ROADWORKS SUMMARY
Longland Lane, BRAUNTON, EX33 1JR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Longland Lane, EX33 1JR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Longland Lane, BRAUNTON, EX33 1JR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Longland Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Meadow Dene To The Grange

BT are proposing to carry out New service connection on Road From Meadow Dene To The Grange, Lincombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Sep 2024 at 13:41.

BT logo
Between
25 and 27 Dec 2024
Details
View Map
Share
Follow
Road From Lee Bay Hotel To Dripping Well

BT are proposing to carry out New service connection on Road From Lee Bay Hotel To Dripping Well, Lee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Sep 2024 at 13:41.

South West Water logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Willoway Lane

South West Water are proposing to carry out Utility repair and maintenance works on Willoway Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 12 Nov 2024 at 12:56.

South West Water logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Willoway Lane

South West Water are proposing to carry out Utility repair and maintenance works on Willoway Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Oct 2024 at 10:38.

South West Water logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
West Hill Lane

South West Water are proposing to carry out Utility repair and maintenance works on West Hill Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 12 Nov 2024 at 12:56.

South West Water logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
West Hill Lane

South West Water are proposing to carry out Utility repair and maintenance works on West Hill Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Oct 2024 at 10:38.

Western Power Distribution (South West) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Velator Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Velator Road, Braunton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 21 Oct 2024 at 11:53.

Western Power Distribution (South West) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Velator Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Velator Road, Braunton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 7 Oct 2024 at 14:58.

Devon County Council logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Road From Oxford Cross To Kings Arms

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Oxford Cross To Kings Arms, Georgeham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Dec 2024 at 11:27.

South West Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Road From Bye Cross To No Mans Land

South West Water are proposing to carry out Permanent reinstatement on Road From Bye Cross To No Mans Land, Darracott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 30 Sep 2024 at 12:17.

South West Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Road From Bye Cross To No Mans Land

South West Water are proposing to carry out Permanent reinstatement on Road From Bye Cross To No Mans Land, Darracott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 5 Dec 2024 at 15:45.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Higher Slade Road

BT are proposing to carry out New service connection on Higher Slade Road, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Sep 2024 at 09:36.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Higher Slade Road

BT are proposing to carry out New service connection on Higher Slade Road, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 10:54.

Western Power Distribution (South West) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Vellator Way

Western Power Distribution (South West) are proposing to carry out New service connection on Vellator Way, Braunton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Western Power Distribution (South West) on 21 Oct 2024 at 11:53.

Western Power Distribution (South West) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Vellator Way

Western Power Distribution (South West) are proposing to carry out New service connection on Vellator Way, Braunton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Western Power Distribution (South West) on 7 Oct 2024 at 15:02.

Western Power Distribution (South West) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Sandy Lane To Velator Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Road From Sandy Lane To Velator Road, Braunton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 16 Oct 2024 at 16:07.

Western Power Distribution (South West) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Sandy Lane To Velator Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Road From Sandy Lane To Velator Road, Braunton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 7 Oct 2024 at 15:03.

BT logo
Between
9 and 15 Jan 2025
Details
View Map
Share
Follow
Higher Slade Road

BT are proposing to carry out New service connection on Higher Slade Road, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 12:37.

BT logo
Between
9 and 15 Jan 2025
Details
View Map
Share
Follow
Higher Slade Road

BT are proposing to carry out New service connection on Higher Slade Road, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Sep 2024 at 10:34.

South West Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Road Past Fairview Farm

South West Water are proposing to carry out Utility repair and maintenance works on Road Past Fairview Farm, West Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 17 Dec 2024 at 08:43.

South West Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Road Past Fairview Farm

South West Water are proposing to carry out Utility repair and maintenance works on Road Past Fairview Farm, West Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 3 Oct 2024 at 11:58.

BT logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Meadow Dene To The Grange

BT are proposing to carry out New service connection on Road From Meadow Dene To The Grange, Lincombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Sep 2024 at 11:41.

South West Water logo
Between
20 and 26 Jan 2025
Details
View Map
Share
Follow
Frog Lane

South West Water are proposing to carry out Utility repair and maintenance works on Frog Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 16 Oct 2024 at 10:15.

South West Water logo
Between
20 and 26 Jan 2025
Details
View Map
Share
Follow
Frog Lane

South West Water are proposing to carry out Utility repair and maintenance works on Frog Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 12 Nov 2024 at 13:00.

BT logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Meadow Dene To The Grange

BT are proposing to carry out New service connection on Road From Meadow Dene To The Grange, Lincombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:24.

South West Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Devon View To St Marys Road

South West Water are proposing to carry out Utility repair and maintenance works on Road From Devon View To St Marys Road, Croyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Dec 2024 at 11:50.

