ROADWORKS SUMMARY
North Street, WALTHAM ABBEY, EN9 2NW
Introduction

View current and future planned roadworks and road closures for North Street, EN9 2NW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to North Street, WALTHAM ABBEY, EN9 2NW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for North Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Third Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:39 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:42.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Second Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:38 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:42.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Velizy Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:34 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:37.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Fourth Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 00:00 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Feb 2024 at 07:59.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on First Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 00:00 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Feb 2024 at 08:01.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Hammarskjold Road, Harlow.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 00:00 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Feb 2024 at 07:59.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Fifth Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:35 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:37.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Elizabeth Way, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:36 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:40.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Edinburgh Way, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:35 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:37.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Edinburgh Way, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:36 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:37.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on A414 Between Northern Town Boundary And Burnt Mill Roundabout, Harlow District, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:37 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:40.
8 Oct 2024 and 25 Oct 2025
Hertfordshire County Council were proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 October 2024 and run through until 25 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 Sep 2024 at 13:32.
16 Oct 2024 and 16 Oct 2025
National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Holyfield Road, Waltham Abbey Town, Waltham Abbey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 October 2024 and run through until 16 October 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 1 Oct 2024 at 12:03.
Friday
Hertfordshire County Council are carrying out Highway repair and maintenance works on White Stubbs Lane, Broxbourne.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 00:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 May 2025 at 09:59.
30 Jun 2025
Essex County Council are carrying out Remedial works on Terminus Street, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:30 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Dec 2024 at 09:41.
2 Dec 2024 and 30 Jun 2025
Essex County Council are proposing to carry out Remedial works on Post Office Road, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 30 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:27.
27 Jun 2025
Essex County Council are carrying out Remedial works on Post Office Road, Harlow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:30 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Apr 2025 at 13:50.
6 Jul 2025
Hertfordshire County Council are carrying out roadworks on Monarchs Way, Waltham Cross.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:00 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 27 Mar 2025 at 17:54.
18 Aug 2025
National Grid Electricity Transmission are carrying out roadworks on Rye Road, Stanstead Abbotts.
These works are categorised as Major.
The works started on 4 March 2025 at 15:00 and could run through until 18 August 2025. The works will impact the verge only.
This roadwork event was last updated by National Grid Electricity Transmission on 4 Mar 2025 at 15:39.
10 Mar and 21 Oct 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Dinant Link Road, Hoddesdon.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 6 Dec 2024 at 09:02.
Friday
Hertfordshire County Council are carrying out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 09:30 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Mar 2025 at 10:23.
4 Aug 2025
Hertfordshire County Council are carrying out Highway improvement works on Eleanor Cross Road, Waltham Cross.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2025 at 21:00 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 May 2025 at 16:42.
12 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Wormley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:49.
20 Jun 2025
Cadent Gas are carrying out Utility asset works on Church Lane, Wormley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 06:23 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 16:52.
Thursday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Penton Drive, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 12:50.
11 Jun 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Penton Drive, Cheshunt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 08:43 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 17:49.
10 Jun 2025
Essex County Council are carrying out Highway improvement works on Tower Road, Epping Town, Epping.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:51 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 08:56.
10 Jun 2025
Essex County Council are carrying out Highway improvement works on Upper Swaines, Epping Town, Epping.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:51 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 08:56.
Friday
Essex County Council are carrying out Highway improvement works on Crows Road, Epping Town, Epping.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 May 2025 at 00:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 08:56.
13 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Turners Hill, Cheshunt.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 May 2025 at 11:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:39.
27 May and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Amwell Hill, Great Amwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 13:00.
18 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Brookside, Harlow.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 11:00 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:24.
Tomorrow
BT are proposing to carry out Utility asset works on Halfhide Lane, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 24 Apr 2025 at 09:20.
Friday
Affinity Water were proposing to carry out Utility asset works on Upland Road, North Weald Bassett, Epping.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 10:53.
Friday
Affinity Water are proposing to carry out Utility asset works on Upland Road, North Weald Bassett, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Mar 2025 at 10:02.
Friday
Affinity Water are carrying out Utility asset works on Upland Road, North Weald Bassett, Epping.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:42 and could run through until 6 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 2 Jun 2025 at 09:56.
Friday
BT were proposing to carry out Utility asset works on Hamstel Road, Harlow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 4 Apr 2025 at 07:46.
2 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Pepper Hill, Great Amwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 13:00.
20 Jun 2025
Cadent Gas are carrying out Utility asset works on Lower Road, Great Amwell.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:31 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 09:34.
Friday
Affinity Water are proposing to carry out Utility repair and maintenance works on Back Lane, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Feb 2025 at 11:21.
