, Slimbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 20:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Jan 2025 at 10:58.

Severn Trent Water logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Uley Road

Severn Trent Water are proposing to carry out Utility asset works on Uley Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 13:55.

Gloucestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Riddle Street To Slimbridge Lane

Gloucestershire County Council are carrying out Highway improvement works on Riddle Street To Slimbridge Lane, Halmore, Berkeley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 09:15 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Jan 2025 at 09:17.

Gloucestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Riddle Street To Slimbridge Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Riddle Street To Slimbridge Lane, Halmore, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 10:09.

Gigaclear logo
Finishing
Today
Details
View Map
Share
Shortwood Road

Gigaclear were proposing to carry out Utility asset works on Shortwood Road, Nailsworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 07:51.

Gigaclear logo
Finishing
Today
Details
View Map
Share
Follow
Shortwood Road

Gigaclear are proposing to carry out Utility asset works on Shortwood Road, Nailsworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 5 Nov 2024 at 10:39.

Nexfibre Networks Limited logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Church Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Church Road, Leonard Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 27 Nov 2024 at 11:54.

Nexfibre Networks Limited logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Church Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Church Road, Leonard Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 10:00.

Gigaclear logo
Finishing
Wednesday
Details
View Map
Share
Ashmead

Gigaclear were proposing to carry out Utility asset works on Ashmead, Cam.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 14:45.

South Gloucestershire Council logo
LONG TERM
Between
3 Feb and 4 Jul 2025
Details
View Map
Share
Follow
Little Bristol Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Little Bristol Lane, Charfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 29 Jan 2025 at 07:11.

Gloucestershire County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Road From High Street Berkeley To Ham

Gloucestershire County Council are proposing to carry out Highway improvement works on Road From High Street Berkeley To Ham, Ham, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 15:10.

Gloucestershire County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Gloucestershire County Council are proposing to carry out Highway improvement works on High Street, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Jan 2025 at 09:22.

Gloucestershire County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Gloucestershire County Council are proposing to carry out Highway improvement works on High Street, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 14:28.

Gloucestershire County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Road From High Street Berkeley To Ham

Gloucestershire County Council are proposing to carry out Highway improvement works on Road From High Street Berkeley To Ham, Ham, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Jan 2025 at 09:22.

Severn Trent Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Old Town

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Old Town, Wotton-under-edge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 13:33.

Wales And West Utilities logo
Between
14 and 17 Feb 2025
Details
View Map
Share
Follow
May Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 18 Dec 2024 at 13:46.

Western Power Distribution (West Midlands) logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Potters Pond

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Potters Pond, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Nov 2024 at 12:39.

Severn Trent Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Uley Road

Severn Trent Water were proposing to carry out Utility asset works on Uley Road, Dursley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 14:03.

Western Power Distribution (West Midlands) logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Potters Pond

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Potters Pond, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Jan 2025 at 08:01.

Severn Trent Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
May Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on May Lane, Dursley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 08:49.

Severn Trent Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Old Town

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Old Town, Wotton-under-edge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 12:18.

Gloucestershire County Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Damery Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Woodford, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.

Gloucestershire County Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Damery Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Damery Lane, Stone, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.

Gloucestershire County Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Gloucester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Gloucester Road, Stone, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:40.

Wales And West Utilities logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
May Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 Dec 2024 at 15:02.

Wales And West Utilities logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
May Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on May Lane, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 Dec 2024 at 10:28.

Nexfibre Networks Limited logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cam Footpath 53

Nexfibre Networks Limited are proposing to carry out Utility asset works on Cam Footpath 53, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footpath only.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:13.

Nexfibre Networks Limited logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cam Footpath 53

Nexfibre Networks Limited are proposing to carry out Utility asset works on Cam Footpath 53, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footpath only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:53.

Gigaclear logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Mule Street

Gigaclear were proposing to carry out Utility asset works on Mule Street, Woodford, Berkeley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 24 Dec 2024 at 14:11.

Nexfibre Networks Limited logo
Between
18 and 28 Mar 2025
Details
View Map
Share
Follow
Marment Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Marment Road, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:32.

Nexfibre Networks Limited logo
Between
18 and 31 Mar 2025
Details
View Map
Share
Follow
Rosebery Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Rosebery Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:27.

