ROADWORKS SUMMARY
Exbourne, OKEHAMPTON, EX20 3RD
Introduction
View current and future planned roadworks and road closures for EX20 3RD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Exbourne, OKEHAMPTON, EX20 3RD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Today
Devon County Council are carrying out Highway repair and maintenance works on Road From Redpost Cross To Culm Cross, North Tawton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 08:15 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 6 Dec 2024 at 15:43.
11 Nov 2024 and 6 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Braeside To Summers Moor Cross, Winkleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 January 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Devon County Council on 31 Oct 2024 at 14:42.
9 and 27 Dec 2024
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Eggesford Road To Cadford Moor, Winkleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 4 Sep 2024 at 15:17.
9 and 27 Dec 2024
Devon County Council are proposing to carry out Highway repair and maintenance works on Eggesford Road, Winkleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 4 Sep 2024 at 15:14.
10 Jun 2025
Devon County Council are carrying out Highway repair and maintenance works on South Street, Hatherleigh.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 00:01 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 10 Dec 2024 at 15:55.
2 and 24 Jan 2025
South West Water were proposing to carry out Utility repair and maintenance works on Leaholes Avenue, Okehampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by South West Water on 8 Oct 2024 at 10:10.
2 and 24 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Leaholes Avenue, Okehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 9 Oct 2024 at 08:44.
2 and 24 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Leaholes Avenue, Okehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 12 Nov 2024 at 13:56.
6 and 17 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Coulson Cross To Cadditon Cross, Winkleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 3 Oct 2024 at 13:54.
6 and 17 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Redpost Cross To Culm Cross, North Tawton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 4 Oct 2024 at 12:02.
6 and 17 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Cadditon Cross To Redpost Cross, Bondleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 4 Oct 2024 at 12:03.
6 and 17 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Coulson Cross To Shoresgate Cross, Winkleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 3 Oct 2024 at 13:06.
6 and 17 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Summers Moor Cross To Shoresgate Cross, Bondleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 3 Oct 2024 at 12:53.
6 and 17 Jan 2025
Devon County Council were proposing to carry out Highway repair and maintenance works on Road From Braeside To Summers Moor Cross, Winkleigh.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 30 Oct 2024 at 10:46.
7 and 17 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Redpost Cross To Culm Cross, North Tawton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 2 Oct 2024 at 15:49.
13 Jan 2025 and 31 Mar 2026
Network Rail are proposing to carry out Works for Rail Purposes on Hameldown Business Park, Exeter Road Industrial Estate, Okehampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 25 Oct 2024 at 11:21.
13 and 31 Jan 2025
BT were proposing to carry out Utility asset works on Park Road, Hatherleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 29 Oct 2024 at 08:36.
13 and 31 Jan 2025
BT were proposing to carry out Utility asset works on Oakfield Road, Hatherleigh.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 29 Oct 2024 at 08:57.
13 and 31 Jan 2025
BT were proposing to carry out Utility asset works on Oakfield Road, Hatherleigh.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 15 Oct 2024 at 08:11.
13 Jan 2025 and 31 Mar 2026
Network Rail were proposing to carry out roadworks on Hameldown Business Park, Exeter Road Industrial Estate, Okehampton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 March 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 09:24.
13 and 31 Jan 2025
Devon County Council are proposing to carry out Highway improvement works on Exeter Road, Okehampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Devon County Council on 11 Dec 2024 at 09:18.
13 and 31 Jan 2025
Devon County Council are proposing to carry out Highway improvement works on Exeter Road, Okehampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Devon County Council on 4 Dec 2024 at 12:23.
13 and 31 Jan 2025
BT were proposing to carry out Utility asset works on Hatherleigh Footpath 12, Hatherleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 29 Oct 2024 at 08:49.
15 Jan 2025 and 2 Apr 2026
Network Rail are proposing to carry out Works for Rail Purposes on Hameldown Business Park, Exeter Road Industrial Estate, Okehampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 2 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 16:47.
27 Jan and 7 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Limehayes Road, Okehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 3 Dec 2024 at 15:21.
27 Jan and 14 Feb 2025
BT are proposing to carry out Utility asset works on Oakfield Road, Hatherleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 1 Nov 2024 at 16:02.
27 and 29 Jan 2025
BT were proposing to carry out Utility asset works on Park Road, Hatherleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 30 Oct 2024 at 09:44.
27 and 29 Jan 2025
BT are proposing to carry out Utility asset works on Park Road, Hatherleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 13 Nov 2024 at 12:49.
27 and 29 Jan 2025
BT are proposing to carry out Utility asset works on Park Road, Hatherleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 1 Nov 2024 at 16:01.
27 Jan and 14 Feb 2025
BT were proposing to carry out Utility asset works on Oakfield Road, Hatherleigh.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 30 Oct 2024 at 09:46.
27 Jan and 7 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Limehayes Road, Okehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 15 Oct 2024 at 12:58.
30 Jan and 4 Feb 2025
BT were proposing to carry out Utility asset works on Hatherleigh Footpath 12, Hatherleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 4 Nov 2024 at 13:46.
30 Jan and 4 Feb 2025
BT were proposing to carry out Utility asset works on Hatherleigh Footpath 12, Hatherleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 30 Oct 2024 at 09:46.
2 and 4 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on East Street, Okehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 14 Nov 2024 at 15:49.
2 and 4 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on East Street, Okehampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 February 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 30 Oct 2024 at 11:03.
3 and 28 Feb 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Redpost Cross To Culm Cross, North Tawton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 30 Oct 2024 at 16:00.
3 and 28 Feb 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Braeside To Summers Moor Cross, Winkleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 30 Oct 2024 at 15:59.
3 and 28 Feb 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Summers Moor Cross To Shoresgate Cross, Bondleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 30 Oct 2024 at 15:59.
3 and 28 Feb 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Coulson Cross To Shoresgate Cross, Winkleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 30 Oct 2024 at 15:59.
3 and 28 Feb 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Coulson Cross To Cadditon Cross, Winkleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 30 Oct 2024 at 15:59.
3 and 28 Feb 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Cadditon Cross To Redpost Cross, Bondleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 30 Oct 2024 at 15:59.
10 and 14 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Brightley Road, Okehampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Nov 2024 at 09:08.
10 and 14 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Road From Goldburn Cross To Knowle Bridge, Okehampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 1 Nov 2024 at 15:00.
10 and 14 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Road From Goldburn Cross To Knowle Bridge, Okehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Nov 2024 at 15:06.
10 and 14 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Brightley Road, Okehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Nov 2024 at 15:06.
10 and 14 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Road From Goldburn Cross To Knowle Bridge, Okehampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Nov 2024 at 09:09.
10 Feb and 7 Mar 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Braeside To Summers Moor Cross, Winkleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 8 Nov 2024 at 10:41.
10 and 14 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on North Road, Okehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Nov 2024 at 15:05.
10 and 14 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on North Road, Okehampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Nov 2024 at 09:06.
6 and 19 Mar 2025
BT are proposing to carry out Utility asset works on Road From Stoning Cross To Deckport Cross, Hatherleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Dec 2024 at 12:49.
9 and 28 Mar 2025
Devon County Council are proposing to carry out Highway improvement works on Exeter Road, Okehampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Devon County Council on 6 Dec 2024 at 11:38.
17 and 21 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Road From Belstone Corner Cross To Church Hill Cross, Sampford Courtenay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 9 Dec 2024 at 14:54.
Roadworks Map near to Exbourne, OKEHAMPTON, EX20 3RD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Exbourne, OKEHAMPTON, EX20 3RD (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.