Friday
Affinity Water are carrying out Utility repair and maintenance works on Back Lane, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 06:22 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Jun 2025 at 08:46.
6 and 10 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Apr 2025 at 10:25.
6 and 10 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford, Essendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Apr 2025 at 13:25.
9 and 13 Jun 2025
Thames Water are proposing to carry out New service connection on Bedford Crescent, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Feb 2025 at 12:02.
9 and 11 Jun 2025
Essex County Council are proposing to carry out Remedial works on Parklands, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 May 2025 at 15:15.
9 and 15 Jun 2025
Thames Water were proposing to carry out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:08.
9 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Crouch Lane, Goffs Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 11 Mar 2025 at 10:40.
9 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Crouch Lane, Goffs Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 11 Mar 2025 at 10:43.
9 Jun and 11 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Turnford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 13 Mar 2025 at 11:15.
9 Jun and 11 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Turnford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 15:42.
9 Jun and 11 Jul 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Vancouver Road, Turnford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 11:54.
9 Jun and 11 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Vancouver Road, Turnford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 10:42.
9 Jun and 11 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Vancouver Road, Turnford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 23 May 2025 at 09:28.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hammondstreet Road, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2025 at 22:10.
9 and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on White Stubbs Lane, Broxbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:48.
9 and 12 Jun 2025
Essex County Council are proposing to carry out Remedial works on Velizy Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 May 2025 at 10:24.
9 and 12 Jun 2025
Essex County Council are proposing to carry out Remedial works on Hammarskjold Road, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 09:00.
9 Jun and 4 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Acorn Street, Hunsdon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Mar 2025 at 09:26.
10 and 12 Jun 2025
Virgin Media were proposing to carry out Utility asset works on Burton Lane, Goffs Oak.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 10 Apr 2025 at 11:26.
10 and 14 Jun 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Eastwick Road, Eastwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 14 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Apr 2025 at 12:17.
10 and 14 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Apr 2025 at 08:56.
11 and 14 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Dec 2024 at 11:18.
12 and 14 Jun 2025
Essex County Council are proposing to carry out Remedial works on Fourth Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 May 2025 at 07:44.
16 and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Andrews Lane, Goffs Oak.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:17.
16 Jun and 30 Jul 2025
Indigo Power were proposing to carry out Utility asset works on Newgatestreet Road, Goffs Oak.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Indigo Power on 4 Apr 2025 at 15:35.
16 Jun and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Nazeing Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 10:43.
16 Jun and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Nazeing Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:59.
16 and 18 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Cuthberts Road, Hoddesdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 20:20.
16 and 20 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on The Hornbeams, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 22:30.
16 and 18 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Galley Green, Hoddesdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 23:04.
17 and 23 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Marle Gardens, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Mar 2025 at 10:19.
17 and 19 Jun 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Hoe Lane, Hertford Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 June 2025 and run through until 19 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 May 2025 at 09:18.
20 and 26 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Marle Gardens, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Feb 2025 at 09:04.
21 and 26 Jun 2025
Telefonica UK were proposing to carry out Utility asset works on Honey Lane, Waltham Abbey Town, Waltham Abbey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 June 2025 and run through until 26 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Telefonica UK on 24 Apr 2025 at 11:46.
23 and 29 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Parklands, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Apr 2025 at 10:15.
23 Jun and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Tower Road, Epping Town, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 12:52.
23 and 29 Jun 2025
Thames Water were proposing to carry out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 29 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Apr 2025 at 15:05.
23 Jun and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cock Lane, Hoddesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 12:08.
23 and 25 Jun 2025
Essex County Council are proposing to carry out Remedial works on North Gate, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 May 2025 at 15:44.
23 and 26 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 15:12.
23 and 26 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 11:57.
23 and 26 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 11:56.
23 and 29 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Stanstead Road, Rush Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 12:25.
23 and 29 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Stanstead Road, Rush Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 May 2025 at 15:08.
23 and 29 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on A10 Rush Green Northbound Offslip, Hertford Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 12:24.
23 and 29 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on A10 Rush Green Northbound Offslip, Hertford Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 Jun 2025 at 12:48.
23 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Road, Great Amwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 09:28.
24 Jun and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Upper Swaines, Epping Town, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 15:34.
24 Jun and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Crows Road, Epping Town, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 12:56.
25 Jun and 8 Jul 2025
ESP Electricity are proposing to carry out Utility asset works on Lindsey Street, Epping Town, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 23 May 2025 at 10:31.
26 and 28 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Albemarle Avenue, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 12:42.
27 and 30 Jun 2025
Essex County Council were proposing to carry out Highway improvement works on Abbotsweld, Harlow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 11:19.