Nexfibre Networks Limited logo
Between
18 and 31 Mar 2025
Details
View Map
Share
Follow
Rosebery Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Rosebery Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:49.

Nexfibre Networks Limited logo
Between
18 and 28 Mar 2025
Details
View Map
Share
Follow
Marment Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Marment Road, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:48.

Nexfibre Networks Limited logo
Between
21 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Woodend Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Woodend Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:42.

Nexfibre Networks Limited logo
Between
21 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Woodend Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Woodend Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:57.

Nexfibre Networks Limited logo
Between
21 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Knapp Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Knapp Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Jan 2025 at 07:48.

Nexfibre Networks Limited logo
Between
21 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Knapp Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Knapp Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:03.

Severn Trent Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Jubilee Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Jubilee Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Dec 2024 at 08:30.

Severn Trent Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Jubilee Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Jubilee Road, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 31 Dec 2024 at 10:07.

Nexfibre Networks Limited logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Kingshill Park

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingshill Park, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:34.

Nexfibre Networks Limited logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Kingshill Park

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingshill Park, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Jan 2025 at 07:45.

Wales And West Utilities logo
LONG TERM
Between
31 Mar and 23 May 2025
Details
View Map
Share
Follow
Bath Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bath Road, Leonard Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 28 Jan 2025 at 16:27.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:42.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:48.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Draycott Crescent To Draycott Adjoining 93 To 95 Odds And 109 To 127 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:15.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway Adjoining 109 To 115 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 109 To 115 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:36.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway Adjoining 109 To 115 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 109 To 115 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:29.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Kingsdown

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingsdown, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 08:38.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway North Of 81 To 91 Odds Draycatt And Adjoining 97 To 107 Odds Draycott, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Dec 2024 at 09:28.

Nexfibre Networks Limited logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Kingsdown

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingsdown, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Jan 2025 at 12:51.

Gigaclear logo
Between
14 and 22 Apr 2025
Details
View Map
Share
Follow
Field Lane

Gigaclear are proposing to carry out Utility asset works on Field Lane, Cam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 23 Jan 2025 at 14:36.

Severn Trent Water logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Church Road

Severn Trent Water are proposing to carry out New service connection on Church Road, Leonard Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Jan 2025 at 09:14.


Roadworks Map near to Somerset Avenue, DURSLEY, GL11 4PY (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 30 Jan 2025 23:22
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Somerset Avenue, DURSLEY, GL11 4PY (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nexfibre Networks Limited logo
WOODMANCOTE 
(0.2 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Give and take
In Progress
Since: 30 Jan 2025 16:04
(Scheduled: 30 Jan 2025 - 3 Feb 2025)
0.2
Details
Share
Follow
2
Nexfibre Networks Limited logo
ULEY ROAD 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 30 Jan 2025 - 3 Feb 2025
0.3
Details
Share
Follow
3
Severn Trent Water logo
YELLOW HUNDRED CLOSE 
(0.3 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 30 Jan 2025
0.3
Details
Share
Follow
4
BT logo
URGENT
  
HARDINGS DRIVE 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 30 Jan 2025 13:16
(Scheduled: 30 Jan 2025 - 3 Feb 2025)
0.7
Details
Share
Follow
5
BT logo
URGENT
  
TORCHACRE RISE 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 30 Jan 2025 14:41
(Scheduled: 30 Jan 2025 - 3 Feb 2025)
0.7
Details
Share
Follow
6
Severn Trent Water logo
MAJOR
  
ULEY ROAD 
(0.9 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 27 Jan 2025 - 7 Feb 2025
0.9
Details
Share
Follow
7
Gloucestershire County Council logo
URGENT
  
ULEY ROAD 
(0.9 miles)
Gloucestershire County Council
Highway repair and maintenance works - Carriageway - Give and take
In Progress
Since: 4 May 2023 08:30
(Scheduled: 4 May 2023 - 10 Feb 2025)
0.9
Details
Share
Follow
8
Gigaclear logo
DRAKE LANE 
(0.9 miles)
Gigaclear
Utility asset works - Verge - Give and take
Planned
Scheduled: 31 Jan 2025 - 4 Feb 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.