ROADWORKS SUMMARY
Greenclose Road, ILFRACOMBE, EX34 8FU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Greenclose Road, EX34 8FU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Greenclose Road, ILFRACOMBE, EX34 8FU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Greenclose Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Devon County Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Marlborough Road

Devon County Council are carrying out Highway repair and maintenance works on Marlborough Road, Ilfracombe.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 23 Apr 2025 at 09:02.

Devon County Council logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Wilder Road

Devon County Council are carrying out Highway repair and maintenance works on Wilder Road, Ilfracombe.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 12:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 6 May 2025 at 13:14.

Devon County Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
New Barnstaple Road

Devon County Council are carrying out Remedial works on New Barnstaple Road, Ilfracombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 09:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 16 Apr 2025 at 16:16.

Devon County Council logo
LONG TERM
Until
10 Apr 2026
Details
View Map
Share
Follow
Road From Watermouth Road To The Old Saw Mill

Devon County Council are carrying out Diversionary works on Road From Watermouth Road To The Old Saw Mill, Ilfracombe.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 10:00 and could run through until 10 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 16 Apr 2025 at 14:19.

Devon County Council logo
LONG TERM
Until
10 Apr 2026
Details
View Map
Share
Follow
Road From Watermouth Road To The Old Saw Mill

Devon County Council are carrying out Diversionary works on Road From Watermouth Road To The Old Saw Mill, Ilfracombe.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 10:00 and could run through until 10 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Apr 2025 at 10:12.

Wales And West Utilities logo
Finishing
Thursday
Details
View Map
Share
Hangman Path

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Hangman Path, Combe Martin.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 May 2025 and run through until 5 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 May 2025 at 17:07.

Wales And West Utilities logo
LONG TERM
Between
28 May and 22 Jul 2025
Details
View Map
Share
Follow
Borough Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Borough Road, Combe Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Mar 2025 at 11:26.

Wales And West Utilities logo
LONG TERM
Between
28 May and 22 Jul 2025
Details
View Map
Share
Follow
King Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on King Street, Combe Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Mar 2025 at 11:26.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Road From Cross Park To Lower Down Copse

BT are carrying out Utility asset works on Road From Cross Park To Lower Down Copse, Berrynarbor.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 08:20 and could run through until 5 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 2 Jun 2025 at 15:37.

Wales And West Utilities logo
Finishing
Thursday
Details
View Map
Share
Follow
Buzzacott Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Buzzacott Lane, Combe Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 5 Mar 2025 at 08:59.

Devon County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Road From Woolacombe Station Road To Turnpike Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Woolacombe Station Road To Turnpike Cross, Woolacombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 19 May 2025 at 11:04.

Devon County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Woolacombe Station Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Woolacombe Station Road, Woolacombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 19 May 2025 at 11:01.

Devon County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Mortehoe Station Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Mortehoe Station Road, Mortehoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 19 May 2025 at 11:06.

BT logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Road From Smythen Cross To Parsons Pightle

BT are proposing to carry out Utility asset works on Road From Smythen Cross To Parsons Pightle, Sterridge Valley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Jan 2025 at 11:06.

South West Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Silver Street

South West Water were proposing to carry out Utility repair and maintenance works on Silver Street, Berrynarbor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 6 Mar 2025 at 11:15.

South West Water logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Belmont Road

South West Water were proposing to carry out Utility repair and maintenance works on Belmont Road, Ilfracombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 16 Apr 2025 at 10:42.

South West Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Newberry Road

South West Water are proposing to carry out Utility repair and maintenance works on Newberry Road, Combe Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Mar 2025 at 15:36.

South West Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Mortehoe Station Road

South West Water are proposing to carry out New service connection on Mortehoe Station Road, Mortehoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 6 May 2025 at 09:20.

South West Water logo
Between
25 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Barton Lane

South West Water are proposing to carry out Utility repair and maintenance works on Barton Lane, Berrynarbor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 22 May 2025 at 16:25.

South West Water logo
Between
25 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Barton Lane

South West Water are proposing to carry out Utility repair and maintenance works on Barton Lane, Berrynarbor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Mar 2025 at 16:30.

Devon County Council logo
Between
27 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Fern Way

Devon County Council are proposing to carry out Highway repair and maintenance works on Fern Way, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 30 May 2025 at 08:47.

