ROADWORKS SUMMARY
Alexandra Road, DAWLISH, EX7 9JT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Alexandra Road, EX7 9JT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Alexandra Road, DAWLISH, EX7 9JT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Alexandra Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Devon County Council logo
LONG TERM
Until
30 Jan 2026
Details
View Map
Share
Follow
Torquay Road

Devon County Council are carrying out Highway repair and maintenance works on Torquay Road, Shaldon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2024 at 08:00 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Apr 2025 at 13:44.

Devon County Council logo
LONG TERM
Until
28 Feb 2026
Details
View Map
Share
Follow
Moorfield Road

Devon County Council are carrying out Works for road purposes on Moorfield Road, Exmouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2024 at 00:00 and could run through until 28 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Devon County Council on 5 Sep 2024 at 09:51.

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
South View

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on South View, Teignmouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 14 Feb 2025 at 10:18.

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Den Crescent

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Den Crescent, Teignmouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 14 Feb 2025 at 10:18.

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Den Crescent

Wales And West Utilities are carrying out Utility repair and maintenance works on Den Crescent, Teignmouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:15 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 May 2025 at 08:43.

Wales And West Utilities logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Stockton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Stockton Road, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 4 Feb 2025 at 15:41.

South West Water logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Plantation Terrace

South West Water were proposing to carry out Utility repair and maintenance works on Plantation Terrace, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 20 Jan 2025 at 16:29.

Wales And West Utilities logo
LONG TERM
Between
6 May and 12 Jun 2025
Details
View Map
Share
Follow
Road Past Hoopern Terrace

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Road Past Hoopern Terrace, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Feb 2025 at 15:42.

Wales And West Utilities logo
LONG TERM
Between
6 May and 12 Jun 2025
Details
View Map
Share
Follow
Penfield Gardens

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Penfield Gardens, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Feb 2025 at 15:41.

Wales And West Utilities logo
LONG TERM
Between
6 May and 12 Jun 2025
Details
View Map
Share
Penfield Gardens

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Penfield Gardens, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 31 Jan 2025 at 14:27.

Wales And West Utilities logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Windward Lane

Wales And West Utilities are carrying out Utility repair and maintenance works on Windward Lane, Holcombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 May 2025 at 08:33.

Wales And West Utilities logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Courtenay Place

Wales And West Utilities are carrying out Utility repair and maintenance works on Courtenay Place, Teignmouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 12:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 20 May 2025 at 12:55.

Wales And West Utilities logo
LONG TERM
Between
19 May and 27 Jun 2025
Details
View Map
Share
Follow
Courtenay Place

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Courtenay Place, Teignmouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 20 Feb 2025 at 12:31.

Devon County Council logo
Finishing
Today
Details
View Map
Share
Maer Lane

Devon County Council were proposing to carry out Highway repair and maintenance works on Maer Lane, Littleham, Exmouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 15 May 2025 at 16:29.

Devon County Council logo
Finishing
Today
Details
View Map
Share
Maer Lane

Devon County Council were proposing to carry out Highway repair and maintenance works on Maer Lane, Exmouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 15 May 2025 at 16:29.

Wales And West Utilities logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Service Road For 100 To 190 Salterton Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Service Road For 100 To 190 Salterton Road, Exmouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 15:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Jun 2025 at 16:46.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Salterton Road

BT are carrying out Utility repair and maintenance works on Salterton Road, Exmouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 21:00 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Jun 2025 at 08:00.

Western Power Distribution (South West) logo
Finishing
Saturday
Details
View Map
Share
Follow
Claremont Grove

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Claremont Grove, Exmouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Feb 2025 at 17:02.

Wales And West Utilities logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Parade

Wales And West Utilities are carrying out Utility repair and maintenance works on Parade, Exmouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Jun 2025 at 11:00.

Wales And West Utilities logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Parade

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Parade, Exmouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Mar 2025 at 16:36.

Devon County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Murley Crescent

Devon County Council are carrying out Highway repair and maintenance works on Murley Crescent, Bishopsteignton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 3 Jun 2025 at 09:13.

South West Water logo
Finishing
Thursday
Details
View Map
Share
Road From Church Hill Cottages To Ashcombe Cross

South West Water were proposing to carry out Utility repair and maintenance works on Road From Church Hill Cottages To Ashcombe Cross, Ashcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Feb 2025 at 15:16.

South West Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Road From Church Hill Cottages To Ashcombe Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road From Church Hill Cottages To Ashcombe Cross, Ashcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 27 Feb 2025 at 15:20.

South West Water logo
Thursday
Details
View Map
Share
Road From Church Hill Cottages To Ashcombe Cross

South West Water carried out Utility repair and maintenance works on Road From Church Hill Cottages To Ashcombe Cross, Ashcombe.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 3 Jun 2025 and 5 Jun 2025 and were actually completed on 3 Jun 2025 between 12:10 and 15:12. The works impacted the carriageway only.

