ROADWORKS SUMMARY
Broadway, THORNTON-CLEVELEYS, FY5 1HH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Broadway, FY5 1HH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Broadway, THORNTON-CLEVELEYS, FY5 1HH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Broadway are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Normoss Road

Cadent Gas are carrying out Utility asset works on Normoss Road, Poulton-le-fylde.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 10:34.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Normoss Road

Cadent Gas were proposing to carry out Utility asset works on Normoss Road, Poulton-le-fylde.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:59.

Lancashire County Council logo
LONG TERM
Until
3 Feb 2025
Details
View Map
Share
Follow
Moss Side Lane

Lancashire County Council are carrying out Highway repair and maintenance works on Moss Side Lane, Stalmine-with-staynall.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:10 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 14:13.

Cadent Gas logo
Between
14 Nov and 11 Dec 2024
Details
View Map
Share
Newton Drive East

Cadent Gas were proposing to carry out Utility asset works on Newton Drive East, Poulton-le-fylde.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 15:41.

United Utilities Water (formerly North West Water) logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Luton Road

United Utilities Water (formerly North West Water) are carrying out Permanent reinstatement on Luton Road, Blackpool.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 November 2024 at 09:27 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 14:50.

United Utilities Water (formerly North West Water) logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Bleasdale Avenue

United Utilities Water (formerly North West Water) are carrying out Permanent reinstatement on Bleasdale Avenue, Blackpool.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 November 2024 at 09:27 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 15:00.

Lancashire County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Sandy Lane

Lancashire County Council are proposing to carry out Section 50 on Sandy Lane, Hambleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 2 Nov 2024 at 10:19.

Lancashire County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Sandy Lane

Lancashire County Council are proposing to carry out Section 50 on Sandy Lane, Hambleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 2 Nov 2024 at 10:18.

Cadent Gas logo
LONG TERM
Between
26 Nov 2024 and 3 Jan 2025
Details
View Map
Share
General Street

Cadent Gas were proposing to carry out Utility asset works on General Street, Blackpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 08:57.

Lancashire County Council logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Hodder Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Hodder Avenue, Fleetwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 31 Aug 2024 at 14:27.

Cadent Gas logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Promenade

Cadent Gas were proposing to carry out Utility asset works on Promenade, Blackpool.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 08:58.

Cadent Gas logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Banks Street

Cadent Gas were proposing to carry out Utility asset works on Banks Street, Blackpool.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 08:58.

Lancashire County Council logo
Between
3 and 12 Dec 2024
Details
View Map
Share
Follow
Navena Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Navena Avenue, Fleetwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 7 Sep 2024 at 15:36.

Lancashire County Council logo
Between
3 and 12 Dec 2024
Details
View Map
Share
Follow
Toronto Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Toronto Avenue, Fleetwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 7 Sep 2024 at 15:40.

Cadent Gas logo
Between
4 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Tarnbrook Drive

Cadent Gas were proposing to carry out Utility asset works on Tarnbrook Drive, Blackpool.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:01.

Cadent Gas logo
LONG TERM
Between
4 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Newton Drive

Cadent Gas were proposing to carry out Utility asset works on Newton Drive, Blackpool.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:01.

Cadent Gas logo
Between
4 and 23 Dec 2024
Details
View Map
Share
Normoss Road

Cadent Gas were proposing to carry out Utility asset works on Normoss Road, Poulton-le-fylde.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:00.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Burned House Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Burned House Lane, Preesall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Oct 2024 at 16:13.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Springfield Road

Cadent Gas were proposing to carry out Utility asset works on Springfield Road, Blackpool.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 08:59.

Electricity North West (NorWeb) logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Aldon Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Aldon Road, Poulton-le-fylde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 2 Oct 2024 at 14:16.

Cadent Gas logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
General Street

Cadent Gas are proposing to carry out Utility asset works on General Street, Blackpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 12:06.

Electricity North West (NorWeb) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Aldon Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Aldon Road, Poulton-le-fylde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Oct 2024 at 12:17.

