ROADWORKS SUMMARY
Abbotsham, BIDEFORD, EX39 5BD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for EX39 5BD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Abbotsham, BIDEFORD, EX39 5BD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Road From The Old Forge To Chapel Cottage

BT are proposing to carry out Utility asset works on Road From The Old Forge To Chapel Cottage, Littleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 24 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Jul 2024 at 07:23.

South West Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Abbotsham Road

South West Water are carrying out Utility repair and maintenance works on Abbotsham Road, Bideford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 11:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 7 Oct 2024 at 14:22.

South West Water logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Abbotsham Road

South West Water are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 18 Jul 2024 at 12:43.

South West Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
West Yelland

South West Water are proposing to carry out Utility repair and maintenance works on West Yelland, Yelland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Jan 2024 at 08:12.

Western Power Distribution (South West) logo
Finishing
Friday
Details
View Map
Share
Follow
Avon Lane

Western Power Distribution (South West) are carrying out Utility asset works on Avon Lane, Westward Ho!.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:05 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 14 Oct 2024 at 11:03.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Dowmans Cottage To Village Hall

South West Water are carrying out Utility repair and maintenance works on Road From Dowmans Cottage To Village Hall, Westleigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 13:13 and could run through until 25 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 21 Oct 2024 at 14:23.

Wales And West Utilities logo
Today
Details
View Map
Share
High Street

Wales And West Utilities carried out Utility repair and maintenance works on High Street, Bideford.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 21 Oct 2024 and 23 Oct 2024 and were actually completed between 21 Oct 2024 (11:30) and 23 Oct 2024 (14:13). The works impacted the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Oct 2024 at 16:11.

BT logo
Finishing
Tomorrow
Details
View Map
Share
North Road

BT were proposing to carry out Utility asset works on North Road, Bideford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 24 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Oct 2024 at 08:33.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Coldharbour

BT were proposing to carry out Utility asset works on Coldharbour, Bideford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 24 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Oct 2024 at 08:33.

Wales And West Utilities logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on High Street, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 18 Jul 2024 at 14:10.

Devon County Council logo
Between
25 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Richmond Road

Devon County Council are proposing to carry out Highway improvement works on Richmond Road, Appledore.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Devon County Council on 20 Sep 2024 at 11:39.

Western Power Distribution (South West) logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Bay View Road

Western Power Distribution (South West) are proposing to carry out Remedial works on Bay View Road, Devon, Northam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 20 Aug 2024 at 16:01.

South West Water logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Atlantic Way

South West Water are proposing to carry out Utility repair and maintenance works on Atlantic Way, Westward Ho!.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 8 Feb 2024 at 12:17.

South West Water logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Atlantic Way

South West Water are proposing to carry out Utility repair and maintenance works on Atlantic Way, Westward Ho!.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 23 Sep 2024 at 15:36.

Airband Community Internet logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Nuttaberry Hill

Airband Community Internet are proposing to carry out Utility asset works on Nuttaberry Hill, East The Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 5 Sep 2024 at 13:47.

Airband Community Internet logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Nuttaberry Hill

Airband Community Internet are proposing to carry out Utility asset works on Nuttaberry Hill, East The Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 20 Aug 2024 at 13:07.

Wales And West Utilities logo
Between
12 Nov and 2 Dec 2024
Details
View Map
Share
Follow
First Raleigh

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on First Raleigh, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Aug 2024 at 13:22.

Wales And West Utilities logo
Between
12 Nov and 2 Dec 2024
Details
View Map
Share
Follow
First Raleigh

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on First Raleigh, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Aug 2024 at 13:26.

Airband Community Internet logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Sunnyside

Airband Community Internet are proposing to carry out Utility asset works on Sunnyside, East The Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 5 Sep 2024 at 11:50.

Airband Community Internet logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Sunnyside

Airband Community Internet are proposing to carry out Utility asset works on Sunnyside, East The Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 20 Aug 2024 at 13:07.

Airband Community Internet logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Upton Road

Airband Community Internet are proposing to carry out Utility asset works on Upton Road, East The Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 5 Sep 2024 at 11:51.

Airband Community Internet logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Upton Road

Airband Community Internet are proposing to carry out Utility asset works on Upton Road, East The Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 20 Aug 2024 at 13:07.

Devon County Council logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Follow
Lenards Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Lenards Road, Northam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 8 Aug 2024 at 13:48.

South West Water logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Road From Clovelly Road To Littleham Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road From Clovelly Road To Littleham Cross, Littleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 17 Oct 2024 at 09:42.

South West Water logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Road From Clovelly Road To Littleham Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road From Clovelly Road To Littleham Cross, Littleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 12 Aug 2024 at 12:53.

South West Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Golf Links Road

South West Water are proposing to carry out Utility repair and maintenance works on Golf Links Road, Westward Ho!.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 18 Oct 2024 at 16:00.

South West Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Golf Links Road

South West Water are proposing to carry out Utility repair and maintenance works on Golf Links Road, Westward Ho!.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 25 Jul 2024 at 09:53.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Heathfield Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Heathfield Road, East The Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 May 2024 at 05:57.