This roadwork event was last updated by South West Water on 3 Jun 2025 at 15:13.

Wales And West Utilities logo
LONG TERM
Between
4 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Parade

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Parade, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Mar 2025 at 12:11.

South West Water logo
Finishing
Monday
Details
View Map
Share
Follow
The Strand

South West Water are proposing to carry out Utility repair and maintenance works on The Strand, Lympstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 May 2025 at 13:31.

South West Water logo
Finishing
Monday
Details
View Map
Share
Follow
The Strand

South West Water are proposing to carry out Utility repair and maintenance works on The Strand, Lympstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 28 Feb 2025 at 14:24.

Devon County Council logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Follow
Road From Church Hill Cottages To Ashcombe Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Church Hill Cottages To Ashcombe Cross, Ashcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 8 May 2025 at 10:43.

Wales And West Utilities logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
St Andrews Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Andrews Road, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Mar 2025 at 15:09.

Wales And West Utilities logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
St Andrews Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Andrews Road, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 6 Mar 2025 at 11:11.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Esplanade

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Esplanade, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Mar 2025 at 11:16.

Devon County Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Little Week Lane

Devon County Council are proposing to carry out Highway repair and maintenance works on Little Week Lane, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 5 Mar 2025 at 13:03.

Devon County Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Little Week Lane

Devon County Council are proposing to carry out Highway repair and maintenance works on Little Week Lane, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 18 Feb 2025 at 14:29.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Esplanade

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Esplanade, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Mar 2025 at 11:15.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Den Promenade

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Den Promenade, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Mar 2025 at 11:16.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Den Promenade

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Den Promenade, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Mar 2025 at 11:15.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Den Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Den Road, Teignmouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 17 Mar 2025 at 14:06.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Teignmouth Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Teignmouth Road, Dawlish.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 May 2025 at 12:47.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Teignmouth Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Teignmouth Road, Dawlish.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 20 May 2025 at 13:04.

Devon County Council logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Follow
Road Past Charlecombe Cottage

Devon County Council are proposing to carry out Highway repair and maintenance works on Road Past Charlecombe Cottage, Combeinteignhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 16 May 2025 at 09:34.

Devon County Council logo
Between
12 and 16 Jun 2025
Details
View Map
Share
Follow
Higher Woodway Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Higher Woodway Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 16 May 2025 at 08:02.

Wales And West Utilities logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Hollands Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hollands Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 24 Mar 2025 at 16:05.

Wales And West Utilities logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Hollands Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hollands Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 26 Mar 2025 at 10:55.

Wales And West Utilities logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Teignmouth Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Teignmouth Road, Bishopsteignton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 May 2025 at 09:22.

Wales And West Utilities logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Church Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Church Road, Bishopsteignton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 11:34.

Wales And West Utilities logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Newton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Newton Road, Bishopsteignton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 11:33.

Devon County Council logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Fore Street

Devon County Council are proposing to carry out Section 50 on Fore Street, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Devon County Council on 8 Apr 2025 at 09:33.

BT logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Brook Lane

BT are proposing to carry out Utility asset works on Brook Lane, Shaldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Apr 2025 at 08:31.

BT logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Brook Lane

BT are proposing to carry out Utility asset works on Brook Lane, Shaldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Apr 2025 at 07:48.

South West Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Ashleigh Road

South West Water are proposing to carry out Utility repair and maintenance works on Ashleigh Road, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 2 Apr 2025 at 11:40.

South West Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Road From Colway Cross To Wear Farm

South West Water are proposing to carry out Utility repair and maintenance works on Road From Colway Cross To Wear Farm, Kingsteignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Mar 2025 at 14:59.

BT logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Shutterton Lane

BT are proposing to carry out Utility asset works on Shutterton Lane, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 1 May 2025 at 11:25.

South West Water logo
LONG TERM
Between
7 Jul and 8 Aug 2025
Details
View Map
Share
Queen Street

South West Water were proposing to carry out Utility repair and maintenance works on Queen Street, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 16 Dec 2024 at 11:32.

South West Water logo
LONG TERM
Between
7 Jul and 8 Aug 2025
Details
View Map
Share
Queen Street

South West Water were proposing to carry out Utility repair and maintenance works on Queen Street, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Dec 2024 at 14:16.

South West Water logo
LONG TERM
Between
7 Jul and 29 Aug 2025
Details
View Map
Share
Brook Street

South West Water were proposing to carry out Utility repair and maintenance works on Brook Street, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Apr 2025 at 15:29.

