ROADWORK EVENT SUMMARY
Cross Turner Street, Sheffield between 5 Oct 2020 and 4 Dec 2024

For local roadworks happening in your street and local area, enter your postcode for a detailed report
Type your postcode

Works Description for Cross Turner Street, Sheffield

Sheffield City Council are carrying out Utility asset works on Cross Turner Street, Sheffield.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 5 October 2020 at 09:55 and could run through until 4 December 2024. The works will impact the footway only.

The information for these works was last updated by Sheffield City Council on 20 November 2024 at 11:03.


Share
Follow

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Works Map for Cross Turner Street, Sheffield

Works Details

WORKS IN PROGRESS
Major
Sheffield City Council logo
These works are handled by:
Sheffield City Council
Sheffield City Council logo
Local Authority:
Sheffield City Council
Works Reference LC10420700864
Permit Number 02
Place Name Cross Turner Street
Sheffield
Proposed Start 5 Oct 2020
Proposed End 4 Dec 2024
Actual Start 5 Oct 2020 09:55
Actual End
Traffic Management No carriageway incursion
Impact Footway
Coordinates
Lat, Lon
53.37661
-1.462874
Last Updated 20 Nov 2024 11:03
Works History for Activity LC10420700864 (Cross Turner Street, Sheffield)
Proposed
Actual
Date
Activity
Start
End
Start
End
Status
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
5 Oct 2020
08:58
Work Started
5 Oct 2020
00:00
20 Nov 2020
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Nov 2020
14:46
Permit Alteration Granted
5 Oct 2020
00:00
4 Dec 2020
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
4 Dec 2020
11:42
Permit Alteration Granted
5 Oct 2020
00:00
18 Dec 2020
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
18 Dec 2020
10:52
Permit Alteration Granted
5 Oct 2020
00:00
31 Dec 2020
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
5 Jan 2021
11:42
Permit Alteration Granted
5 Oct 2020
00:00
14 Jan 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
15 Jan 2021
14:19
Permit Alteration Granted
5 Oct 2020
00:00
28 Jan 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Jan 2021
17:00
Permit Alteration Granted
5 Oct 2020
00:00
4 Feb 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
4 Feb 2021
10:59
Permit Alteration Granted
5 Oct 2020
00:00
18 Feb 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
17 Feb 2021
14:47
Permit Alteration Granted
5 Oct 2020
00:00
25 Feb 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 Feb 2021
15:37
Permit Alteration Granted
5 Oct 2020
00:00
11 Mar 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Mar 2021
14:04
Permit Alteration Granted
5 Oct 2020
00:00
25 Mar 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 Mar 2021
14:59
Permit Alteration Granted
5 Oct 2020
00:00
8 Apr 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 Apr 2021
12:55
Permit Alteration Granted
5 Oct 2020
00:00
22 Apr 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 Apr 2021
15:44
Permit Alteration Granted
5 Oct 2020
00:00
6 May 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
6 May 2021
07:43
Permit Alteration Granted
5 Oct 2020
00:00
13 May 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
13 May 2021
10:18
Permit Alteration Granted
5 Oct 2020
00:00
27 May 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 May 2021
08:39
Permit Alteration Granted
5 Oct 2020
00:00
10 Jun 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
10 Jun 2021
10:35
Permit Alteration Granted
5 Oct 2020
00:00
24 Jun 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
24 Jun 2021
12:44
Permit Alteration Granted
5 Oct 2020
00:00
8 Jul 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
9 Jul 2021
08:31
Permit Alteration Granted
5 Oct 2020
00:00
22 Jul 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 Jul 2021
11:33
Permit Alteration Granted
5 Oct 2020
00:00
5 Aug 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
6 Aug 2021
08:58
Permit Alteration Granted
5 Oct 2020
00:00
19 Aug 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
19 Aug 2021
10:22
Permit Alteration Granted
5 Oct 2020
00:00
2 Sep 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
2 Sep 2021
12:47
Permit Alteration Granted
5 Oct 2020
00:00
16 Sep 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
16 Sep 2021
13:53
Permit Alteration Granted
5 Oct 2020
00:00
30 Sep 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
30 Sep 2021
12:00
Permit Alteration Granted
5 Oct 2020
00:00
14 Oct 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
14 Oct 2021
10:01
Permit Alteration Granted
5 Oct 2020
00:00
28 Oct 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
28 Oct 2021
14:11
Permit Alteration Granted
5 Oct 2020
00:00
11 Nov 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Nov 2021
12:55
Permit Alteration Granted
5 Oct 2020
00:00
25 Nov 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 Nov 2021
