ROADWORKS SUMMARY
Tedders Close, CULLOMPTON, EX15 3XD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Tedders Close, EX15 3XD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Tedders Close, CULLOMPTON, EX15 3XD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tedders Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Somerset County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Smokem Lane

Somerset County Council are carrying out Highway repair and maintenance works on Smokem Lane, Pitminster, Taunton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 13:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 31 Jan 2025 at 12:11.

Devon County Council logo
LONG TERM
Until
17 Apr 2025
Details
View Map
Share
Follow
Road From Turbury Cross To Wolford Cross

Devon County Council are carrying out Highway repair and maintenance works on Road From Turbury Cross To Wolford Cross, Dunkeswell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 12:00 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 16 Jan 2025 at 14:37.

Somerset County Council logo
LONG TERM
Between
30 Jan and 31 Mar 2025
Details
View Map
Share
Smokem Lane

Somerset County Council were proposing to carry out Highway repair and maintenance works on Smokem Lane, Pitminster, Taunton.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 31 Jan 2025 at 11:20.

Devon County Council logo
LONG TERM
Between
1 Feb and 1 Dec 2025
Details
View Map
Share
Follow
Clay Lane

Devon County Council are proposing to carry out Works for road purposes on Clay Lane, Uffculme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 4 Nov 2024 at 12:54.

Devon County Council logo
Between
5 Feb and 5 Mar 2025
Details
View Map
Share
Clay Lane

Devon County Council were proposing to carry out Works for road purposes on Clay Lane, Uffculme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 5 March 2025. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Devon County Council on 31 Oct 2024 at 08:15.

Devon County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Culmbridge Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Culmbridge Road, Hemyock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 5 Dec 2024 at 11:21.

Wessex Water logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Budleigh Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Budleigh Road, Pitminster, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Dec 2024 at 15:28.

Wessex Water logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Budleigh Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Budleigh Road, Pitminster, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Dec 2024 at 08:32.

Somerset County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
The Holloway

Somerset County Council are proposing to carry out Highway repair and maintenance works on The Holloway, Wellington Without, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 16 Jan 2025 at 10:26.

Wessex Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
South Street

Wessex Water are proposing to carry out Utility repair and maintenance works on South Street, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Jan 2025 at 12:17.

Gigaclear logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Bridge Street

Gigaclear were proposing to carry out Utility asset works on Bridge Street, Uffculme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 23 Dec 2024 at 15:13.

Wessex Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
South Street

Wessex Water are proposing to carry out Utility repair and maintenance works on South Street, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Dec 2024 at 12:46.

Somerset County Council logo
LONG TERM
Between
1 Apr and 27 Sep 2025
Details
View Map
Share
Follow
Sawyers Hill

Somerset County Council are proposing to carry out Highway improvement works on Sawyers Hill, West Buckland, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 3 Nov 2023 at 10:22.

Somerset County Council logo
LONG TERM
Between
1 Apr and 27 Sep 2025
Details
View Map
Share
Follow
M5 J26 Leave S

Somerset County Council are proposing to carry out Highway improvement works on M5 J26 Leave S, Taunton Deane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 30 Nov 2023 at 16:30.

Somerset County Council logo
LONG TERM
Between
1 Apr and 27 Sep 2025
Details
View Map
Share
Follow
M5 J26 Join S

Somerset County Council are proposing to carry out Highway improvement works on M5 J26 Join S, Taunton Deane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 30 Nov 2023 at 16:30.

Somerset County Council logo
LONG TERM
Between
1 Apr and 27 Sep 2025
Details
View Map
Share
Follow
Gerbestone Road

Somerset County Council are proposing to carry out Highway improvement works on Gerbestone Road, West Buckland, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 3 Nov 2023 at 10:22.

Somerset County Council logo
LONG TERM
Between
1 Apr and 27 Sep 2025
Details
View Map
Share
Follow
M5 J26 Leave N

Somerset County Council are proposing to carry out Highway improvement works on M5 J26 Leave N, Taunton Deane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 30 Nov 2023 at 16:30.

