ROADWORKS SUMMARY
Queen Street, HONITON, EX14 2HG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Queen Street, EX14 2HG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Queen Street, HONITON, EX14 2HG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Queen Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Devon County Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Hayne Lane

Devon County Council are carrying out Highway repair and maintenance works on Hayne Lane, Wilmington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 July 2024 at 08:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 24 Sep 2024 at 11:19.

Devon County Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Road From Esantee To Chineway Cottage

Devon County Council are carrying out Highway repair and maintenance works on Road From Esantee To Chineway Cottage, Ottery St Mary.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 2 Sep 2024 at 08:20.

Devon County Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Sidmouth Road

Devon County Council are carrying out Highway repair and maintenance works on Sidmouth Road, Honiton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 10 Oct 2024 at 11:33.

Devon County Council logo
LONG TERM
Between
5 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road From Pattesons To Higher Gosford Farm

Devon County Council are proposing to carry out Section 50 on Road From Pattesons To Higher Gosford Farm, Feniton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 7 Aug 2024 at 10:47.

Devon County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Station Road

Devon County Council are carrying out Section 50 on Station Road, Feniton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Devon County Council on 21 Nov 2024 at 09:54.

Wales And West Utilities logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Streamers Meadows

Wales And West Utilities are carrying out Utility repair and maintenance works on Streamers Meadows, Honiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 10:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Nov 2024 at 14:11.

South West Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Road From Cotleigh Cross To Broadhayes Cross

South West Water are carrying out Utility repair and maintenance works on Road From Cotleigh Cross To Broadhayes Cross, Cotleigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 02:20 and could run through until 28 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 25 Nov 2024 at 09:20.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Sep 2024 at 11:58.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Percy Cross To Wolford Cross

BT are proposing to carry out Utility asset works on Road From Percy Cross To Wolford Cross, Dunkeswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 23 Aug 2024 at 15:04.

Wales And West Utilities logo
Finishing
Friday
Details
View Map
Share
Follow
Chineway Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Chineway Road, Ottery St Mary.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:27 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 09:27.

Wales And West Utilities logo
Finishing
Friday
Details
View Map
Share
Follow
Chineway Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Chineway Road, Ottery St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 23 Aug 2024 at 11:33.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 09:59.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Suddons Lane

BT are carrying out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:30 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Nov 2024 at 09:30.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Aug 2024 at 13:04.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Sep 2024 at 11:27.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Sep 2024 at 11:58.

BT logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 09:59.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 10:43.

South West Water logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Honiton Bottom Road

South West Water are proposing to carry out Utility repair and maintenance works on Honiton Bottom Road, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South West Water on 30 Aug 2024 at 12:02.

South West Water logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Honiton Bottom Road

South West Water are proposing to carry out Utility repair and maintenance works on Honiton Bottom Road, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 09:22.

South West Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Road From Main Road To Eveleigh Farm

South West Water were proposing to carry out Utility repair and maintenance works on Road From Main Road To Eveleigh Farm, Gittisham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 23 Sep 2024 at 14:09.

South West Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Road From Main Road To Eveleigh Farm

South West Water were proposing to carry out Utility repair and maintenance works on Road From Main Road To Eveleigh Farm, Gittisham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Sep 2024 at 09:34.

BT logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Road From Percy Cross To Wolford Cross

BT are proposing to carry out Utility asset works on Road From Percy Cross To Wolford Cross, Dunkeswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Aug 2024 at 11:31.

BT logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Road From Percy Cross To Wolford Cross

BT were proposing to carry out Utility asset works on Road From Percy Cross To Wolford Cross, Dunkeswell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 Oct 2024 at 15:28.

South West Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Road From Buckerell Cross To Barton Rise

South West Water were proposing to carry out Utility repair and maintenance works on Road From Buckerell Cross To Barton Rise, Feniton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 23 Aug 2024 at 10:19.

