ROADWORKS SUMMARY
Newcombe Close, OKEHAMPTON, EX20 1UG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Newcombe Close, EX20 1UG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Newcombe Close, OKEHAMPTON, EX20 1UG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Newcombe Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Between
13 Jan 2025 and 31 Mar 2026
Details
View Map
Share
Hameldown Business Park

Network Rail were proposing to carry out roadworks on Hameldown Business Park, Exeter Road Industrial Estate, Okehampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 March 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 09:24.

Network Rail logo
LONG TERM
Between
15 Jan 2025 and 2 Apr 2026
Details
View Map
Share
Follow
Hameldown Business Park

Network Rail are proposing to carry out Works for Rail Purposes on Hameldown Business Park, Exeter Road Industrial Estate, Okehampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 2 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 16:47.

Network Rail logo
LONG TERM
Until
9 Apr 2026
Details
View Map
Share
Follow
Hameldown Business Park

Network Rail are carrying out Works for Rail Purposes on Hameldown Business Park, Exeter Road Industrial Estate, Okehampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:00 and could run through until 9 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Jan 2025 at 08:09.

Wales And West Utilities logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Ashley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Ashley Road, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 31 Jan 2025 at 15:18.

Wales And West Utilities logo
LONG TERM
Today
Details
View Map
Share
Ashley Road

Wales And West Utilities carried out Utility repair and maintenance works on Ashley Road, Okehampton.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 28 Apr 2025 and 3 Jun 2025 and were actually completed between 28 Apr 2025 (08:00) and 3 Jun 2025 (11:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Jun 2025 at 11:59.

Wales And West Utilities logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Ashley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Ashley Road, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 4 Feb 2025 at 15:31.

Devon County Council logo
Finishing
Friday
Details
View Map
Share
Road Past Fatherford Farm

Devon County Council were proposing to carry out Highway repair and maintenance works on Road Past Fatherford Farm, Stockley.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 28 May 2025 at 13:51.

Devon County Council logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Tavistock Road

Devon County Council were proposing to carry out Highway repair and maintenance works on Tavistock Road, Meldon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 June 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 12 Mar 2025 at 15:54.

Devon County Council logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Tavistock Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Tavistock Road, Meldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Mar 2025 at 17:16.

Devon County Council logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Limehayes Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Limehayes Road, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 12 Mar 2025 at 14:03.

BT logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Tors Road

BT are proposing to carry out Utility asset works on Tors Road, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Mar 2025 at 11:52.

BT logo
Between
12 and 16 Jun 2025
Details
View Map
Share
Follow
Road Past Five Oaks Cottage

BT are proposing to carry out Utility asset works on Road Past Five Oaks Cottage, Folly Gate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 28 May 2025 at 13:32.

BT logo
Between
12 and 16 Jun 2025
Details
View Map
Share
Follow
Road Past Five Oaks Cottage

BT are proposing to carry out Utility asset works on Road Past Five Oaks Cottage, Folly Gate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Mar 2025 at 10:25.

Devon County Council logo
Between
17 and 21 Jun 2025
Details
View Map
Share
Follow
Road From Tongue End Cross To Eagle House

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Tongue End Cross To Eagle House, Belstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 27 May 2025 at 16:28.

BT logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Road From Dornaford Cross To Stonewold

BT are proposing to carry out Utility asset works on Road From Dornaford Cross To Stonewold, Sampford Courtenay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Mar 2025 at 16:03.

BT logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Road From Dornaford Cross To Stonewold

BT are proposing to carry out Utility asset works on Road From Dornaford Cross To Stonewold, Sampford Courtenay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 Mar 2025 at 15:02.

Devon County Council logo
Between
30 Jun and 12 Jul 2025
Details
View Map
Share
Road From Exbourne Cross To Solland Cross

Devon County Council were proposing to carry out Highway repair and maintenance works on Road From Exbourne Cross To Solland Cross, Exbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 12 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Devon County Council on 15 Apr 2025 at 10:00.

Devon County Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Road From Skaigh Lodge To Ladywell

Devon County Council are proposing to carry out Section 50 on Road From Skaigh Lodge To Ladywell, Sticklepath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 8 Apr 2025 at 16:03.

Devon County Council logo
Between
11 and 15 Jul 2025
Details
View Map
Share
Follow
Tavistock Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Tavistock Road, Meldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 1 Apr 2025 at 10:33.

Wales And West Utilities logo
LONG TERM
Between
28 Jul and 6 Oct 2025
Details
View Map
Share
Follow
Exeter Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Exeter Road, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Apr 2025 at 09:36.

Devon County Council logo
Between
30 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Road From Oaklands Farm To Itton Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Oaklands Farm To Itton Cross, North Tawton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 10 Apr 2025 at 13:11.

South West Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Market Street

South West Water were proposing to carry out Utility repair and maintenance works on Market Street, Okehampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 6 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 7 May 2025 at 08:18.

South West Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Market Street

South West Water were proposing to carry out Utility repair and maintenance works on Market Street, Okehampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 6 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 6 May 2025 at 08:44.