South West Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Nelson Road

South West Water were proposing to carry out Utility repair and maintenance works on Nelson Road, Westward Ho!.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Aug 2024 at 10:24.

South West Water logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Road From Northam Road To Kingsley Road

South West Water are proposing to carry out Utility repair and maintenance works on Road From Northam Road To Kingsley Road, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 18 Oct 2024 at 15:59.

South West Water logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Road From Northam Road To Kingsley Road

South West Water are proposing to carry out Utility repair and maintenance works on Road From Northam Road To Kingsley Road, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 20 Aug 2024 at 12:41.

Airband Community Internet logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Road From Newhaven Bridge To Goldworthy Cross

Airband Community Internet are proposing to carry out Utility asset works on Road From Newhaven Bridge To Goldworthy Cross, Parkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 5 Sep 2024 at 14:58.

Airband Community Internet logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Road From Newhaven Bridge To Flaxmans

Airband Community Internet are proposing to carry out Utility asset works on Road From Newhaven Bridge To Flaxmans, Parkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 13:57.

Airband Community Internet logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Road From Newhaven Bridge To Flaxmans

Airband Community Internet are proposing to carry out Utility asset works on Road From Newhaven Bridge To Flaxmans, Parkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 5 Sep 2024 at 14:58.

Airband Community Internet logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Road From Sunnydean Cottage To Newhaven Bridge

Airband Community Internet are proposing to carry out Utility asset works on Road From Sunnydean Cottage To Newhaven Bridge, Parkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 13:57.

Airband Community Internet logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Road From Sunnydean Cottage To Newhaven Bridge

Airband Community Internet are proposing to carry out Utility asset works on Road From Sunnydean Cottage To Newhaven Bridge, Parkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 5 Sep 2024 at 14:58.

Airband Community Internet logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Road From Newhaven Bridge To Goldworthy Cross

Airband Community Internet are proposing to carry out Utility asset works on Road From Newhaven Bridge To Goldworthy Cross, Parkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 13:57.

South West Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Nelson Road

South West Water are proposing to carry out Utility repair and maintenance works on Nelson Road, Westward Ho!.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Aug 2024 at 12:57.

Airband Community Internet logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Goats Hill Road

Airband Community Internet are proposing to carry out Utility asset works on Goats Hill Road, Northam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 14:51.

Airband Community Internet logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Goats Hill Road

Airband Community Internet are proposing to carry out Utility asset works on Goats Hill Road, Northam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 28 Aug 2024 at 14:34.

Airband Community Internet logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Cluden Road

Airband Community Internet are proposing to carry out Utility asset works on Cluden Road, Northam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 28 Aug 2024 at 14:35.

Airband Community Internet logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Cluden Road

Airband Community Internet are proposing to carry out Utility asset works on Cluden Road, Northam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 15:04.

Airband Community Internet logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Lower Meddon Street

Airband Community Internet are proposing to carry out Utility asset works on Lower Meddon Street, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Airband Community Internet on 20 Sep 2024 at 14:17.

Airband Community Internet logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Lower Meddon Street

Airband Community Internet are proposing to carry out Utility asset works on Lower Meddon Street, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Airband Community Internet on 20 Sep 2024 at 11:46.

Devon County Council logo
Between
24 and 31 Dec 2024
Details
View Map
Share
Follow
Road From The Bell Inn To St James Church

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From The Bell Inn To St James Church, Parkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 19 Sep 2024 at 14:45.

South West Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Abbotsham Road

South West Water are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 20 Aug 2024 at 11:14.

South West Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Abbotsham Road

South West Water are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Jul 2024 at 11:35.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Abbotsham Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Oct 2024 at 10:00.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Abbotsham Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Sep 2024 at 14:58.

South West Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Irsha Street

South West Water are proposing to carry out Utility repair and maintenance works on Irsha Street, Appledore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 30 Sep 2024 at 14:40.

Devon County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Road From West View To Old Quarry

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From West View To Old Quarry, Instow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 16 Sep 2024 at 15:04.

Airband Community Internet logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Higher Gunstone

Airband Community Internet are proposing to carry out Utility asset works on Higher Gunstone, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 3 Oct 2024 at 13:27.

South West Water logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Pitt Lane

South West Water are proposing to carry out Utility repair and maintenance works on Pitt Lane, Appledore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 30 Sep 2024 at 14:41.


Roadworks Map near to Abbotsham, BIDEFORD, EX39 5BD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Oct 2024 22:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Abbotsham, BIDEFORD, EX39 5BD (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South West Water logo
MAJOR
  
ABBOTSHAM ROAD 
(0.8 miles)
South West Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 7 Oct 2024 - 20 Dec 2024
0.8
Details
Share
Follow
2
South West Water logo
MAJOR
  
ABBOTSHAM ROAD 
(0.8 miles)
South West Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 7 Oct 2024 11:00
(Scheduled: 7 Oct 2024 - 20 Dec 2024)
0.8
Details
Share
Follow