09:20
Permit Alteration Granted
5 Oct 2020
00:00
2 Dec 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
2 Dec 2021
16:26
Permit Alteration Granted
5 Oct 2020
00:00
16 Dec 2021
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
16 Dec 2021
14:58
Permit Alteration Granted
5 Oct 2020
00:00
4 Jan 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
4 Jan 2022
14:06
Permit Alteration Granted
5 Oct 2020
00:00
11 Jan 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Jan 2022
16:51
Permit Alteration Granted
5 Oct 2020
00:00
25 Jan 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 Jan 2022
16:35
Permit Alteration Granted
5 Oct 2020
00:00
8 Feb 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 Feb 2022
11:19
Permit Alteration Granted
5 Oct 2020
00:00
22 Feb 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 Feb 2022
11:16
Permit Alteration Granted
5 Oct 2020
00:00
8 Mar 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 Mar 2022
16:55
Permit Alteration Granted
5 Oct 2020
00:00
22 Mar 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 Mar 2022
13:33
Permit Alteration Granted
5 Oct 2020
00:00
5 Apr 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
5 Apr 2022
12:14
Permit Alteration Granted
5 Oct 2020
00:00
19 Apr 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
19 Apr 2022
10:14
Permit Alteration Granted
5 Oct 2020
00:00
3 May 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
3 May 2022
07:47
Permit Alteration Granted
5 Oct 2020
00:00
17 May 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
17 May 2022
15:02
Permit Alteration Granted
5 Oct 2020
00:00
31 May 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
31 May 2022
08:57
Permit Alteration Granted
5 Oct 2020
00:00
14 Jun 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
14 Jun 2022
10:18
Permit Alteration Granted
5 Oct 2020
00:00
28 Jun 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
28 Jun 2022
09:36
Permit Alteration Granted
5 Oct 2020
00:00
12 Jul 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
12 Jul 2022
10:46
Permit Alteration Granted
5 Oct 2020
00:00
26 Jul 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Jul 2022
09:56
Permit Alteration Granted
5 Oct 2020
00:00
9 Aug 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
9 Aug 2022
15:05
Permit Alteration Granted
5 Oct 2020
00:00
23 Aug 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Aug 2022
09:29
Permit Alteration Granted
5 Oct 2020
00:00
6 Sep 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
6 Sep 2022
13:14
Permit Alteration Granted
5 Oct 2020
00:00
20 Sep 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
16 Sep 2022
12:24
Permit Alteration Granted
5 Oct 2020
00:00
4 Oct 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
4 Oct 2022
09:23
Permit Alteration Granted
5 Oct 2020
00:00
18 Oct 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
18 Oct 2022
09:34
Permit Alteration Granted
5 Oct 2020
00:00
1 Nov 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
1 Nov 2022
11:38
Permit Alteration Granted
5 Oct 2020
00:00
15 Nov 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
15 Nov 2022
10:36
Permit Alteration Granted
5 Oct 2020
00:00
29 Nov 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
29 Nov 2022
10:54
Permit Alteration Granted
5 Oct 2020
00:00
13 Dec 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
13 Dec 2022
10:58
Permit Alteration Granted
5 Oct 2020
00:00
23 Dec 2022
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 Dec 2022
11:18
Permit Alteration Granted
5 Oct 2020
00:00
6 Jan 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
6 Jan 2023
09:55
Permit Alteration Granted
5 Oct 2020
00:00
20 Jan 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Jan 2023
10:39
Permit Alteration Granted
5 Oct 2020
00:00
3 Feb 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
3 Feb 2023
09:51
Permit Alteration Granted
5 Oct 2020
00:00
17 Feb 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
17 Feb 2023
08:37
Permit Alteration Granted
5 Oct 2020
00:00
3 Mar 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
3 Mar 2023
11:52
Permit Alteration Granted
5 Oct 2020
00:00
17 Mar 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
17 Mar 2023
11:02
Permit Alteration Granted
5 Oct 2020
00:00
31 Mar 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
31 Mar 2023
09:14
Permit Alteration Granted
5 Oct 2020
00:00
14 Apr 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
14 Apr 2023
12:22
Permit Alteration Granted
5 Oct 2020
00:00
28 Apr 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
28 Apr 2023
08:44
Permit Alteration Granted
5 Oct 2020
00:00
12 May 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
12 May 2023
14:40
Permit Alteration Granted
5 Oct 2020
00:00
26 May 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
26 May 2023
07:33
Permit Alteration Granted
5 Oct 2020
