ROADWORKS SUMMARY
South Street, TORRINGTON, EX38 8HE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for South Street, EX38 8HE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to South Street, TORRINGTON, EX38 8HE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for South Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Devon County Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Road From New Bridge To Woolleigh Bridge

Devon County Council are carrying out Highway repair and maintenance works on Road From New Bridge To Woolleigh Bridge, Great Torrington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 12:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 25 Feb 2025 at 12:00.

Wales And West Utilities logo
Finishing
Friday
Details
View Map
Share
Calf Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Calf Street, Great Torrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 21 Nov 2024 at 17:04.

South West Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Road Over Rudha Bridge

South West Water are carrying out Utility repair and maintenance works on Road Over Rudha Bridge, Monkleigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 14:27 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 21 Mar 2025 at 16:55.

South West Water logo
Finishing
Friday
Details
View Map
Share
Alverdiscott Road

South West Water were proposing to carry out Utility repair and maintenance works on Alverdiscott Road, East The Water.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by South West Water on 21 Mar 2025 at 15:18.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Alverdiscott Road

South West Water are proposing to carry out Utility repair and maintenance works on Alverdiscott Road, East The Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South West Water on 9 Dec 2024 at 11:59.

Devon County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Pinewood To Milestone Cottage

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Pinewood To Milestone Cottage, Weare Giffard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Devon County Council on 20 Dec 2024 at 11:51.

Wales And West Utilities logo
LONG TERM
Between
31 Mar and 14 May 2025
Details
View Map
Share
Follow
Ford Rise

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Ford Rise, Bideford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Feb 2025 at 11:30.

Wales And West Utilities logo
Between
10 and 16 Apr 2025
Details
View Map
Share
Follow
Calvesford Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Calvesford Road, Great Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Jan 2025 at 12:47.

South West Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Road From Holly Cottage To Hill View

South West Water are proposing to carry out Utility repair and maintenance works on Road From Holly Cottage To Hill View, Monkleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 21 Mar 2025 at 12:46.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Road North From Church Ford

BT were proposing to carry out Utility asset works on Road North From Church Ford, Little Torrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 23 Jan 2025 at 10:55.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Road North From Church Ford

BT were proposing to carry out Utility asset works on Road North From Church Ford, Little Torrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 15 Jan 2025 at 15:28.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Road North From Church Ford

BT are proposing to carry out Utility asset works on Road North From Church Ford, Little Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 29 Jan 2025 at 14:23.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Road From Church Ford To Willow Bank

BT were proposing to carry out Utility asset works on Road From Church Ford To Willow Bank, Little Torrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 23 Jan 2025 at 10:57.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Road From Church Ford To Willow Bank

BT are proposing to carry out Utility asset works on Road From Church Ford To Willow Bank, Little Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 29 Jan 2025 at 14:26.

Wales And West Utilities logo
Between
28 Apr and 27 May 2025
Details
View Map
Share
Follow
New Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New Road, Bideford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Feb 2025 at 11:36.

Western Power Distribution (South West) logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Road From Church Lane Past Rakeham Hill Cross

Western Power Distribution (South West) were proposing to carry out New service connection on Road From Church Lane Past Rakeham Hill Cross, Frithelstockstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 14 Mar 2025 at 10:25.

South West Water logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Calvesford Road

South West Water are proposing to carry out Utility repair and maintenance works on Calvesford Road, Great Torrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Mar 2025 at 13:51.

Devon County Council logo
LONG TERM
Between
5 May and 13 Jun 2025
Details
View Map
Share
Follow
New Road

Devon County Council are proposing to carry out Highway repair and maintenance works on New Road, Bideford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 7 Feb 2025 at 16:14.

BT logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Road From Langtree To Southcott Cross

BT are proposing to carry out Utility asset works on Road From Langtree To Southcott Cross, Langtree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 10 Feb 2025 at 15:31.

BT logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Road From Watergate Bridge Cross To Southcott Cross

BT are proposing to carry out Utility asset works on Road From Watergate Bridge Cross To Southcott Cross, Langtree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Feb 2025 at 11:26.

Devon County Council logo
LONG TERM
Between
26 May and 26 Sep 2025
Details
View Map
Share
Follow
School Lane

Devon County Council are proposing to carry out Highway improvement works on School Lane, Great Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 6 Mar 2025 at 12:13.