Devon County Council logo
Between
27 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Mill Head

Devon County Council are proposing to carry out Highway repair and maintenance works on Mill Head, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 30 May 2025 at 08:58.

Devon County Council logo
Between
27 Jun and 1 Jul 2025
Details
View Map
Share
Follow
The Shields

Devon County Council are proposing to carry out Highway repair and maintenance works on The Shields, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 30 May 2025 at 08:49.

Wales And West Utilities logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
St Brannocks Park Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Brannocks Park Road, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Apr 2025 at 17:04.

Wales And West Utilities logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
St Brannocks Park Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Brannocks Park Road, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Mar 2025 at 12:01.

Devon County Council logo
Between
1 and 5 Jul 2025
Details
View Map
Share
Follow
Mill Head

Devon County Council are proposing to carry out Highway repair and maintenance works on Mill Head, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 31 Mar 2025 at 14:31.

Devon County Council logo
Between
12 and 17 Jul 2025
Details
View Map
Share
Follow
Lane Past South Burland Farm

Devon County Council are proposing to carry out Highway repair and maintenance works on Lane Past South Burland Farm, Bittadon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Mar 2025 at 15:57.

Devon County Council logo
Between
12 and 17 Jul 2025
Details
View Map
Share
Follow
Road From Lynton Cross To The Old Rectory

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Lynton Cross To The Old Rectory, West Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Mar 2025 at 15:55.

Devon County Council logo
Between
12 and 17 Jul 2025
Details
View Map
Share
Woolacombe Station Road

Devon County Council were proposing to carry out Highway repair and maintenance works on Woolacombe Station Road, Woolacombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 July 2025 and run through until 17 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 2 Apr 2025 at 15:28.

Devon County Council logo
Between
12 and 17 Jul 2025
Details
View Map
Share
Road From Woolacombe Station Road To Turnpike Cross

Devon County Council were proposing to carry out Highway repair and maintenance works on Road From Woolacombe Station Road To Turnpike Cross, Woolacombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 July 2025 and run through until 17 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 2 Apr 2025 at 15:30.

Devon County Council logo
Between
19 and 23 Jul 2025
Details
View Map
Share
Follow
Woolacombe Station Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Woolacombe Station Road, Woolacombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 14 Apr 2025 at 10:54.

Devon County Council logo
Between
19 and 23 Jul 2025
Details
View Map
Share
Follow
Road From Woolacombe Station Road To Turnpike Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Woolacombe Station Road To Turnpike Cross, Woolacombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 14 Apr 2025 at 10:59.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Road From Twitchen Cross To Trimstone Cross

BT are proposing to carry out Utility asset works on Road From Twitchen Cross To Trimstone Cross, Mullacott Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Apr 2025 at 10:35.

South West Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Silver Street

South West Water were proposing to carry out Utility repair and maintenance works on Silver Street, Berrynarbor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 16 Apr 2025 at 10:42.

South West Water logo
Between
30 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Silver Street

South West Water are proposing to carry out Utility repair and maintenance works on Silver Street, Berrynarbor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 6 May 2025 at 11:13.

South West Water logo
Between
31 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Mortehoe Station Road

South West Water are proposing to carry out New service connection on Mortehoe Station Road, Mortehoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 28 Apr 2025 at 13:56.

Devon County Council logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Fern Way

Devon County Council are proposing to carry out Highway repair and maintenance works on Fern Way, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 9 Apr 2025 at 13:43.

Devon County Council logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
The Shields

Devon County Council are proposing to carry out Highway repair and maintenance works on The Shields, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 9 Apr 2025 at 13:44.

BT logo
Between
3 and 15 Aug 2025
Details
View Map
Share
Follow
Road From Lynton Road To Higher Leigh Manor Hotel

BT are proposing to carry out Utility repair and maintenance works on Road From Lynton Road To Higher Leigh Manor Hotel, Combe Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 May 2025 at 09:12.

BT logo
Between
3 and 15 Aug 2025
Details
View Map
Share
Follow
Lynton Road

BT are proposing to carry out Utility repair and maintenance works on Lynton Road, Combe Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 May 2025 at 09:10.