South West Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Market Street

South West Water were proposing to carry out Utility repair and maintenance works on Market Street, Okehampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 6 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 6 May 2025 at 08:43.

South West Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Kempley Road

South West Water are proposing to carry out Utility repair and maintenance works on Kempley Road, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 30 Apr 2025 at 14:02.

Wales And West Utilities logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Tors Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Tors Road, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 12 May 2025 at 09:13.

BT logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Road From Town End Cross To Bude Moor Cross

BT are proposing to carry out Utility asset works on Road From Town End Cross To Bude Moor Cross, Exbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 May 2025 at 09:06.

BT logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Road From Town End Cross To Bude Moor Cross

BT are proposing to carry out Utility asset works on Road From Town End Cross To Bude Moor Cross, Exbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 8 May 2025 at 12:07.

BT logo
Between
13 and 26 Aug 2025
Details
View Map
Share
Follow
Road From Glendon Cross To Crossways Cross

BT are proposing to carry out Utility asset works on Road From Glendon Cross To Crossways Cross, Stockley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 26 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 May 2025 at 16:23.

BT logo
Between
13 and 26 Aug 2025
Details
View Map
Share
Follow
Road From Barton Barn Farm To Chichacott Cross

BT are proposing to carry out Utility asset works on Road From Barton Barn Farm To Chichacott Cross, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 26 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 May 2025 at 16:23.

BT logo
Between
13 and 26 Aug 2025
Details
View Map
Share
Follow
Road From Chichacott Cross To Appledore Bridge

BT are proposing to carry out Utility asset works on Road From Chichacott Cross To Appledore Bridge, Stockley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 26 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 May 2025 at 16:23.

BT logo
Between
13 and 26 Aug 2025
Details
View Map
Share
Follow
Road From Chichacott Cross To Glendon Farm

BT are proposing to carry out Utility asset works on Road From Chichacott Cross To Glendon Farm, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 26 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 May 2025 at 16:23.

BT logo
Between
13 and 26 Aug 2025
Details
View Map
Share
Follow
Road From Crediton Road To Chichacott Cross

BT are proposing to carry out Utility asset works on Road From Crediton Road To Chichacott Cross, Okehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 26 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 20 May 2025 at 16:23.


Roadworks Map near to Newcombe Close, OKEHAMPTON, EX20 1UG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Newcombe Close, OKEHAMPTON, EX20 1UG (13 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
FERN MEADOW 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
3 Jun 2025 09:50 - 13:12
0.3
Details
Share
2
Devon County Council logo
EMERGENCY
  
ROAD PAST FATHERFORD FARM 
(0.4 miles)
Devon County Council
Highway repair and maintenance works - Carriageway - Two-way signals
Cancelled
(Scheduled: 28 May 2025 - 6 Jun 2025)
0.4
Details
Share
3
Network Rail logo
MAJOR
  
HAMELDOWN BUSINESS PARK, EXETER ROAD INDUSTRIAL ESTATE 
(0.5 miles)
Network Rail
Works for Rail Purposes - Carriageway - Multi-way signals
In Progress
Since: 20 Jan 2025 08:00
(Scheduled: 20 Jan 2025 - 9 Apr 2026)
0.5
Details
Share
Follow
4
Network Rail logo
MAJOR
  
HAMELDOWN BUSINESS PARK, EXETER ROAD INDUSTRIAL ESTATE 
(0.5 miles)
Network Rail
Works for Rail Purposes - Carriageway - Multi-way signals
Planned
Scheduled: 15 Jan 2025 - 2 Apr 2026
0.5
Details
Share
Follow
5
Network Rail logo
MAJOR
  
HAMELDOWN BUSINESS PARK, EXETER ROAD INDUSTRIAL ESTATE 
(0.5 miles)
Network Rail
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Multi-way signals
Cancelled
(Scheduled: 13 Jan 2025 - 31 Mar 2026)
0.5
Details
Share
6
Wales And West Utilities logo
MAJOR
  
ASHLEY ROAD 
(0.5 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 28 Apr 2025 - 3 Jun 2025
0.5
Details
Share
Follow
7
Wales And West Utilities logo
MAJOR
  
ASHLEY ROAD 
(0.5 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
Complete
28 Apr 2025 08:00 - 3 Jun 2025 11:00
0.5
Details
Share
8
Wales And West Utilities logo
MAJOR
  
ASHLEY ROAD 
(0.5 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 28 Apr 2025 - 3 Jun 2025
0.5
Details
Share
Follow
9
Devon County Council logo
URGENT
  
ROAD PAST FATHERFORD FARM 
(0.5 miles)
Devon County Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 28 May 2025 12:00
(Scheduled: 28 May 2025 - 4 Jun 2025)
0.5
Details
Share
Follow
10
Wales And West Utilities logo
MAJOR
  
SIMMONS WAY 
(0.6 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 22 Apr 2025 - 26 Nov 2025)
0.6
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.