Devon County Council logo
Between
27 May and 23 Jun 2025
Details
View Map
Share
Follow
Road From High Bullen Garage To Cranford Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From High Bullen Garage To Cranford Cross, High Bullen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 13 Mar 2025 at 14:55.

Devon County Council logo
Between
27 May and 23 Jun 2025
Details
View Map
Share
Follow
Road From Cranford Cross To Langridgeford Bridge

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Cranford Cross To Langridgeford Bridge, Great Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 13 Mar 2025 at 14:55.

BT logo
Between
27 May and 2 Jun 2025
Details
View Map
Share
Follow
Road From Fore Street To Withacott

BT are proposing to carry out Utility asset works on Road From Fore Street To Withacott, Withacott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 Feb 2025 at 10:23.

BT logo
Between
27 May and 2 Jun 2025
Details
View Map
Share
Follow
Fore Street

BT are proposing to carry out Utility asset works on Fore Street, Langtree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 Feb 2025 at 10:24.

South West Water logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Road From Holly Cottage To Hill View

South West Water are proposing to carry out Utility repair and maintenance works on Road From Holly Cottage To Hill View, Monkleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 20 Feb 2025 at 12:34.

BT logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Road From Watergate Bridge Cross To Southcott Cross

BT are proposing to carry out Utility asset works on Road From Watergate Bridge Cross To Southcott Cross, Langtree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Mar 2025 at 12:19.

BT logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Road From Watergate Bridge Cross To Southcott Cross

BT are proposing to carry out Utility asset works on Road From Watergate Bridge Cross To Southcott Cross, Langtree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 Feb 2025 at 11:37.

Devon County Council logo
LONG TERM
Between
16 Jun and 17 Oct 2025
Details
View Map
Share
Follow
School Lane

Devon County Council are proposing to carry out Highway improvement works on School Lane, Great Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 18 Mar 2025 at 17:15.

Western Power Distribution (South West) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Road From Church Lane Past Rakeham Hill Cross

Western Power Distribution (South West) are proposing to carry out New service connection on Road From Church Lane Past Rakeham Hill Cross, Frithelstockstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 14 Mar 2025 at 10:27.

Wales And West Utilities logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Mill Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Mill Street, Great Torrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 21 Mar 2025 at 11:56.

Devon County Council logo
Between
17 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From High Bullen Garage To Cranford Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From High Bullen Garage To Cranford Cross, High Bullen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 12 Mar 2025 at 17:07.

Devon County Council logo
Between
17 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Cranford Cross To Langridgeford Bridge

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Cranford Cross To Langridgeford Bridge, Great Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 12 Mar 2025 at 17:07.


Roadworks Map near to South Street, TORRINGTON, EX38 8HE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Mar 2025 05:52
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to South Street, TORRINGTON, EX38 8HE (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South West Water logo
URGENT
  
POTACRE STREET 
(0.1 miles)
South West Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Complete
20 Mar 2025 12:55 - 18:04
0.1
Details
Share
2
Wales And West Utilities logo
MAJOR
  
CALF STREET 
(0.4 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 3 Mar 2025 - 28 Mar 2025)
0.4
Details
Share
3
Wales And West Utilities logo
MAJOR
  
CALVESFORD ROAD 
(0.4 miles)
Wales And West Utilities
Utility repair and maintenance works - Verge - No carriageway incursion
Cancelled
(Scheduled: 18 Oct 2024 - 28 Mar 2025)
0.4
Details
Share
4
Wales And West Utilities logo
MAJOR
  
CALVESFORD ROAD 
(0.4 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 8 Jan 2025 - 19 Jun 2025
0.4
Details
Share
Follow
5
Wales And West Utilities logo
MAJOR
  
CALVESFORD ROAD 
(0.4 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
Complete
18 Oct 2024 08:00 - 7 Mar 2025 14:30
0.4
Details
Share
6
Wales And West Utilities logo
MAJOR
  
BOROUGH ROAD 
(0.4 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 12 Mar 2025 - 8 Apr 2025
0.4
Details
Share
Follow
7
Wales And West Utilities logo
MAJOR
  
BOROUGH ROAD 
(0.4 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 3 Mar 2025 - 28 Mar 2025)
0.4
Details
Share