00:00
2 Jun 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
2 Jun 2023
08:45
Permit Alteration Granted
5 Oct 2020
00:00
16 Jun 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
16 Jun 2023
09:55
Permit Alteration Granted
5 Oct 2020
00:00
30 Jun 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
30 Jun 2023
13:51
Permit Alteration Granted
5 Oct 2020
00:00
14 Jul 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
14 Jul 2023
10:59
Permit Alteration Granted
5 Oct 2020
00:00
28 Jul 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
28 Jul 2023
08:53
Permit Alteration Granted
5 Oct 2020
00:00
11 Aug 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Aug 2023
09:57
Permit Alteration Granted
5 Oct 2020
00:00
25 Aug 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 Aug 2023
09:07
Permit Alteration Granted
5 Oct 2020
00:00
8 Sep 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 Sep 2023
10:18
Permit Alteration Granted
5 Oct 2020
00:00
22 Sep 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 Sep 2023
07:11
Permit Alteration Granted
5 Oct 2020
00:00
29 Sep 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
29 Sep 2023
08:41
Permit Alteration Granted
5 Oct 2020
00:00
13 Oct 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
13 Oct 2023
09:21
Permit Alteration Granted
5 Oct 2020
00:00
27 Oct 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Oct 2023
08:36
Permit Alteration Granted
5 Oct 2020
00:00
10 Nov 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
10 Nov 2023
10:10
Permit Alteration Granted
5 Oct 2020
00:00
24 Nov 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Nov 2023
17:27
Permit Alteration Granted
5 Oct 2020
00:00
8 Dec 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 Dec 2023
10:02
Permit Alteration Granted
5 Oct 2020
00:00
22 Dec 2023
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
21 Dec 2023
11:17
Permit Alteration Granted
5 Oct 2020
00:00
5 Jan 2024
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
5 Jan 2024
09:41
Permit Alteration Granted
5 Oct 2020
00:00
19 Jan 2024
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
19 Jan 2024
11:20
Permit Alteration Granted
5 Oct 2020
00:00
2 Feb 2024
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
2 Feb 2024
11:13
Permit Alteration Granted
5 Oct 2020
01:00
16 Feb 2024
23:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
15 Feb 2024
15:57
Permit Alteration Granted
5 Oct 2020
01:00
1 Mar 2024
23:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
1 Mar 2024
10:45
Permit Alteration Granted
5 Oct 2020
01:00
15 Mar 2024
23:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
15 Mar 2024
09:28
Permit Alteration Granted
5 Oct 2020
01:00
28 Mar 2024
23:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
28 Mar 2024
09:18
Permit Alteration Granted
5 Oct 2020
01:00
12 Apr 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Apr 2024
10:53
Permit Alteration Granted
5 Oct 2020
00:00
25 Apr 2024
23:59
5 Oct 2020
09:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 Apr 2024
10:46
Permit Alteration Granted
5 Oct 2020
01:00
10 May 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
8 May 2024
14:38
Permit Alteration Granted
5 Oct 2020
01:00
23 May 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
22 May 2024
10:05
Permit Alteration Granted
5 Oct 2020
01:00
6 Jun 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
5 Jun 2024
11:29
Permit Alteration Granted
5 Oct 2020
01:00
20 Jun 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
19 Jun 2024
09:59
Permit Alteration Granted
5 Oct 2020
01:00
4 Jul 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
3 Jul 2024
11:58
Permit Alteration Granted
5 Oct 2020
01:00
18 Jul 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
19 Jul 2024
16:30
Permit Alteration Granted
5 Oct 2020
01:00
1 Aug 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
2 Aug 2024
17:30
Permit Alteration Granted
5 Oct 2020
01:00
15 Aug 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
16 Aug 2024
17:30
Permit Alteration Granted
5 Oct 2020
01:00
29 Aug 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
30 Aug 2024
17:30
Permit Alteration Granted
5 Oct 2020
01:00
12 Sep 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
27 Sep 2024
17:30
Permit Alteration Granted
5 Oct 2020
01:00
10 Oct 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
11 Oct 2024
17:30
Permit Alteration Granted
5 Oct 2020
01:00
24 Oct 2024
00:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
23 Oct 2024
11:01
Permit Alteration Granted
5 Oct 2020
01:00
6 Nov 2024
23:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
6 Nov 2024
12:28
Permit Alteration Granted
5 Oct 2020
01:00
20 Nov 2024
23:59
5 Oct 2020
10:55
In Progress
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
20 Nov 2024
11:03
Permit Alteration Granted
5 Oct 2020
01:00
4 Dec 2024
23:59
5 Oct 2020
10:55
In Progress

