ROADWORKS SUMMARY
Woodcock Way, AXMINSTER, EX13 7SY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Woodcock Way, EX13 7SY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Woodcock Way, AXMINSTER, EX13 7SY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woodcock Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Devon County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Castle Street

Devon County Council are carrying out Highway repair and maintenance works on Castle Street, Axminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2022 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 30 Aug 2024 at 09:37.

Somerset County Council logo
LONG TERM
Between
1 Jul and 20 Dec 2024
Details
View Map
Share
Chaffcombe Road

Somerset County Council were proposing to carry out Remedial works on Chaffcombe Road, Chard.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 17 Oct 2024 at 10:47.

Dorset Council logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
B3165 Hawkmoor Hill To Fishpond Bottom Road

Dorset Council are carrying out Highway improvement works on B3165 Hawkmoor Hill To Fishpond Bottom Road, Whitchurch Canonicorum.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2024 at 10:32 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 27 Sep 2024 at 16:15.

South West Water logo
Finishing
Monday
Details
View Map
Share
Follow
Road From The War Memorial To Brimley Cross

South West Water are carrying out Utility repair and maintenance works on Road From The War Memorial To Brimley Cross, Hawkchurch.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 14:01 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 21 Nov 2024 at 11:52.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Furzehill

Wales And West Utilities are carrying out Utility repair and maintenance works on Furzehill, Chard.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 18 Nov 2024 at 09:12.

South West Water logo
Finishing
Monday
Details
View Map
Share
Follow
Knights Lane

South West Water are carrying out Utility repair and maintenance works on Knights Lane, All Saints.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:02 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Nov 2024 at 12:24.

Somerset County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
East Street

Somerset County Council were proposing to carry out Highway repair and maintenance works on East Street, Chard.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 16 Oct 2024 at 15:33.

Somerset County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
East Street

Somerset County Council are proposing to carry out Highway repair and maintenance works on East Street, Chard.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 4 Oct 2024 at 15:32.

Somerset County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
East Street

Somerset County Council are proposing to carry out Highway repair and maintenance works on East Street, Chard.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 15 Oct 2024 at 11:31.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Road From Badgers Rest To Weycroft Bridge

BT are proposing to carry out Utility asset works on Road From Badgers Rest To Weycroft Bridge, Smallridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Oct 2024 at 13:22.

Somerset County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
East Street

Somerset County Council are proposing to carry out Highway repair and maintenance works on East Street, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 16 Oct 2024 at 15:55.

Somerset County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
East Street

Somerset County Council are proposing to carry out Highway repair and maintenance works on East Street, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 21 Oct 2024 at 14:44.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Road From Cranborne Cross To Badgers Rest

BT are proposing to carry out Utility asset works on Road From Cranborne Cross To Badgers Rest, Smallridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Oct 2024 at 13:22.

South West Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Cooks Lane

South West Water are proposing to carry out Utility repair and maintenance works on Cooks Lane, Raymonds Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 31 Oct 2024 at 16:35.

South West Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Cooks Lane

South West Water are proposing to carry out Utility repair and maintenance works on Cooks Lane, Raymonds Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 21 Aug 2024 at 09:08.

South West Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Sector Lane

South West Water are proposing to carry out Utility repair and maintenance works on Sector Lane, Axminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 09:29.

South West Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Sector Lane

South West Water are proposing to carry out Utility repair and maintenance works on Sector Lane, Axminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 23 Aug 2024 at 08:23.

Wales And West Utilities logo
LONG TERM
Between
2 Jan and 6 Jun 2025
Details
View Map
Share
Follow
Furnham Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Furnham Road, Chard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Sep 2024 at 16:28.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Road From Cranborne Cross To Badgers Rest

BT are proposing to carry out Utility asset works on Road From Cranborne Cross To Badgers Rest, Smallridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Oct 2024 at 10:41.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Road From Badgers Rest To Weycroft Bridge

BT are proposing to carry out Utility asset works on Road From Badgers Rest To Weycroft Bridge, Smallridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Oct 2024 at 10:41.

Wessex Water logo
Between
7 and 31 Jan 2025
Details
View Map
Share
Follow
Victoria Avenue

Wessex Water are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 14 Jun 2024 at 13:38.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Road From Cranborne Cross To Badgers Rest

BT are proposing to carry out Utility asset works on Road From Cranborne Cross To Badgers Rest, Smallridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Oct 2024 at 14:50.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Road From Badgers Rest To Weycroft Bridge

BT are proposing to carry out Utility asset works on Road From Badgers Rest To Weycroft Bridge, Smallridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Oct 2024 at 14:50.

Wales And West Utilities logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Avishayes Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Avishayes Road, Chard.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 11:50.

Wales And West Utilities logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Henson Park

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Henson Park, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Oct 2024 at 15:34.

Wessex Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Ammerham Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Ammerham Lane, Winsham, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 31 Oct 2024 at 14:39.

Wessex Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Ammerham Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Ammerham Lane, Winsham, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 6 Nov 2024 at 11:32.

Wales And West Utilities logo
LONG TERM
Between
20 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Avishayes Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Avishayes Road, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Oct 2024 at 15:34.

Western Power Distribution (South West) logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Road Past Battens Farm

Western Power Distribution (South West) were proposing to carry out Utility asset works on Road Past Battens Farm, Stockland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 8 Nov 2024 at 09:34.

Western Power Distribution (South West) logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Road Past Battens Farm

Western Power Distribution (South West) were proposing to carry out Utility asset works on Road Past Battens Farm, Stockland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Oct 2024 at 17:21.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Holway

BT are proposing to carry out Utility asset works on Holway, Tatworth, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 15 Nov 2024 at 14:34.

Wessex Water logo
LONG TERM
Between
27 Jan and 9 May 2025
Details
View Map
Share
Follow
Furnham Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Furnham Road, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 14 Jun 2024 at 13:37.

Wessex Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Stoopers Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Stoopers Hill, Combe St Nicholas, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Oct 2024 at 10:16.

Wessex Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Underway

Wessex Water are proposing to carry out Utility repair and maintenance works on Underway, Combe St Nicholas, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 4 Nov 2024 at 11:32.

Western Power Distribution (South West) logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Road Past Battens Farm

Western Power Distribution (South West) were proposing to carry out Utility asset works on Road Past Battens Farm, Stockland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Nov 2024 at 10:08.


Roadworks Map near to Woodcock Way, AXMINSTER, EX13 7SY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 11:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Woodcock Way, AXMINSTER, EX13 7SY (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.