South West Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Devon View To St Marys Road

South West Water are proposing to carry out Utility repair and maintenance works on Road From Devon View To St Marys Road, Croyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 10 Oct 2024 at 10:30.

South West Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
St Marys Road

South West Water are proposing to carry out Utility repair and maintenance works on St Marys Road, Croyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 12 Dec 2024 at 11:02.

South West Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
St Marys Road

South West Water are proposing to carry out Utility repair and maintenance works on St Marys Road, Croyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 10 Oct 2024 at 10:28.

South West Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Road From Longland Lane To Georgeham Village Store

South West Water were proposing to carry out Utility repair and maintenance works on Road From Longland Lane To Georgeham Village Store, Georgeham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 29 Oct 2024 at 09:57.

South West Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
First Field Lane

South West Water are proposing to carry out Utility repair and maintenance works on First Field Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 12 Nov 2024 at 13:02.

South West Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
First Field Lane

South West Water are proposing to carry out Utility repair and maintenance works on First Field Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 16 Oct 2024 at 09:21.

Airband Community Internet logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Slade Road

Airband Community Internet were proposing to carry out Utility asset works on Slade Road, Ilfracombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 29 Oct 2024 at 11:55.

Airband Community Internet logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Slade Road

Airband Community Internet are proposing to carry out Utility asset works on Slade Road, Ilfracombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 11 Oct 2024 at 13:38.

BT logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Road From Lee Bay Hotel To Dripping Well

BT are proposing to carry out New service connection on Road From Lee Bay Hotel To Dripping Well, Lee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:24.

BT logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Road From Lee Bay Hotel To Dripping Well

BT are proposing to carry out New service connection on Road From Lee Bay Hotel To Dripping Well, Lee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Sep 2024 at 13:50.

South West Water logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
South Street

South West Water were proposing to carry out Utility repair and maintenance works on South Street, Braunton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 13 Dec 2024 at 15:13.

Wales And West Utilities logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Lower Park Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Park Road, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 16:03.

Wales And West Utilities logo
Between
3 and 13 Feb 2025
Details
View Map
Share
Follow
Lower Park Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Park Road, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 5 Dec 2024 at 15:44.

South West Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
St Marys Road

South West Water were proposing to carry out Utility repair and maintenance works on St Marys Road, Croyde.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 29 Oct 2024 at 10:34.

Airband Community Internet logo
On
6 Feb 2025
Details
View Map
Share
Follow
Georgeham Footpath 19

Airband Community Internet are proposing to carry out Utility asset works on Georgeham Footpath 19, Georgeham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 6 February 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 31 Oct 2024 at 16:24.

Airband Community Internet logo
On
6 Feb 2025
Details
View Map
Share
Follow
Georgeham Footpath 19

Airband Community Internet are proposing to carry out Utility asset works on Georgeham Footpath 19, Georgeham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 6 February 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 4 Nov 2024 at 14:54.

Western Power Distribution (South West) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Barton Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Barton Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Oct 2024 at 14:13.

Western Power Distribution (South West) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Barton Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Barton Lane, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Sep 2024 at 16:21.

Western Power Distribution (South West) logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Sandy Lane

Western Power Distribution (South West) are proposing to carry out Remedial works on Sandy Lane, Devon, Woolacombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 8 Nov 2024 at 11:24.

Wales And West Utilities logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Lower Park Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Park Road, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 14 Nov 2024 at 10:00.

South West Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Springfield Road

South West Water are proposing to carry out Utility repair and maintenance works on Springfield Road, Woolacombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 15 Nov 2024 at 12:11.

South West Water logo
Between
26 Feb and 19 Mar 2025
Details
View Map
Share
South Street

South West Water were proposing to carry out Utility repair and maintenance works on South Street, Braunton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 28 Nov 2024 at 16:17.

South West Water logo
Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Road From Longland Lane To Georgeham Village Store

South West Water are proposing to carry out Utility repair and maintenance works on Road From Longland Lane To Georgeham Village Store, Georgeham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 15 Nov 2024 at 10:58.

Western Power Distribution (South West) logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Road From Woolacombe Station Road To Hartnoll Cottages

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Road From Woolacombe Station Road To Hartnoll Cottages, Woolacombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 3 Dec 2024 at 14:45.

South West Water logo
Between
3 and 16 Mar 2025
Details
View Map
Share
Follow
South Street

South West Water are proposing to carry out Utility repair and maintenance works on South Street, Braunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Dec 2024 at 14:20.

South West Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Road From Forda Hill To Kings Arms

South West Water are proposing to carry out Utility repair and maintenance works on Road From Forda Hill To Kings Arms, Georgeham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 27 Nov 2024 at 14:44.


Roadworks Map near to Longland Lane, BRAUNTON, EX33 1JR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Longland Lane, BRAUNTON, EX33 1JR (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.