27 and 30 Jun 2025
Essex County Council were proposing to carry out Highway improvement works on Abbotsweld, Harlow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 11:35.
27 and 30 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Abbotsweld, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 11:56.
28 Jun and 4 Jul 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Apr 2025 at 17:16.
28 Jun and 4 Jul 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 May 2025 at 13:45.
30 Jun and 21 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Eleanor Cross Road, Waltham Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:31.
30 Jun and 21 Jul 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Eleanor Cross Road, Waltham Cross.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 21 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 26 Mar 2025 at 16:40.
30 Jun and 2 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on A10 Turnford Link To Hoddesdon Link, Hoddesdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 5 Dec 2024 at 16:36.
30 Jun and 9 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on A10 Turnford Link To Hoddesdon Link, Hoddesdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 9 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 May 2025 at 09:17.
30 Jun and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Rye Hill Road, North Weald Bassett, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Apr 2025 at 09:21.
30 Jun and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Rye Hill Road, North Weald Bassett, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 08:30.
30 Jun and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Cock Lane, Hoddesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 11:25.
30 Jun and 4 Jul 2025
BT are proposing to carry out Utility asset works on Park Mead, Harlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 May 2025 at 09:23.
30 Jun and 4 Jul 2025
BT are proposing to carry out Utility asset works on Park Mead, Harlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 May 2025 at 17:44.
30 Jun and 4 Jul 2025
BT are proposing to carry out Utility asset works on Hamstel Road, Harlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 May 2025 at 17:44.
30 Jun and 4 Jul 2025
BT are proposing to carry out Utility asset works on Hamstel Road, Harlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 May 2025 at 09:22.
3 and 7 Jul 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 July 2025 and run through until 7 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 May 2025 at 10:30.
7 Jul and 15 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Honey Lane, Waltham Abbey Town, Waltham Abbey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 10:41.
7 and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Rounton Road, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 16:12.
7 Jul and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Honey Lane, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 16:06.
7 Jul and 1 Aug 2025
Indigo Power are proposing to carry out Utility asset works on Newgatestreet Road, Goffs Oak.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Indigo Power on 2 May 2025 at 11:14.
7 and 11 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Upland Road, North Weald Bassett, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 May 2025 at 17:54.
9 and 28 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenall Close, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 16 Apr 2025 at 16:19.
9 and 28 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenall Close, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 11:40.
14 and 16 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Avey Lane, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 May 2025 at 15:15.
14 and 16 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Avey Lane, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 09:52.
14 Jul and 31 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Bakers Lane, Epping Town, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 May 2025 at 08:14.
14 Jul and 31 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Bakers Lane, Epping Town, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 May 2025 at 10:39.
14 and 18 Jul 2025
GTC Pipelines were proposing to carry out New service connection on Old House Lane, Roydon, Harlow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 9 May 2025 at 11:24.
14 and 17 Jul 2025
GTC Pipelines are proposing to carry out New service connection on Old House Lane, Roydon, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 13 May 2025 at 13:49.
14 and 17 Jul 2025
GTC Pipelines are proposing to carry out New service connection on Old House Lane, Roydon, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 20 May 2025 at 15:53.
14 and 18 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Tracyes Road, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 10:12.
14 and 21 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Lawrence Avenue, Stanstead Abbotts.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 00:16.
18 Jul and 21 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Park Lane, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 11:32.
18 Jul and 21 Aug 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Park Lane, Waltham Cross.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 July 2025 and run through until 21 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 26 Mar 2025 at 16:41.
18 Jul and 21 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Sturlas Way, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 6 Nov 2024 at 12:01.
18 Jul and 21 Aug 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Sturlas Way, Waltham Cross.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 July 2025 and run through until 21 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 09:43.
18 and 21 Jul 2025
BT are proposing to carry out Utility asset works on Reeves Lane, Essex, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 21 July 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 2 May 2025 at 09:00.
18 and 21 Jul 2025
BT are proposing to carry out Utility asset works on Reeves Lane, Essex, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 21 July 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 12 May 2025 at 14:06.
18 and 31 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Southern Way, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 14:44.
18 and 31 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Tawneys Road, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 14:31.
21 and 25 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Eleanor Cross Road, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 13:56.
21 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Rosebank, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 12:16.
21 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Rosebank, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 11:47.
21 and 25 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Middle Street, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 May 2025 at 09:56.
21 and 25 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Middle Street, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 09:52.
24 and 26 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 11:18.
24 and 26 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford, Essendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 12:06.
24 and 26 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mangrove Lane, Brickendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Mar 2025 at 14:39.
26 Jul and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Hoddesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 15:57.
26 Jul and 11 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Cock Lane, Hoddesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 16:10.
