ROADWORKS SUMMARY
Sheepwash, BEAWORTHY, EX21 5NX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for EX21 5NX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Sheepwash, BEAWORTHY, EX21 5NX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Airband Community Internet logo
Between
14 and 23 Sep 2026
Details
View Map
Share
Road From Eastcombe Cross To South Yeo Cross

Airband Community Internet were proposing to carry out Utility asset works on Road From Eastcombe Cross To South Yeo Cross, Northlew.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 23 September 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Airband Community Internet on 3 Sep 2026 at 15:55.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Kingsmoor Cross To Narracott Cross

BT are proposing to carry out Utility asset works on Road From Kingsmoor Cross To Narracott Cross, Black Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 21 Aug 2026 at 12:16.

Devon County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Holsworthy Road

Devon County Council are carrying out Highway repair and maintenance works on Holsworthy Road, Hatherleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 07:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 14 Sep 2026 at 08:10.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Park Road

BT are carrying out Utility asset works on Park Road, Hatherleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:23 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Sep 2026 at 14:59.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
East Street

BT are proposing to carry out Utility asset works on East Street, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Aug 2026 at 14:57.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
South Street

BT are proposing to carry out Utility asset works on South Street, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Aug 2026 at 14:57.

BT logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Road From Hillmoor Cross To Long Cross

BT are proposing to carry out Utility asset works on Road From Hillmoor Cross To Long Cross, Black Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Aug 2026 at 12:15.

Western Power Distribution (South West) logo
Between
22 and 29 Sep 2026
Details
View Map
Share
Follow
South Street

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on South Street, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Jun 2026 at 14:01.

BT logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
East Street

BT are proposing to carry out Utility asset works on East Street, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Sep 2026 at 14:32.

BT logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
East Street

BT are proposing to carry out Utility asset works on East Street, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Sep 2026 at 16:07.

BT logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
South Street

BT are proposing to carry out Utility asset works on South Street, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Sep 2026 at 14:32.

BT logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
South Street

BT are proposing to carry out Utility asset works on South Street, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Sep 2026 at 16:04.

BT logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Road From Kingsmoor Cross To Narracott Cross

BT are proposing to carry out Utility asset works on Road From Kingsmoor Cross To Narracott Cross, Black Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 9 Sep 2026 at 14:37.

BT logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Road From Hillmoor Cross To Long Cross

BT are proposing to carry out Utility asset works on Road From Hillmoor Cross To Long Cross, Black Torrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Sep 2026 at 14:38.

Devon County Council logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
West Road

Devon County Council are proposing to carry out Section 50 on West Road, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 21 Aug 2026 at 10:12.

Devon County Council logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
West Road

Devon County Council are proposing to carry out Section 50 on West Road, Sheepwash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 10 Sep 2026 at 14:20.

Airband Community Internet logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Road From Path House To Brook Cottage

Airband Community Internet were proposing to carry out Utility asset works on Road From Path House To Brook Cottage, Northlew.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 1 November 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Airband Community Internet on 3 Sep 2026 at 15:55.

Airband Community Internet logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Road From Stone Barn To Eastcombe Cross

Airband Community Internet were proposing to carry out Utility asset works on Road From Stone Barn To Eastcombe Cross, Northlew.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 1 November 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Airband Community Internet on 3 Sep 2026 at 15:54.

Airband Community Internet logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Road From Stone Barn To Eastcombe Cross

Airband Community Internet were proposing to carry out Utility asset works on Road From Stone Barn To Eastcombe Cross, Northlew.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 1 November 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Airband Community Internet on 3 Sep 2026 at 15:54.

BT logo
Between
4 and 9 Nov 2026
Details
View Map
Share
Follow
Road From Golden Inn To Wagaford Bridge

BT are proposing to carry out Utility asset works on Road From Golden Inn To Wagaford Bridge, Highampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 9 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Sep 2026 at 09:06.

BT logo
Between
4 and 10 Nov 2026
Details
View Map
Share
Follow
Road From Golden Inn To Wagaford Bridge

BT are proposing to carry out Utility asset works on Road From Golden Inn To Wagaford Bridge, Highampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 10 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Aug 2026 at 16:56.

BT logo
Between
5 and 11 Nov 2026
Details
View Map
Share
Follow
Road From Filleighmoor Gate To Patchel Cross

BT are proposing to carry out Utility asset works on Road From Filleighmoor Gate To Patchel Cross, Petrockstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 11 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Aug 2026 at 14:46.

Devon County Council logo
Between
10 and 24 Nov 2026
Details
View Map
Share
Follow
Road Past Madworthy Cottage

Devon County Council are proposing to carry out Highway repair and maintenance works on Road Past Madworthy Cottage, Halwill Junction.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 18 Aug 2026 at 10:07.

Devon County Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Road Past Norley Farm

Devon County Council are proposing to carry out Section 50 on Road Past Norley Farm, Northlew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 18 Aug 2026 at 15:06.


Roadworks Map near to Sheepwash, BEAWORTHY, EX21 5NX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 21:06
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Sheepwash, BEAWORTHY, EX21 5NX (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MAJOR
  
EAST STREET 
(0.5 miles)
BT
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.5
Details
Share
Follow
2
BT logo
MAJOR
  
SOUTH STREET 
(0.5 miles)
BT
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.5
Details
Share
Follow