Somerset County Council logo
LONG TERM
Between
1 Apr and 27 Sep 2025
Details
View Map
Share
Follow
M5 J26 Join N

Somerset County Council are proposing to carry out Highway improvement works on M5 J26 Join N, Taunton Deane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 30 Nov 2023 at 16:30.

Somerset County Council logo
LONG TERM
Between
1 Apr and 27 Sep 2025
Details
View Map
Share
Follow
Chelston Interchange

Somerset County Council are proposing to carry out Highway improvement works on Chelston Interchange, West Buckland, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 3 Nov 2023 at 10:22.

Somerset County Council logo
LONG TERM
Between
1 Apr and 27 Sep 2025
Details
View Map
Share
Follow
Chelston Link

Somerset County Council are proposing to carry out Highway improvement works on Chelston Link, West Buckland, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 3 Nov 2023 at 10:21.

Somerset County Council logo
Between
4 and 8 Apr 2025
Details
View Map
Share
Follow
The Holloway

Somerset County Council are proposing to carry out Highway repair and maintenance works on The Holloway, Wellington Without, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 5 Feb 2025 at 14:39.

BT logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Blackdown Hill Road

BT are proposing to carry out Utility asset works on Blackdown Hill Road, West Buckland, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 26 Nov 2024 at 15:54.

Western Power Distribution (South West) logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Culmstock Road

Western Power Distribution (South West) were proposing to carry out New service connection on Culmstock Road, Hemyock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 6 Feb 2025 at 15:05.

Western Power Distribution (South West) logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Culmstock Road

Western Power Distribution (South West) were proposing to carry out New service connection on Culmstock Road, Hemyock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Dec 2024 at 09:01.

Gigaclear logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
Bridge Street

Gigaclear are proposing to carry out Utility asset works on Bridge Street, Uffculme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 9 Jan 2025 at 13:01.

Gigaclear logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Bridge Street

Gigaclear were proposing to carry out Utility asset works on Bridge Street, Uffculme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 12 Feb 2025 at 11:54.

Wessex Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Sampford Moor Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Sampford Moor Road, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Jan 2025 at 08:22.

Wessex Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Sampford Moor Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Sampford Moor Road, Wellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Jan 2025 at 09:06.

Western Power Distribution (South West) logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Road From Three Elms To Oak View

Western Power Distribution (South West) are proposing to carry out New service connection on Road From Three Elms To Oak View, Uffculme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 15 Jan 2025 at 16:43.

Western Power Distribution (South West) logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Road From Three Elms To Oak View

Western Power Distribution (South West) are proposing to carry out New service connection on Road From Three Elms To Oak View, Uffculme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 10 Feb 2025 at 11:30.

Devon County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Road Heading North From Ashleigh House

Devon County Council are proposing to carry out Highway repair and maintenance works on Road Heading North From Ashleigh House, Ashill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 9 Jan 2025 at 11:19.

Devon County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Road Heading North From Ashleigh House

Devon County Council are proposing to carry out Highway repair and maintenance works on Road Heading North From Ashleigh House, Ashill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 9 Jan 2025 at 12:56.

Devon County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Road From Cemetery Corner Cross To Twenty Acres Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Cemetery Corner Cross To Twenty Acres Cross, Uffculme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 9 Jan 2025 at 11:17.

Devon County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Road From Cemetery Corner Cross To Twenty Acres Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Cemetery Corner Cross To Twenty Acres Cross, Uffculme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 9 Jan 2025 at 12:56.

Gigaclear logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Kitwell Street

Gigaclear are proposing to carry out Utility asset works on Kitwell Street, Uffculme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 31 Jan 2025 at 16:44.

South West Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Road From Smithincott To Yew Wood Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road From Smithincott To Yew Wood Cross, Smithincott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 9 Jan 2025 at 11:52.


Roadworks Map near to Tedders Close, CULLOMPTON, EX15 3XD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 15 Feb 2025 19:29
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Tedders Close, CULLOMPTON, EX15 3XD (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.