Works Permits for Cross Turner Street, Sheffield

+
NCT01a (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date or, in the case of 'immediate works', the start date contained in the application for immediate works and must end by the estimated end date provided on this permit. The proposed start date, actual start date and estimated end date will be as defined.

Applies to all permits.

+
NCT01b (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date and must commence within the valid starting window period or in the case of immediate works by the actual start date contained in the application for immediate works. Once the activities have commenced, the activities must take no more than [x number of] days in total to be completed. The proposed start date, actual start date and estimated end date are as defined.

Applies to all permits.

+
NCT02a (Limit the days and times of day within the permit duration)

For the activities hereby permitted, it is a condition of this permit that activities shall only take place between [start time] and [end time] on weekdays and [start time] and [end time] on Saturdays and [start time] and [end time] on Sundays or Bank Holiday.

+
NCT06a (Road space to be available to traffic/pedestrians at certain times of day)

For the activities hereby permitted, it is a condition of this permit that [x]m must be maintained for pedestrians and/or [y]m must be maintained for vehicles at the specified times.

+
NCT11a (Display of Permit Number)

For the activities hereby permitted, it is a condition of this permit that activities shall not be carried out unless a site information board(s) displaying the permit reference number is on the site at all times for the duration of the works. This must be displayed in a prominent place at all times so that it may be read easily by the public, clearly displaying the correct permit reference number. For immediate works, the display of the permit reference number is required by 10.00am on the next working day after the works have started on site.

Applies to all permits.

+
NCT11b (Publicity for proposed works)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence unless the promoter has publicised and/or advised all individual properties and businesses [on x roads] setting out where the works will take place; the nature of the works; the duration of the works; the intended start date [etc.] and contact details of a representative of the promoter.

Notes

Proposed Work Dates

Roadworks are planned in advance and sometimes are proposed to run over a number of days. It may well be that the roadworks start after the proposed start date due to bad weather or other operational delays. Equally, works may complete before the proposed end date as the works may have included a few extra days just in case.

Problems with roadworks?

On rare occasions, issues may occur during or after the completion of roadworks, such as:

  • Poor reinstatement of the footpath or the carriageway.
  • Rubbish and mess remaining after the works have completed.
  • Traffic management issues during the works.
  • Equipment left behind after the works have completed.
  • Any other issues or disruption that the works may be causing.

In such instances, you should try and contact the organisation carrying out the works in the first instance. If we have contact details available they are shown on the detailed roadworks page.

In the event that the organistion cannot help, then the local authority that authorised the works may be able to help and again, if their contact details are published then we have provided their contact information on our detailed roadworks page.

Unfortunately, here at StreetGuide, we are only publishers of the data provided by the organisations and cannot provide information or assistance on individual works.

Contains public sector information licensed under the Open Government Licence v3.0.