South West Water logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Belmont Road

South West Water are proposing to carry out Utility repair and maintenance works on Belmont Road, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 12 May 2025 at 15:14.

South West Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Mortehoe Station Road

South West Water were proposing to carry out New service connection on Mortehoe Station Road, Mortehoe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 22 Apr 2025 at 13:02.

BT logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Shute Lane

BT are proposing to carry out Utility asset works on Shute Lane, Combe Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 May 2025 at 10:30.

South West Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Mortehoe Station Road

South West Water were proposing to carry out Utility repair and maintenance works on Mortehoe Station Road, Mortehoe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 30 Apr 2025 at 14:08.

South West Water logo
Between
15 and 29 Aug 2025
Details
View Map
Share
Belmont Road

South West Water were proposing to carry out Utility repair and maintenance works on Belmont Road, Ilfracombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 9 May 2025 at 11:58.

South West Water logo
Between
15 and 29 Aug 2025
Details
View Map
Share
Belmont Road

South West Water were proposing to carry out Utility repair and maintenance works on Belmont Road, Ilfracombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 9 May 2025 at 08:34.

Devon County Council logo
Between
15 and 19 Aug 2025
Details
View Map
Share
Follow
Road From Cross Park To Lower Down Copse

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Cross Park To Lower Down Copse, Berrynarbor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 14 Apr 2025 at 11:33.

BT logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Road From Rectory Road To Kiln Lane

BT are proposing to carry out Utility repair and maintenance works on Road From Rectory Road To Kiln Lane, Combe Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 May 2025 at 10:57.

Devon County Council logo
Between
19 and 23 Aug 2025
Details
View Map
Share
Follow
Mortehoe Station Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Mortehoe Station Road, Mortehoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 25 Apr 2025 at 14:18.

Devon County Council logo
Between
19 and 23 Aug 2025
Details
View Map
Share
Follow
Road From Lynton Cross To The Old Rectory

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Lynton Cross To The Old Rectory, West Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 25 Apr 2025 at 14:38.

Devon County Council logo
Between
27 and 31 Aug 2025
Details
View Map
Share
Follow
Road From Two Pots To Hore Down Gate

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Two Pots To Hore Down Gate, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 28 Apr 2025 at 14:27.

Devon County Council logo
Between
27 and 31 Aug 2025
Details
View Map
Share
Follow
Fern Way

Devon County Council are proposing to carry out Highway repair and maintenance works on Fern Way, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 22 May 2025 at 15:54.

Devon County Council logo
Between
27 and 31 Aug 2025
Details
View Map
Share
Follow
Mill Head

Devon County Council are proposing to carry out Highway repair and maintenance works on Mill Head, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 22 May 2025 at 16:00.

Devon County Council logo
Between
27 and 31 Aug 2025
Details
View Map
Share
Follow
The Shields

Devon County Council are proposing to carry out Highway repair and maintenance works on The Shields, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 22 May 2025 at 15:54.


Roadworks Map near to Greenclose Road, ILFRACOMBE, EX34 8FU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 09:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Greenclose Road, ILFRACOMBE, EX34 8FU (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South West Water logo
URGENT
  
CHURCH STREET 
(0.1 miles)
South West Water
Utility repair and maintenance works - Footway - Give and take
Complete
1 Jun 2025 12:14 - 16:02
0.1
Details
Share
2
Devon County Council logo
EMERGENCY
  
WILDER ROAD 
(0.2 miles)
Devon County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 6 Feb 2025 12:00
(Scheduled: 6 Feb 2025 - 27 Jun 2025)
0.2
Details
Share
Follow
3
Devon County Council logo
EMERGENCY
  
MARLBOROUGH ROAD 
(0.2 miles)
Devon County Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 27 Jan 2025 08:00
(Scheduled: 27 Jan 2025 - 26 Sep 2025)
0.2
Details
Share
Follow
4
Devon County Council logo
MAJOR
  
HIGHFIELD ROAD 
(0.3 miles)
Devon County Council
Highway repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 24 Mar 2025 - 20 Jun 2025
0.3
Details
Share
Follow
5
Devon County Council logo
MAJOR
  
HIGHFIELD ROAD 
(0.3 miles)
Devon County Council
Highway repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 24 Feb 2025 - 20 Jun 2025
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.