South West Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Road From Buckerell Cross To Barton Rise

South West Water were proposing to carry out Utility repair and maintenance works on Road From Buckerell Cross To Barton Rise, Feniton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 23 Aug 2024 at 10:27.

South West Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Road From Buckerell Cross To Barton Rise

South West Water were proposing to carry out Utility repair and maintenance works on Road From Buckerell Cross To Barton Rise, Feniton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 26 Aug 2024 at 08:43.

Nexfibre Networks Limited logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Sep 2024 at 10:21.

Nexfibre Networks Limited logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 08:49.

Nexfibre Networks Limited logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Silver Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Silver Street, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 10:55.

Devon County Council logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Follow
Northcote Hill

Devon County Council are proposing to carry out Highway repair and maintenance works on Northcote Hill, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Sep 2024 at 14:17.

Devon County Council logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Follow
Old Chard Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Old Chard Road, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Sep 2024 at 14:15.

Nexfibre Networks Limited logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 14:32.

Devon County Council logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Follow
Road From Three Mariners Cross To Royal Oak Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Three Mariners Cross To Royal Oak Cross, Cotleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Sep 2024 at 14:12.

Nexfibre Networks Limited logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 19 Sep 2024 at 14:12.

Nexfibre Networks Limited logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 20 Sep 2024 at 10:42.

Nexfibre Networks Limited logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Follow
Queen Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Queen Street, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Oct 2024 at 16:07.

Nexfibre Networks Limited logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Queen Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Queen Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 20 Sep 2024 at 09:17.

Nexfibre Networks Limited logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Queen Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Queen Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 18 Sep 2024 at 14:13.

Nexfibre Networks Limited logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Sep 2024 at 11:01.

Nexfibre Networks Limited logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Sep 2024 at 12:05.

Nexfibre Networks Limited logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Silver Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Silver Street, Honiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Sep 2024 at 13:08.

Devon County Council logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Nags Head Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Nags Head Road, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 26 Sep 2024 at 09:37.

Devon County Council logo
Between
2 and 12 Jan 2025
Details
View Map
Share
Follow
Road From Limers Cross To Luppitt Common

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Limers Cross To Luppitt Common, Dunkeswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 25 Sep 2024 at 15:05.

BT logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Sep 2024 at 10:04.

Devon County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Road From Pattesons To Higher Gosford Farm

Devon County Council are proposing to carry out Section 50 on Road From Pattesons To Higher Gosford Farm, Feniton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 9 Oct 2024 at 13:10.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Suddons Lane

BT are proposing to carry out Utility asset works on Suddons Lane, Northleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Sep 2024 at 09:48.

Nexfibre Networks Limited logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Silver Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Silver Street, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Oct 2024 at 16:47.

BT logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Sep 2024 at 10:04.

South West Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Road From Curscombe Cross To Penscombe

South West Water are proposing to carry out Permanent reinstatement on Road From Curscombe Cross To Penscombe, Buckerell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Sep 2024 at 08:59.

South West Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Road From Curscombe Cross To Penscombe

South West Water are proposing to carry out Permanent reinstatement on Road From Curscombe Cross To Penscombe, Buckerell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Oct 2024 at 16:49.

BT logo
Between
9 and 14 Jan 2025
Details
View Map
Share
Follow
Road Past Scruell Barton Farm

BT are proposing to carry out Utility asset works on Road Past Scruell Barton Farm, Southleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Sep 2024 at 09:07.

Devon County Council logo
LONG TERM
Between
9 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Station Road

Devon County Council are proposing to carry out Section 50 on Station Road, Feniton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Devon County Council on 9 Sep 2024 at 13:59.

South West Water logo
Between
15 and 28 Jan 2025
Details
View Map
Share
Follow
New Street

South West Water are proposing to carry out Utility repair and maintenance works on New Street, Honiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 20 Sep 2024 at 10:01.

South West Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Offwell Cross To New Road Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road From Offwell Cross To New Road Cross, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Oct 2024 at 10:30.