South West Water logo
LONG TERM
Between
7 Jul and 29 Aug 2025
Details
View Map
Share
Brook Street

South West Water were proposing to carry out Utility repair and maintenance works on Brook Street, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 10 Apr 2025 at 14:27.

Wales And West Utilities logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Badlake Hill

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Badlake Hill, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Apr 2025 at 09:48.

South West Water logo
Between
14 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Elm Grove Road

South West Water are proposing to carry out Utility repair and maintenance works on Elm Grove Road, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 6 Dec 2024 at 14:29.

Wales And West Utilities logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Meadow Park

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Meadow Park, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Apr 2025 at 09:48.

Wales And West Utilities logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Buckeridge Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Buckeridge Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Feb 2025 at 11:38.

South West Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Road From Colway Cross To Wear Farm

South West Water are proposing to carry out Utility repair and maintenance works on Road From Colway Cross To Wear Farm, Kingsteignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 26 Mar 2025 at 11:35.

Devon County Council logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Murley Crescent

Devon County Council are proposing to carry out Highway repair and maintenance works on Murley Crescent, Bishopsteignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 15 Apr 2025 at 16:23.

Wales And West Utilities logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Follow
New Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 May 2025 at 11:16.

Wales And West Utilities logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Buckeridge Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Buckeridge Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 May 2025 at 11:17.

BT logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Badlake Hill

BT are proposing to carry out Utility asset works on Badlake Hill, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Apr 2025 at 08:52.

South West Water logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Elm Grove Road

South West Water were proposing to carry out Utility repair and maintenance works on Elm Grove Road, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 26 Nov 2024 at 16:08.

South West Water logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Elm Grove Road

South West Water were proposing to carry out Utility repair and maintenance works on Elm Grove Road, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 6 Dec 2024 at 12:50.

South West Water logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
West Cliff Road

South West Water are proposing to carry out Utility repair and maintenance works on West Cliff Road, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 26 Nov 2024 at 12:41.

South West Water logo
Between
21 and 29 Jul 2025
Details
View Map
Share
Follow
West Cliff Road

South West Water are proposing to carry out Utility repair and maintenance works on West Cliff Road, Dawlish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 15:00.

Wales And West Utilities logo
Between
23 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Service Road For 100 To 190 Salterton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Service Road For 100 To 190 Salterton Road, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 May 2025 at 09:19.

Giganet logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Fordens Lane

Giganet were proposing to carry out Utility asset works on Fordens Lane, Holcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Giganet on 30 May 2025 at 11:14.

South West Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Barnpark Road

South West Water are proposing to carry out Utility repair and maintenance works on Barnpark Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Apr 2025 at 15:05.

BT logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Shutterton Lane

BT were proposing to carry out Utility asset works on Shutterton Lane, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 29 Apr 2025 at 11:53.

Devon County Council logo
Between
30 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Maer Lane

Devon County Council are proposing to carry out Highway repair and maintenance works on Maer Lane, Littleham, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 3 Apr 2025 at 11:14.

Wales And West Utilities logo
Between
30 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Church Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Church Road, Bishopsteignton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 May 2025 at 09:43.

Devon County Council logo
Between
30 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Maer Lane

Devon County Council are proposing to carry out Highway repair and maintenance works on Maer Lane, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 3 Apr 2025 at 11:14.

Wales And West Utilities logo
Between
30 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Teignmouth Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Teignmouth Road, Bishopsteignton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 May 2025 at 11:40.

Wales And West Utilities logo
Between
30 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Newton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Newton Road, Bishopsteignton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 May 2025 at 09:33.

Wales And West Utilities logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Teignmouth Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Teignmouth Road, Dawlish.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 08:38.

BT logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Salterton Road

BT are proposing to carry out Utility repair and maintenance works on Salterton Road, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 May 2025 at 16:08.

Wales And West Utilities logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Teignmouth Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Teignmouth Road, Dawlish.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 May 2025 at 13:48.

Devon County Council logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Mount Pleasant Road

Devon County Council were proposing to carry out Highway repair and maintenance works on Mount Pleasant Road, Dawlish Warren.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 2 May 2025 at 09:49.

Devon County Council logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Warren Road

Devon County Council were proposing to carry out Highway repair and maintenance works on Warren Road, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 2 May 2025 at 09:48.

Devon County Council logo
Between
6 and 10 Aug 2025
Details
View Map
Share
Follow
Road From Church Hill Cottages To Ashcombe Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Church Hill Cottages To Ashcombe Cross, Ashcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 1 May 2025 at 16:57.

Devon County Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Road Past Charlecombe Cottage

Devon County Council are proposing to carry out Highway repair and maintenance works on Road Past Charlecombe Cottage, Combeinteignhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 7 May 2025 at 10:34.

Wales And West Utilities logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Teignmouth Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Teignmouth Road, Dawlish.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 20 May 2025 at 08:41.

