ROADWORKS SUMMARY
Farway, COLYTON, EX24 6DG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for EX24 6DG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Farway, COLYTON, EX24 6DG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Devon County Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Hayne Lane

Devon County Council are carrying out Highway repair and maintenance works on Hayne Lane, Wilmington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 July 2024 at 08:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 24 Sep 2024 at 11:19.

Devon County Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Road From Esantee To Chineway Cottage

Devon County Council are carrying out Highway repair and maintenance works on Road From Esantee To Chineway Cottage, Ottery St Mary.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 2 Sep 2024 at 08:20.

Devon County Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Sidmouth Road

Devon County Council are carrying out Highway repair and maintenance works on Sidmouth Road, Honiton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 10 Oct 2024 at 11:33.

Wales And West Utilities logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Streamers Meadows

Wales And West Utilities are carrying out Utility repair and maintenance works on Streamers Meadows, Honiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 10:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 20 Nov 2024 at 14:29.

South West Water logo
Finishing
Monday
Details
View Map
Share
Follow
Road Heading West From Moorcox Cross

South West Water are carrying out Utility repair and maintenance works on Road Heading West From Moorcox Cross, Wilmington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 November 2024 at 11:47 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 21 Nov 2024 at 12:05.

Western Power Distribution (South West) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Road From Weston Cross To Cherry Bridge

Western Power Distribution (South West) are carrying out Utility asset works on Road From Weston Cross To Cherry Bridge, Weston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Nov 2024 at 08:52.

Western Power Distribution (South West) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Yonder Street

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Yonder Street, Ottery St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Aug 2024 at 10:54.

Western Power Distribution (South West) logo
Finishing
Tomorrow
Details
View Map
Share
Road From Weston Cross To Cherry Bridge

Western Power Distribution (South West) were proposing to carry out Utility asset works on Road From Weston Cross To Cherry Bridge, Weston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 4 Nov 2024 at 15:04.

Wales And West Utilities logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Colyford Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Colyford Road, Seaton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:30 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 18 Nov 2024 at 09:33.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Aug 2024 at 13:05.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Sep 2024 at 11:27.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Farway Countryside Park

BT are proposing to carry out Utility asset works on Road Past Farway Countryside Park, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Aug 2024 at 13:04.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Farway Countryside Park

BT are proposing to carry out Utility asset works on Road Past Farway Countryside Park, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Sep 2024 at 11:58.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 09:59.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Farway Countryside Park

BT are proposing to carry out Utility asset works on Road Past Farway Countryside Park, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 09:59.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Farway Countryside Park

BT are proposing to carry out Utility asset works on Road Past Farway Countryside Park, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Sep 2024 at 11:27.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Sep 2024 at 11:58.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Sep 2024 at 11:27.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Aug 2024 at 13:04.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 10:43.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Sep 2024 at 11:58.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 09:59.

Wales And West Utilities logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Chineway Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Chineway Road, Ottery St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 23 Aug 2024 at 11:33.

Wales And West Utilities logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Chineway Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Chineway Road, Ottery St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 12:15.

BT logo
Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 10:43.

BT logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Road From Branscombe Cross To Northern Lane

BT are proposing to carry out Utility asset works on Road From Branscombe Cross To Northern Lane, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 16 Sep 2024 at 08:49.

BT logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
South Lawn

BT are proposing to carry out Utility asset works on South Lawn, Sidmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2024 at 08:20.

South West Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Soldiers Hill House

South West Water are proposing to carry out Utility repair and maintenance works on Road Past Soldiers Hill House, Salcombe Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 9 Oct 2024 at 13:01.

South West Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Road From Main Road To Eveleigh Farm

South West Water were proposing to carry out Utility repair and maintenance works on Road From Main Road To Eveleigh Farm, Gittisham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Sep 2024 at 09:34.

South West Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Road From Main Road To Eveleigh Farm

South West Water were proposing to carry out Utility repair and maintenance works on Road From Main Road To Eveleigh Farm, Gittisham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 23 Sep 2024 at 14:09.

South West Water logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Honiton Bottom Road

South West Water are proposing to carry out Utility repair and maintenance works on Honiton Bottom Road, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South West Water on 30 Aug 2024 at 12:02.