South West Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Road From St Marys Church To Colwell Barton

South West Water are proposing to carry out Utility repair and maintenance works on Road From St Marys Church To Colwell Barton, Offwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Oct 2024 at 10:30.

Devon County Council logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Road From Turbury Cross To Wolford Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Turbury Cross To Wolford Cross, Dunkeswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 27 Sep 2024 at 15:17.

Devon County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Northcote Hill

Devon County Council are proposing to carry out Highway repair and maintenance works on Northcote Hill, Honiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 6 Nov 2024 at 14:27.

Devon County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Old Chard Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Old Chard Road, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 6 Nov 2024 at 14:21.

Devon County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Road From Three Mariners Cross To Royal Oak Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Three Mariners Cross To Royal Oak Cross, Cotleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 6 Nov 2024 at 14:11.

South West Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Road From St Marys Church To Colwell Barton

South West Water are proposing to carry out Utility repair and maintenance works on Road From St Marys Church To Colwell Barton, Offwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 15 Oct 2024 at 09:31.

South West Water logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
The Signals

South West Water are proposing to carry out Utility repair and maintenance works on The Signals, Feniton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 24 Oct 2024 at 10:34.

Western Power Distribution (South West) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Gosford Lane

Western Power Distribution (South West) are proposing to carry out New service connection on Gosford Lane, Taleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 6 Nov 2024 at 12:10.

Western Power Distribution (South West) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Gosford Lane

Western Power Distribution (South West) are proposing to carry out New service connection on Gosford Lane, Taleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 14:41.

South West Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Road From Three Mariners Cross To Royal Oak Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road From Three Mariners Cross To Royal Oak Cross, Cotleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Nov 2024 at 13:13.


Roadworks Map near to Queen Street, HONITON, EX14 2HG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 05:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Queen Street, HONITON, EX14 2HG (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (South West) logo
JERRARD CLOSE 
(0.1 miles)
Western Power Distribution (South West)
New service connection - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 25 Nov 2024 - 29 Nov 2024)
0.1
Details
Share
2
Wales And West Utilities logo
KING STREET 
(0.2 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 20 Nov 2024 11:40
(Scheduled: 20 Nov 2024 - 27 Nov 2024)
0.2
Details
Share
Follow
3
BT logo
HIGH STREET 
(0.2 miles)
BT
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Nov 2024 - 28 Nov 2024
0.2
Details
Share
Follow
4
Wales And West Utilities logo
MAJOR
  
STREAMERS MEADOWS 
(0.2 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 15 Nov 2024 10:00
(Scheduled: 11 Nov 2024 - 31 Dec 2024)
0.2
Details
Share
Follow
5
Wales And West Utilities logo
EMERGENCY
  
A35 FROM J A30 NORTH OF HONITON TO J B3261 WEST OF AXMINSTER 
(0.3 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 23 Nov 2024 14:25
(Scheduled: 23 Nov 2024 - 29 Nov 2024)
0.3
Details
Share
Follow
6
Wales And West Utilities logo
MAJOR
  
LOWER BRAND LANE 
(0.3 miles)
Wales And West Utilities
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 15 Nov 2024 10:00
(Scheduled: 11 Nov 2024 - 7 Jan 2025)
0.3
Details
Share
Follow
7
BT logo
LACE WALK 
(0.4 miles)
BT
Utility asset works - Footway - Multi-way signals
In Progress
Since: 25 Nov 2024 10:54
(Scheduled: 25 Nov 2024 - 29 Nov 2024)
0.4
Details
Share
Follow
8
BT logo
ARGUS CLOSE 
(0.4 miles)
BT
Utility repair and maintenance works - Footway, Footpath - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 29 Nov 2024
0.4
Details
Share
Follow
9
BT logo
URGENT
  
ROSEWELL CLOSE 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
25 Nov 2024 08:58 - 18:00
0.4
Details
Share
10
BT logo
BUTTERY ROAD 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
25 Nov 2024 09:41 - 11:36
0.4
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.