Devon County Council logo
Between
12 and 16 Aug 2025
Details
View Map
Share
Follow
Higher Woodway Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Higher Woodway Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 7 May 2025 at 11:02.

South West Water logo
LONG TERM
Between
12 Aug and 29 Sep 2025
Details
View Map
Share
Follow
First Avenue

South West Water are proposing to carry out Utility repair and maintenance works on First Avenue, Dawlish.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 13 May 2025 at 08:41.

South West Water logo
LONG TERM
Between
12 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Churchill Avenue

South West Water are proposing to carry out Utility repair and maintenance works on Churchill Avenue, Dawlish.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 13 May 2025 at 08:43.

South West Water logo
LONG TERM
Between
12 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Third Avenue

South West Water are proposing to carry out Utility repair and maintenance works on Third Avenue, Dawlish.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 13 May 2025 at 08:42.

South West Water logo
LONG TERM
Between
12 Aug and 29 Sep 2025
Details
View Map
Share
Third Avenue

South West Water were proposing to carry out Utility repair and maintenance works on Third Avenue, Dawlish.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 25 Apr 2025 at 12:35.

Wales And West Utilities logo
Between
12 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Teignmouth Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Teignmouth Road, Dawlish.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 20 May 2025 at 10:56.

BT logo
Between
21 and 25 Aug 2025
Details
View Map
Share
Follow
Littlemead Lane

BT are proposing to carry out Utility asset works on Littlemead Lane, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 May 2025 at 15:21.

BT logo
Between
21 and 25 Aug 2025
Details
View Map
Share
Follow
Littlemead Lane

BT are proposing to carry out Utility asset works on Littlemead Lane, Exmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 May 2025 at 09:42.

BT logo
Between
24 and 31 Aug 2025
Details
View Map
Share
Follow
Holcombe Down Road

BT are proposing to carry out Utility asset works on Holcombe Down Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 31 August 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 May 2025 at 14:08.

BT logo
Between
24 and 31 Aug 2025
Details
View Map
Share
Follow
Higher Exeter Road

BT are proposing to carry out Utility asset works on Higher Exeter Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 31 August 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 May 2025 at 14:08.

Wales And West Utilities logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Coombe Vale Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coombe Vale Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 May 2025 at 13:23.

Wales And West Utilities logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Coombe Vale Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coombe Vale Road, Teignmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 May 2025 at 09:11.

Wales And West Utilities logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Oak Hill

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Oak Hill, Dawlish.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 May 2025 at 09:14.

Giganet logo
Between
28 and 30 Aug 2025
Details
View Map
Share
Follow
Fordens Lane

Giganet are proposing to carry out Utility asset works on Fordens Lane, Holcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Giganet on 30 May 2025 at 11:16.


Roadworks Map near to Alexandra Road, DAWLISH, EX7 9JT (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Alexandra Road, DAWLISH, EX7 9JT (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South West Water logo
MAJOR
  
BRUNSWICK PLACE 
(0.0 miles)
South West Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.0
Details
Share
2
South West Water logo
MAJOR
  
BRUNSWICK PLACE 
(0.0 miles)
South West Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 6 Jun 2025
0.0
Details
Share
Follow
3
Wales And West Utilities logo
MAJOR
  
BRUNSWICK PLACE 
(0.0 miles)
Wales And West Utilities
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 6 May 2025 - 17 Jun 2025
0.0
Details
Share
Follow
4
South West Water logo
MAJOR
  
PLANTATION TERRACE 
(0.1 miles)
South West Water
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 5 May 2025 - 18 Jul 2025)
0.1
Details
Share
5
South West Water logo
WEST CLIFF ROAD 
(0.2 miles)
South West Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 30 May 2025 15:20
(Scheduled: 29 May 2025 - 6 Jun 2025)
0.2
Details
Share
Follow
6
South West Water logo
LEA MOUNT CLOSE 
(0.2 miles)
South West Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 30 May 2025 15:20
(Scheduled: 29 May 2025 - 6 Jun 2025)
0.2
Details
Share
Follow
7
Wales And West Utilities logo
MAJOR
  
STOCKTON ROAD 
(0.2 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 28 Apr 2025 - 5 Jun 2025
0.2
Details
Share
Follow
8
Wales And West Utilities logo
MAJOR
  
ROAD PAST HOOPERN TERRACE 
(0.2 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 6 May 2025 - 12 Jun 2025
0.2
Details
Share
Follow
9
Wales And West Utilities logo
MAJOR
  
PENFIELD GARDENS 
(0.2 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 6 May 2025 - 12 Jun 2025
0.2
Details
Share
Follow
10
Wales And West Utilities logo
MAJOR
  
PENFIELD GARDENS 
(0.3 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 6 May 2025 - 12 Jun 2025)
0.3
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.