South West Water logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Honiton Bottom Road

South West Water are proposing to carry out Utility repair and maintenance works on Honiton Bottom Road, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 09:22.

BT logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Farway Countryside Park

BT are proposing to carry out Utility asset works on Road Past Farway Countryside Park, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 10:44.

Nexfibre Networks Limited logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Sep 2024 at 10:21.

Devon County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Sheppards Knap

Devon County Council are proposing to carry out Highway repair and maintenance works on Sheppards Knap, Dalwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Oct 2024 at 16:14.

Nexfibre Networks Limited logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 08:49.

Nexfibre Networks Limited logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Silver Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Silver Street, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 10:55.

South West Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Lane To Combe Wood House

South West Water are proposing to carry out Utility repair and maintenance works on Lane To Combe Wood House, Salcombe Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 21 Oct 2024 at 14:17.

Nexfibre Networks Limited logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 14:32.

Nexfibre Networks Limited logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 19 Sep 2024 at 14:12.

Nexfibre Networks Limited logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 20 Sep 2024 at 10:42.

Devon County Council logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Follow
Old Chard Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Old Chard Road, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Sep 2024 at 14:15.

Devon County Council logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Follow
Northcote Hill

Devon County Council are proposing to carry out Highway repair and maintenance works on Northcote Hill, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Sep 2024 at 14:17.

Nexfibre Networks Limited logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Queen Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Queen Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 20 Sep 2024 at 09:17.

Nexfibre Networks Limited logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Follow
Queen Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Queen Street, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Oct 2024 at 16:07.

Nexfibre Networks Limited logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Queen Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Queen Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 18 Sep 2024 at 14:13.

South West Water logo
Between
13 and 17 Dec 2024
Details
View Map
Share
Follow
Road From Higher Barn To The Old Cider House

South West Water are proposing to carry out Permanent reinstatement on Road From Higher Barn To The Old Cider House, Branscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 17 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 9 Sep 2024 at 12:24.

South West Water logo
Between
13 and 17 Dec 2024
Details
View Map
Share
Follow
Road From Higher Barn To The Old Cider House

South West Water are proposing to carry out Permanent reinstatement on Road From Higher Barn To The Old Cider House, Branscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 17 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 10 Sep 2024 at 12:06.

Nexfibre Networks Limited logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Sep 2024 at 12:05.

Nexfibre Networks Limited logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Sep 2024 at 11:01.

BT logo
Between
16 and 21 Dec 2024
Details
View Map
Share
Follow
Road From Branscombe Cross To Northern Lane

BT are proposing to carry out Utility asset works on Road From Branscombe Cross To Northern Lane, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Sep 2024 at 14:47.

BT logo
Between
16 and 21 Dec 2024
Details
View Map
Share
Follow
Road From Branscombe Cross To Northern Lane

BT are proposing to carry out Utility asset works on Road From Branscombe Cross To Northern Lane, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 10:38.

BT logo
Between
16 and 21 Dec 2024
Details
View Map
Share
Follow
Road From Branscombe Cross To Northern Lane

BT are proposing to carry out Utility asset works on Road From Branscombe Cross To Northern Lane, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Sep 2024 at 08:28.

Nexfibre Networks Limited logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Sep 2024 at 13:08.

Wales And West Utilities logo
LONG TERM
Between
2 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Seaton Down Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Seaton Down Road, Seaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Nov 2024 at 09:26.

Devon County Council logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Nags Head Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Nags Head Road, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 26 Sep 2024 at 09:37.

Nexfibre Networks Limited logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Silver Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Silver Street, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Oct 2024 at 16:47.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Sep 2024 at 09:48.

South West Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Road Past Soldiers Hill House

South West Water were proposing to carry out Utility repair and maintenance works on Road Past Soldiers Hill House, Salcombe Regis.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Oct 2024 at 09:14.

BT logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Sep 2024 at 10:04.

BT logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Sep 2024 at 10:04.

South West Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Road Past Soldiers Hill House

South West Water are proposing to carry out Utility repair and maintenance works on Road Past Soldiers Hill House, Salcombe Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Oct 2024 at 13:16.

