ROADWORKS SUMMARY
Fylde Court, POULTON-LE-FYLDE, FY6 0BD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fylde Court, FY6 0BD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fylde Court, POULTON-LE-FYLDE, FY6 0BD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fylde Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
25 Aug and 8 Oct 2025
Details
View Map
Share
Follow
Victoria Road East

Cadent Gas are proposing to carry out Utility asset works on Victoria Road East, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 10:46.

Cadent Gas logo
LONG TERM
Between
25 Aug and 8 Oct 2025
Details
View Map
Share
Follow
Victoria Road East

Cadent Gas are proposing to carry out Utility asset works on Victoria Road East, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 11:31.

Cadent Gas logo
LONG TERM
Between
25 Aug and 8 Oct 2025
Details
View Map
Share
Follow
Victoria Road East

Cadent Gas are proposing to carry out Utility asset works on Victoria Road East, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 15:46.

Cadent Gas logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Victoria Road East

Cadent Gas are carrying out Utility asset works on Victoria Road East, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 10:30 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 10:42.

Electricity North West (NorWeb) logo
Finishing
Friday
Details
View Map
Share
Follow
Hargate Road

Electricity North West (NorWeb) are carrying out Diversionary works on Hargate Road, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 11:20.

Cadent Gas logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Sevenoaks Drive

Cadent Gas are carrying out Utility asset works on Sevenoaks Drive, Blackpool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 12:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 15:50.

Blackpool Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Broadhurst Road

Blackpool Borough Council are proposing to carry out Highway repair and maintenance works on Broadhurst Road, Blackpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackpool Borough Council on 27 Aug 2025 at 13:59.

Blackpool Borough Council logo
Finishing
Friday
Details
View Map
Share
Epsom Road

Blackpool Borough Council were proposing to carry out Highway repair and maintenance works on Epsom Road, Blackpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Blackpool Borough Council on 10 Sep 2025 at 10:48.

Blackpool Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Epsom Road

Blackpool Borough Council are proposing to carry out Highway repair and maintenance works on Epsom Road, Blackpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackpool Borough Council on 27 Aug 2025 at 14:24.

Blackpool Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Greenfield Road

Blackpool Borough Council are proposing to carry out Highway repair and maintenance works on Greenfield Road, Blackpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackpool Borough Council on 27 Aug 2025 at 14:10.

Blackpool Borough Council logo
Finishing
Friday
Details
View Map
Share
Broadhurst Road

Blackpool Borough Council were proposing to carry out Highway repair and maintenance works on Broadhurst Road, Blackpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Blackpool Borough Council on 10 Sep 2025 at 10:49.

Cadent Gas logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Thornton Gate

Cadent Gas are proposing to carry out Utility asset works on Thornton Gate, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 14:15.

Cadent Gas logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Thornton Gate

Cadent Gas are proposing to carry out Utility asset works on Thornton Gate, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 14:30.

Cadent Gas logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Carr Gate

Cadent Gas are proposing to carry out Utility asset works on Carr Gate, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 14:15.

Cadent Gas logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Carr Gate

Cadent Gas are proposing to carry out Utility asset works on Carr Gate, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 14:30.

Cadent Gas logo
Between
29 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 08:34.

Cadent Gas logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out New service connection on Back Lane, Stalmine-with-staynall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 10:48.

Lancashire County Council logo
Between
8 and 24 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Thornton Cleveleys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 17 Jul 2025 at 12:06.

Cadent Gas logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Carr Gate

Cadent Gas are proposing to carry out Utility asset works on Carr Gate, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 16:12.

Cadent Gas logo
LONG TERM
Between
13 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Victoria Road East

Cadent Gas are proposing to carry out Utility asset works on Victoria Road East, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 13:29.

Cadent Gas logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Thornton Gate

Cadent Gas are proposing to carry out Utility asset works on Thornton Gate, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 16:14.

Cadent Gas logo
LONG TERM
Between
13 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Victoria Road East

Cadent Gas are proposing to carry out Utility asset works on Victoria Road East, Thornton Cleveleys.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 16:05.

Cadent Gas logo
LONG TERM
Between
13 Oct and 12 Nov 2025
Details
View Map
Share
Sunderland Avenue

Cadent Gas were proposing to carry out Utility asset works on Sunderland Avenue, Thornton Cleveleys.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 11:39.

Cadent Gas logo
Between
13 and 29 Oct 2025
Details
View Map
Share
Cheviot Avenue

Cadent Gas were proposing to carry out Utility asset works on Cheviot Avenue, Thornton Cleveleys.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 11:39.

Cadent Gas logo
Between
13 and 29 Oct 2025
Details
View Map
Share
Newcastle Avenue

Cadent Gas were proposing to carry out Utility asset works on Newcastle Avenue, Thornton Cleveleys.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 11:34.

Cadent Gas logo
LONG TERM
Between
13 Oct and 24 Dec 2025
Details
View Map
Share
Northumberland Avenue

Cadent Gas were proposing to carry out Utility asset works on Northumberland Avenue, Thornton Cleveleys.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 24 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 11:37.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Ashfield Road

Cadent Gas are proposing to carry out Utility asset works on Ashfield Road, Blackpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 14:43.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Allandale Avenue

Cadent Gas were proposing to carry out Utility asset works on Allandale Avenue, Thornton Cleveleys.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 26 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 12:13.

Electricity North West (NorWeb) logo
Between
11 and 17 Nov 2025
Details
View Map
Share
Follow
Staynall Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Staynall Lane, Stalmine-with-staynall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Aug 2025 at 09:34.

United Utilities Water (formerly North West Water) logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Back Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Back Lane, Out Rawcliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Aug 2025 at 15:49.

Cadent Gas logo
Between
1 and 17 Dec 2025
Details
View Map
Share
Cumberland Avenue

Cadent Gas were proposing to carry out Utility asset works on Cumberland Avenue, Thornton Cleveleys.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 17 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 12:16.

T-Mobile (UK) logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Station Road

T-Mobile (UK) are proposing to carry out Utility asset works on Station Road, Fleetwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 19 Sep 2025 at 16:08.

Cadent Gas logo
Between
8 and 24 Dec 2025
Details
View Map
Share
Ingleway

Cadent Gas were proposing to carry out Utility asset works on Ingleway, Thornton Cleveleys.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 24 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 12:17.


Roadworks Map near to Fylde Court, POULTON-LE-FYLDE, FY6 0BD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 23 Sep 2025 01:02
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fylde Court, POULTON-LE-FYLDE, FY6 0BD (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
AMBLESIDE AVENUE 
(0.6 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 23 Sep 2025 - 25 Sep 2025
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.