ROADWORKS SUMMARY
Meddon Street, BIDEFORD, EX39 2EF
Introduction
View current and future planned roadworks and road closures for Meddon Street, EX39 2EF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Meddon Street, BIDEFORD, EX39 2EF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Meddon Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
20 Dec 2024
South West Water are carrying out Utility repair and maintenance works on Abbotsham Road, Bideford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 11:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 7 Oct 2024 at 14:22.
7 Oct and 20 Dec 2024
South West Water are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South West Water on 18 Jul 2024 at 12:43.
Monday
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on First Raleigh, Bideford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 11:24.
Monday
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on First Raleigh, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 5 Aug 2024 at 13:22.
6 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Merley Road, Westward Ho!.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 27 Nov 2024 at 14:35.
Friday
South West Water are carrying out Utility repair and maintenance works on Golf Links Road, Westward Ho!.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:33 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 25 Nov 2024 at 09:35.
Friday
South West Water are proposing to carry out Utility repair and maintenance works on Golf Links Road, Westward Ho!.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 25 Jul 2024 at 09:53.
5 Feb 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Heathfield Road, East The Water.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 10:00 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 11:08.
Tomorrow
South West Water were proposing to carry out Utility repair and maintenance works on Nelson Road, Westward Ho!.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 8 Aug 2024 at 10:24.
Monday
South West Water are carrying out Utility repair and maintenance works on Road From Weare Giffard Cross To Rakeham Toll House Cross, Monkleigh.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 02:17 and could run through until 2 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by South West Water on 27 Nov 2024 at 09:03.
Tuesday
South West Water are carrying out Utility repair and maintenance works on Road From Northam Road To Kingsley Road, Bideford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 08:27 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 27 Nov 2024 at 08:29.
Monday
South West Water are proposing to carry out Utility repair and maintenance works on Road From Northam Road To Kingsley Road, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 20 Aug 2024 at 12:41.
Friday
Airband Community Internet are proposing to carry out Utility asset works on Road From Newhaven Bridge To Flaxmans, Parkham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 13:57.
Tuesday
Wales And West Utilities are carrying out Utility repair and maintenance works on Road From Chopes Bridge Cottage To School Lane, Great Torrington.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 11:12 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 27 Nov 2024 at 14:27.
Airband Community Internet carried out Utility asset works on Road From Newhaven Bridge To Flaxmans, Parkham.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 27 Nov 2024 and 29 Nov 2024 and were actually completed on 27 Nov 2024 between 10:30 and 13:45. The works impacted the carriageway only.
This roadwork event was last updated by Airband Community Internet on 27 Nov 2024 at 13:48.
Friday
Airband Community Internet are proposing to carry out Utility asset works on Road From Sunnydean Cottage To Newhaven Bridge, Parkham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 13:57.
Airband Community Internet carried out Utility asset works on Road From Sunnydean Cottage To Newhaven Bridge, Parkham.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 27 Nov 2024 and 29 Nov 2024 and were actually completed on 27 Nov 2024 between 10:30 and 13:45. The works impacted the carriageway only.
This roadwork event was last updated by Airband Community Internet on 27 Nov 2024 at 13:48.
Airband Community Internet carried out Utility asset works on Road From Newhaven Bridge To Goldworthy Cross, Parkham.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 27 Nov 2024 and 29 Nov 2024 and were actually completed on 27 Nov 2024 between 10:30 and 13:45. The works impacted the carriageway only.
This roadwork event was last updated by Airband Community Internet on 27 Nov 2024 at 13:48.
Friday
Airband Community Internet are proposing to carry out Utility asset works on Road From Newhaven Bridge To Goldworthy Cross, Parkham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 13:57.
3 and 5 Dec 2024
South West Water are proposing to carry out Utility repair and maintenance works on Nelson Road, Westward Ho!.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 31 Oct 2024 at 15:31.
3 and 5 Dec 2024
South West Water are proposing to carry out Utility repair and maintenance works on Nelson Road, Westward Ho!.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 8 Aug 2024 at 12:57.
4 and 6 Dec 2024
Airband Community Internet are proposing to carry out Utility asset works on Goats Hill Road, Northam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Airband Community Internet on 28 Aug 2024 at 14:34.
4 and 6 Dec 2024
Airband Community Internet are proposing to carry out Utility asset works on Goats Hill Road, Northam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 14:51.
9 and 11 Dec 2024
Airband Community Internet are proposing to carry out Utility asset works on Cluden Road, Northam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Airband Community Internet on 28 Aug 2024 at 14:35.
9 and 11 Dec 2024
Airband Community Internet are proposing to carry out Utility asset works on Cluden Road, Northam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Airband Community Internet on 23 Aug 2024 at 15:04.
18 and 20 Dec 2024
Airband Community Internet are proposing to carry out Utility asset works on Lower Meddon Street, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Airband Community Internet on 20 Sep 2024 at 14:17.
18 and 20 Dec 2024
Airband Community Internet are proposing to carry out Utility asset works on Lower Meddon Street, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Airband Community Internet on 20 Sep 2024 at 11:46.
6 and 10 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Irsha Street, Appledore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 30 Sep 2024 at 14:40.
6 Jan and 28 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Sep 2024 at 14:58.
6 Jan and 7 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 20 Aug 2024 at 11:14.
6 Jan and 7 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 2 Jul 2024 at 11:35.
6 Jan and 28 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Nov 2024 at 12:37.
6 Jan and 28 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Oct 2024 at 10:00.
13 and 18 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From West View To Old Quarry, Instow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 16 Sep 2024 at 15:04.
20 and 22 Jan 2025
Airband Community Internet were proposing to carry out Utility asset works on Higher Gunstone, Bideford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Airband Community Internet on 30 Oct 2024 at 11:39.
20 Jan and 7 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Pitt Lane, Appledore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 30 Sep 2024 at 14:41.
27 and 31 Jan 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Diddywell Road, Northam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 3 Oct 2024 at 10:29.
27 and 31 Jan 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Diddywell Road, Northam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 18 Oct 2024 at 15:57.
27 and 31 Jan 2025
Western Power Distribution (South West) were proposing to carry out Utility asset works on New Quay Street, Appledore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 22 Oct 2024 at 14:00.
27 and 31 Jan 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on New Quay Street, Appledore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 11:16.
27 and 31 Jan 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on New Quay Street, Appledore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 7 Nov 2024 at 15:56.
10 Feb and 7 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Abbotsham Road, Bideford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 10 Jul 2024 at 11:26.
24 and 28 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Road Heading South From Tors Top, Westward Ho!.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South West Water on 20 Nov 2024 at 15:05.
24 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Torrington Lane, East The Water.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 25 Nov 2024 at 10:53.
24 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Chudleigh Road, East The Water.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 25 Nov 2024 at 10:49.
Roadworks Map near to Meddon Street, BIDEFORD, EX39 2EF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Meddon Street, BIDEFORD, EX39 2EF (23 Events)
(Scheduled Dates)
(miles)
(Scheduled: 26 Nov 2024 - 3 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.