ROADWORKS SUMMARY
Newfield Lane, GLASGOW, G71 8JU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Newfield Lane, G71 8JU and the surrounding area.

Our Scottish roadwork details are updated daily and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Newfield Lane, GLASGOW, G71 8JU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Newfield Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Until
6 Jun 2024
Details
View Map
Share
Follow
Opp 71 To Junction With Barra Place

SP Energy Networks (formerly Scottish Power) are carrying out roadworks on Opp 71 To Junction With Barra Place.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2024 at 23:00 and could run through until 6 June 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 18 Apr 2024 at 06:36.

SP Energy Networks (formerly Scottish Power) logo
Finishing
Friday
Details
View Map
Share
Follow
Junction At Westburn Road And Old Mill Road

SP Energy Networks (formerly Scottish Power) are carrying out roadworks on Junction At Westburn Road And Old Mill Road.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2024 at 23:00 and could run through until 3 May 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 18 Apr 2024 at 15:05.

Transport Scotland logo
Finishing
Friday
Details
View Map
Share
Follow
Motherwell Road

Transport Scotland are carrying out roadworks on Motherwell Road.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 April 2024 at 18:43 and could run through until 3 May 2024. The works will impact the not yet available only.

This roadwork event was last updated by Transport Scotland on 19 Apr 2024 at 07:57.

Transport Scotland logo
Finishing
Friday
Details
View Map
Share
Follow
Motherwell Road

Transport Scotland are carrying out roadworks on Motherwell Road.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 April 2024 at 18:43 and could run through until 3 May 2024. The works will impact the not yet available only.

This roadwork event was last updated by Transport Scotland on 19 Apr 2024 at 07:56.

Network Rail logo
Between
19 Apr and 11 May 2024
Details
View Map
Share
Follow
Railway Bridge At Junction With Glasgow Road.

Network Rail are proposing to carry out roadworks on Railway Bridge At Junction With Glasgow Road..

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 11 May 2024. The works will impact the not yet available only.

This roadwork event was last updated by Network Rail on 18 Apr 2024 at 10:12.

Network Rail logo
Between
19 Apr and 11 May 2024
Details
View Map
Share
Follow
Railway Bridge At Junction With Beech Avenue.

Network Rail are proposing to carry out roadworks on Railway Bridge At Junction With Beech Avenue..

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 11 May 2024. The works will impact the not yet available only.

This roadwork event was last updated by Network Rail on 18 Apr 2024 at 10:08.

North Lanarkshire Council logo
LONG TERM
Between
4 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Section Of Paddock Street

North Lanarkshire Council are proposing to carry out roadworks on Section Of Paddock Street.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 20 August 2024. The works will impact the not yet available only.

This roadwork event was last updated by North Lanarkshire Council on 4 Apr 2024 at 09:01.

SP Energy Networks (formerly Scottish Power) logo
Between
8 and 23 Jul 2024
Details
View Map
Share
Follow
O/s Peugeot Garage

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on O/s Peugeot Garage.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 23 July 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 9 Apr 2024 at 14:19.

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Between
10 Jul and 7 Oct 2024
Details
View Map
Share
Follow
Junction Of Retail Park - Glasgow Road

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on Junction Of Retail Park - Glasgow Road.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 7 October 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 18 Apr 2024 at 08:00.

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Between
10 Jul and 7 Oct 2024
Details
View Map
Share
Follow
O/s S/s

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on O/s S/s.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 7 October 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 18 Apr 2024 at 08:06.

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Between
10 Jul and 7 Oct 2024
Details
View Map
Share
Follow
Junction Of Retail Park - Glasgow Road

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on Junction Of Retail Park - Glasgow Road.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 7 October 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 11 Apr 2024 at 13:57.

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Between
10 Jul and 7 Oct 2024
Details
View Map
Share
Follow
Junction Of A79 - S/s

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on Junction Of A79 - S/s.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 7 October 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 11 Apr 2024 at 14:00.

SP Energy Networks (formerly Scottish Power) logo
Between
14 and 25 Jul 2024
Details
View Map
Share
Follow
O/s 45-51

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on O/s 45-51.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 25 July 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 10 Apr 2024 at 11:29.

Transport Scotland logo
Between
15 and 28 Jul 2024
Details
View Map
Share
Follow
A725 Eb Douglas St On Slip

Transport Scotland are proposing to carry out roadworks on A725 Eb Douglas St On Slip.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 28 July 2024. The works will impact the not yet available only.

This roadwork event was last updated by Transport Scotland on 19 Apr 2024 at 13:54.

SGN logo
LONG TERM
Between
16 Jul 2024 and 30 Mar 2025
Details
View Map
Share
O/s South Hamilton Church To O/s 7 Strathaven Road Plus Road Crossing

SGN were proposing to carry out roadworks on O/s South Hamilton Church To O/s 7 Strathaven Road Plus Road Crossing.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 July 2024 and run through until 30 March 2025. The works were due to impact the not yet available only.

This roadwork event was last updated by SGN on 19 Apr 2024 at 09:54.

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Between
18 Jul and 28 Aug 2024
Details
View Map
Share
Follow
O/s 2 To Auchinraith Rd

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on O/s 2 To Auchinraith Rd.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 28 August 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 19 Apr 2024 at 11:12.

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Between
18 Jul and 28 Aug 2024
Details
View Map
Share
Follow
O/s 150 Parkville Drive

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on O/s 150 Parkville Drive .

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 28 August 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 19 Apr 2024 at 11:12.

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Between
18 Jul and 28 Aug 2024
Details
View Map
Share
Follow
O/s 125 To Birdsfield Drive

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on O/s 125 To Birdsfield Drive .

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 28 August 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 19 Apr 2024 at 11:11.

SP Energy Networks (formerly Scottish Power) logo
Between
18 Jul and 7 Aug 2024
Details
View Map
Share
Follow
O/s S/s

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on O/s S/s.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 7 August 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 19 Apr 2024 at 14:25.

SP Energy Networks (formerly Scottish Power) logo
LONG TERM
Between
18 Jul and 28 Aug 2024
Details
View Map
Share
Follow
At Birdsfield Drive Junction To Cover Tm

SP Energy Networks (formerly Scottish Power) are proposing to carry out roadworks on At Birdsfield Drive Junction To Cover Tm .

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 28 August 2024. The works will impact the not yet available only.

This roadwork event was last updated by SP Energy Networks (formerly Scottish Power) on 19 Apr 2024 at 11:12.

Scottish Water logo
Between
21 and 23 Jul 2024
Details
View Map
Share
Follow
The Junction With Glen View

Scottish Water are proposing to carry out roadworks on The Junction With Glen View.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 23 July 2024. The works will impact the not yet available only.

This roadwork event was last updated by Scottish Water on 21 Apr 2024 at 19:18.


Roadworks Map near to Newfield Lane, GLASGOW, G71 8JU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Apr 2024 22:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Newfield Lane, GLASGOW, G71 8JU (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
SP Energy Networks (formerly Scottish Power) logo
O/S 152 
(1.0 miles)
SP Energy Networks (formerly Scottish Power)
No carriageway incursion
Planned
Scheduled: 22 Apr 2024 - 5 May 2024
1.0
Details
Share
Follow