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Scalwell Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Scalwell Lane, Seaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Aug 2024 at 10:19.

BT logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Road Past Farway Countryside Park

BT are proposing to carry out Utility asset works on Road Past Farway Countryside Park, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Sep 2024 at 10:04.

BT logo
Between
9 and 14 Jan 2025
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Sep 2024 at 09:07.

South West Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lane To Combe Wood House

South West Water are proposing to carry out Utility repair and maintenance works on Lane To Combe Wood House, Salcombe Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Oct 2024 at 15:53.

Network Rail logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Road From Colyton Road To Orchard Close

Network Rail are proposing to carry out Works for Rail Purposes on Road From Colyton Road To Orchard Close, Whitford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Oct 2024 at 10:37.

South West Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Lane To Combe Wood House

South West Water were proposing to carry out Utility repair and maintenance works on Lane To Combe Wood House, Salcombe Regis.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Oct 2024 at 09:14.

South West Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Chapel Street

South West Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Sidbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 24 Oct 2024 at 12:11.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Road Past Farway Countryside Park

BT are proposing to carry out Utility asset works on Road Past Farway Countryside Park, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Sep 2024 at 11:46.

South West Water logo
Between
15 and 28 Jan 2025
Details
View Map
Share
Follow
New Street

South West Water are proposing to carry out Utility repair and maintenance works on New Street, Honiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 20 Sep 2024 at 10:01.

Devon County Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Sheppards Knap

Devon County Council are proposing to carry out Highway repair and maintenance works on Sheppards Knap, Dalwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Oct 2024 at 12:09.

South West Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Road From St Marys Church To Colwell Barton

South West Water are proposing to carry out Utility repair and maintenance works on Road From St Marys Church To Colwell Barton, Offwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Oct 2024 at 10:30.

South West Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Road Past Farway Countryside Park

South West Water are proposing to carry out Utility repair and maintenance works on Road Past Farway Countryside Park, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Sep 2024 at 13:58.

Western Power Distribution (South West) logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Dolphin Street

Western Power Distribution (South West) were proposing to carry out New service connection on Dolphin Street, Colyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 5 Nov 2024 at 10:22.

South West Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Offwell Cross To New Road Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road From Offwell Cross To New Road Cross, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Oct 2024 at 10:30.

Devon County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Sidmouth Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Sidmouth Road, Colyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 10 Oct 2024 at 14:00.

Devon County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Sidmouth Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Sidmouth Road, Colyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Oct 2024 at 09:28.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 8 Apr 2025
Details
View Map
Share
Follow
Seaton Down Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Seaton Down Road, Seaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 8 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Nov 2024 at 16:31.

Devon County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Northcote Hill

Devon County Council are proposing to carry out Highway repair and maintenance works on Northcote Hill, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 6 Nov 2024 at 14:27.

South West Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Road From St Marys Church To Colwell Barton

South West Water are proposing to carry out Utility repair and maintenance works on Road From St Marys Church To Colwell Barton, Offwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 15 Oct 2024 at 09:31.

Devon County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Old Chard Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Old Chard Road, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 6 Nov 2024 at 14:21.

Devon County Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Valley View

Devon County Council are proposing to carry out Highway repair and maintenance works on Valley View, Seaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 15 Aug 2024 at 10:11.

Devon County Council logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Berry Hill

Devon County Council are proposing to carry out Remedial works on Berry Hill, Beer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 29 Oct 2024 at 12:07.

South West Water logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
South Street

South West Water are proposing to carry out Utility repair and maintenance works on South Street, Colyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 15:03.

Wales And West Utilities logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Scalwell Lane

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Scalwell Lane, Seaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Nov 2024 at 14:19.

Wales And West Utilities logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Scalwell Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Scalwell Lane, Seaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Nov 2024 at 14:35.

South West Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Road From Three Mariners Cross To Royal Oak Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road From Three Mariners Cross To Royal Oak Cross, Cotleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Nov 2024 at 13:13.


Roadworks Map near to Farway, COLYTON, EX24 6DG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 19:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Farway, COLYTON, EX24 6DG (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.