28 Jul and 3 Aug 2025
Thames Water are proposing to carry out New service connection on Bullsmoor Lane, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 14:13.
28 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Patmore Road, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 13:35.
28 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Patmore Road, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 12:32.
28 Jul and 6 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Stonyshotts, Waltham Abbey Town, Waltham Abbey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 6 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 11:48.
28 Jul and 6 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Stonyshotts, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 16:15.
28 Jul and 17 Aug 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Goffs Lane, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Mar 2025 at 13:48.
28 Jul and 29 Aug 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Great Cambridge Road, Cheshunt.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 13:55.
28 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Church Lane, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2025 at 09:49.
28 Jul and 29 Aug 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Church Lane, Cheshunt.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 11:57.
28 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2025 at 09:16.
28 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Cheshunt.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 13 Mar 2025 at 13:07.
28 Jul and 29 Aug 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Church Lane, Cheshunt.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 11:59.
28 Jul and 29 Aug 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Church Lane, Cheshunt.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 08:09.
28 Jul and 29 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2025 at 08:37.
28 Jul and 3 Aug 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Andrews Lane, Goffs Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 23 May 2025 at 10:12.
28 Jul and 1 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Low Hill Road, Roydon, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 1 May 2025 at 13:53.
28 Jul and 1 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Low Hill Road, Roydon, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 09:52.
28 Jul and 7 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Hertford Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 15:14.
28 Jul and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Cautherly Lane, Great Amwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 13:30.
29 and 31 Jul 2025
Virgin Media are proposing to carry out Utility asset works on Burton Lane, Goffs Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 12 May 2025 at 11:59.
29 Jul and 1 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Second Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 May 2025 at 07:52.
29 and 31 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Road, Ware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Mar 2025 at 10:03.
31 Jul and 4 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on First Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 May 2025 at 07:56.
31 Jul and 4 Aug 2025
Essex County Council are proposing to carry out Remedial works on First Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 08:58.
1 and 4 Aug 2025
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Church Lane, Wormley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 11:46.
1 and 4 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 May 2025 at 10:33.
1 and 5 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford, Essendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 May 2025 at 17:28.
4 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Tennyson Avenue, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 10:12.
4 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Tennyson Avenue, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 11:41.
4 and 8 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hammondstreet Road, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 May 2025 at 15:29.
4 and 12 Aug 2025
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Church Lane, Wormley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 11:35.
4 and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Hillside Lane, Great Amwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 13:30.
5 and 8 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Road, Broxbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 13:43.
6 and 8 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mangrove Lane, Brickendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Jun 2025 at 11:59.
9 and 15 Aug 2025
G2 Energy IDNO are proposing to carry out New service connection on Access Road From Bullsmoor Lane To 1604-1750 Great Cambridge Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by G2 Energy IDNO on 6 May 2025 at 11:54.
11 Aug and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 May 2025 at 14:24.
11 and 16 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Parklands, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 08:27.
12 and 23 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 11:22.
12 and 23 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eleanor Cross Road, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 11:22.
12 and 23 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Monarchs Way, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 11:21.
13 and 15 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Betts Lane, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 May 2025 at 09:44.
14 and 26 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elm Drive, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 23 May 2025 at 10:06.
18 and 26 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hurst Drive, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 13:18.
18 Aug and 15 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Rosedale Way, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:37.
18 Aug and 29 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on North Street, Nazeing, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 10:11.
18 and 20 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hailey Lane, Hailey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Apr 2025 at 10:09.
18 and 20 Aug 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hailey Lane, Hoddesdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 14:45.
21 Aug and 3 Sep 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Hertford Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 11:09.
25 Aug and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Pepper Hill, Great Amwell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 14:00.
26 and 28 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Eleanor Cross Road, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 10:31.
26 Aug and 15 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Farm Hill Road, Waltham Abbey Town, Waltham Abbey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 17:08.
26 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Farm Hill Road, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 16:00.
26 Aug and 15 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Farm Hill Road, Waltham Abbey Town, Waltham Abbey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:21.
28 Aug and 1 Sep 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Monarchs Way, Waltham Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Jan 2025 at 16:04.
29 Aug and 1 Sep 2025
Essex County Council are proposing to carry out Highway improvement works on Tye Green Village, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 May 2025 at 08:31.
29 Aug and 1 Sep 2025
Essex County Council are proposing to carry out Highway improvement works on Tye Green Village, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 09:25.
Roadworks Map near to North Street, WALTHAM ABBEY, EN9 2NW (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to North Street, WALTHAM ABBEY, EN9 2NW (16 Events)
(Scheduled Dates)
(miles)
(Scheduled: 3 Mar 2025 - 18 Aug 2025)