Electricity North West (NorWeb) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Aldon Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Aldon Road, Poulton-le-fylde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Nov 2024 at 12:13.

United Utilities Water (formerly North West Water) logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Burned House Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Burned House Lane, Preesall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 31 Oct 2024 at 14:38.

Electricity North West (NorWeb) logo
Between
20 Jan and 4 Feb 2025
Details
View Map
Share
Cocker Avenue

Electricity North West (NorWeb) were proposing to carry out New service connection on Cocker Avenue, Poulton-le-fylde.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 11:33.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Burned House Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Burned House Lane, Preesall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 31 Oct 2024 at 13:37.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Springfield Road

Cadent Gas are proposing to carry out Utility asset works on Springfield Road, Blackpool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:43.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Banks Street

Cadent Gas are proposing to carry out Utility asset works on Banks Street, Blackpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 11:56.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Promenade

Cadent Gas are proposing to carry out Utility asset works on Promenade, Blackpool.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:42.

Electricity North West (NorWeb) logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Staynall Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Staynall Lane, Stalmine-with-staynall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Nov 2024 at 14:30.

Lancashire County Council logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Cumberland Avenue, Thornton Cleveleys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 5 Nov 2024 at 09:30.

Electricity North West (NorWeb) logo
Between
5 and 14 Feb 2025
Details
View Map
Share
Follow
Furness Drive

Electricity North West (NorWeb) are proposing to carry out New service connection on Furness Drive, Poulton-le-fylde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 30 Oct 2024 at 15:25.

Electricity North West (NorWeb) logo
Between
5 and 17 Feb 2025
Details
View Map
Share
Follow
Back High Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Back High Street, Blackpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 08:40.

Electricity North West (NorWeb) logo
Between
5 and 17 Feb 2025
Details
View Map
Share
Follow
Back High Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Back High Street, Blackpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:17.

Electricity North West (NorWeb) logo
Between
5 and 17 Feb 2025
Details
View Map
Share
Follow
Back High Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Back High Street, Blackpool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Nov 2024 at 10:34.

Electricity North West (NorWeb) logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Clarke Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Clarke Street, Poulton-le-fylde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 30 Oct 2024 at 15:24.


Roadworks Map near to Broadway, THORNTON-CLEVELEYS, FY5 1HH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 23:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Broadway, THORNTON-CLEVELEYS, FY5 1HH (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
SHAFTESBURY AVENUE 
(0.1 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 21 Nov 2024 11:30
(Scheduled: 21 Nov 2024 - 4 Dec 2024)
0.1
Details
Share
Follow
2
United Utilities Water (formerly North West Water) logo
URGENT
  
WESTMORLAND AVENUE 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
25 Nov 2024 10:30 - 27 Nov 2024 14:14
0.4
Details
Share
3
United Utilities Water (formerly North West Water) logo
AINSDALE AVENUE 
(0.6 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 26 Nov 2024 09:23
(Scheduled: 26 Nov 2024 - 9 Dec 2024)
0.6
Details
Share
Follow
4
United Utilities Water (formerly North West Water) logo
ROCHESTER AVENUE 
(0.7 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 28 Nov 2024 - 11 Dec 2024
0.7
Details
Share
Follow
5
BT logo
ROSSALL GATE 
(0.7 miles)
BT
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.7
Details
Share
Follow
6
United Utilities Water (formerly North West Water) logo
BELFORD AVENUE 
(0.7 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 27 Nov 2024 - 10 Dec 2024
0.7
Details
Share
Follow
7
United Utilities Water (formerly North West Water) logo
BERWICK AVENUE 
(0.8 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 27 Nov 2024 - 10 Dec 2024
0.8
Details
Share
Follow
8
BT logo
WHITESIDE WAY 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.8
Details
Share
Follow
9
Electricity North West (NorWeb) logo
ORMONT AVENUE 
(1.0 miles)
Electricity North West (NorWeb)
New service connection - Footway - Give and take
In Progress
Since: 27 Nov 2024 11:34
(Scheduled: 27 Nov 2024 - 4 Dec 2024)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.