ROADWORKS SUMMARY
College Road, WALTHAM CROSS, EN8 9LX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for College Road, EN8 9LX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to College Road, WALTHAM CROSS, EN8 9LX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for College Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Bramble Lane

UK Power Networks Eastern & London are carrying out New service connection on Bramble Lane, Hoddesdon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 March 2023 at 10:00 and could run through until 26 September 2024. The works will impact the footpath only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 May 2024 at 14:30.

London Borough Of Enfield logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are carrying out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works started on 1 August 2023 at 07:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 24 May 2024 at 15:27.

London Borough Of Enfield logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Carterhatch Lane

London Borough Of Enfield are carrying out Highway improvement works on Carterhatch Lane, Enfield.

These works are categorised as Major.

The works started on 7 May 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 8 Aug 2024 at 11:03.

London Borough Of Enfield logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Sarnesfield Road

London Borough Of Enfield are carrying out Highway repair and maintenance works on Sarnesfield Road, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Jul 2024 at 06:14.

London Borough Of Enfield logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Church Street

London Borough Of Enfield are carrying out Highway repair and maintenance works on Church Street, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Jul 2024 at 06:09.

London Borough Of Enfield logo
LONG TERM
Between
1 Jul and 8 Nov 2024
Details
View Map
Share
Follow
Little Park Gardens

London Borough Of Enfield are proposing to carry out Highway improvement works on Little Park Gardens, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 26 Jul 2024 at 10:20.

London Borough Of Enfield logo
LONG TERM
Between
1 Jul and 8 Nov 2024
Details
View Map
Share
Follow
Cecil Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Cecil Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 26 Jul 2024 at 10:20.

London Borough Of Enfield logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Enfield are carrying out Highway improvement works on The Ridgeway, Enfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2024 at 08:00 and could run through until 4 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Enfield on 10 Sep 2024 at 11:08.

Thames Water logo
LONG TERM
Until
27 Oct 2024
Details
View Map
Share
Follow
Cuffley Hill

Thames Water are carrying out Utility asset works on Cuffley Hill, Goffs Oak.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 09:30 and could run through until 27 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 15:26.

ESP Electricity logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Bilton Way

ESP Electricity are proposing to carry out Utility asset works on Bilton Way, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2024 and could run through until 22 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ESP Electricity on 30 Apr 2024 at 12:47.

ESP Electricity logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Newbury Avenue

ESP Electricity were proposing to carry out Utility asset works on Newbury Avenue, Enfield.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 23 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 6 Aug 2024 at 07:58.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Severn Drive

Cadent Gas were proposing to carry out Utility asset works on Severn Drive, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 20 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2024 at 15:31.

London Borough Of Enfield logo
LONG TERM
Between
19 Aug and 20 Dec 2024
Details
View Map
Share
Follow
Bullsmoor Lane

London Borough Of Enfield are proposing to carry out Works for road purposes on Bullsmoor Lane, Enfield.

These works are categorised as Major.

The works will start on or after 19 August 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 15 Aug 2024 at 10:00.

London Borough Of Enfield logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Bullsmoor Lane

London Borough Of Enfield are carrying out Works for road purposes on Bullsmoor Lane, Enfield.

These works are categorised as Major.

The works started on 19 August 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 19 Aug 2024 at 16:03.

ESP Electricity logo
LONG TERM
Between
21 Aug and 8 Oct 2024
Details
View Map
Share
Follow
Mollison Avenue

ESP Electricity are proposing to carry out Utility asset works on Mollison Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 8 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 19 Aug 2024 at 10:05.

ESP Electricity logo
LONG TERM
Between
21 Aug and 9 Oct 2024
Details
View Map
Share
Follow
Bilton Way

ESP Electricity are proposing to carry out Utility asset works on Bilton Way, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 19 Aug 2024 at 10:06.

ESP Electricity logo
LONG TERM
Until
9 Oct 2024
Details
View Map
Share
Follow
Bilton Way

ESP Electricity are carrying out Utility asset works on Bilton Way, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2024 at 08:00 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 14 Sep 2024 at 09:17.

ESP Electricity logo
LONG TERM
Until
8 Oct 2024
Details
View Map
Share
Follow
Access Road From Ferndale Road To Garages Rear Of 17 Ferndale Road

ESP Electricity are carrying out Utility asset works on Access Road From Ferndale Road To Garages Rear Of 17 Ferndale Road, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2024 at 08:00 and could run through until 8 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 21 Aug 2024 at 08:09.

ESP Electricity logo
LONG TERM
Until
8 Oct 2024
Details
View Map
Share
Follow
Ferndale Road

ESP Electricity are carrying out Utility asset works on Ferndale Road, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2024 at 08:00 and could run through until 8 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 21 Aug 2024 at 08:09.

ESP Electricity logo
LONG TERM
Between
3 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Bilton Way

ESP Electricity are proposing to carry out Utility asset works on Bilton Way, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 16 Aug 2024 at 09:25.

Hertfordshire County Council logo
LONG TERM
Between
9 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Monarchs Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Monarchs Way, Waltham Cross.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2024 at 12:27.

Hertfordshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Monarchs Way

Hertfordshire County Council are carrying out Highway improvement works on Monarchs Way, Waltham Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2024 at 13:40.

Cadent Gas logo
LONG TERM
Between
9 Sep and 13 Oct 2024
Details
View Map
Share
Hammondstreet Road

Cadent Gas were proposing to carry out Utility asset works on Hammondstreet Road, Cheshunt.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 13 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 11:19.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Appleby Street

Cadent Gas are proposing to carry out Utility asset works on Appleby Street, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 14:38.

Cadent Gas logo
Between
9 and 27 Sep 2024
Details
View Map
Share
Follow
Smiths Lane

Cadent Gas are proposing to carry out Utility asset works on Smiths Lane, Cheshunt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 10:52.

Cadent Gas logo
LONG TERM
Between
9 Sep and 13 Oct 2024
Details
View Map
Share
Follow
Hammondstreet Road

Cadent Gas are proposing to carry out Utility asset works on Hammondstreet Road, Cheshunt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 13:52.

Cadent Gas logo
LONG TERM
Until
13 Oct 2024
Details
View Map
Share
Follow
Hammondstreet Road

Cadent Gas are carrying out Utility asset works on Hammondstreet Road, Cheshunt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 07:58 and could run through until 13 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 08:08.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Nazeing New Road

Thames Water are carrying out Utility asset works on Nazeing New Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 13:55 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:52.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
New Nazeing Road

Thames Water are carrying out Utility asset works on New Nazeing Road, Broxbourne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 13:45 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:51.

Cadent Gas logo
LONG TERM
Between
15 Sep and 24 Oct 2024
Details
View Map
Share
Follow
Dendridge Close

Cadent Gas are proposing to carry out Utility asset works on Dendridge Close, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 13:46.

Thames Water logo
Between
15 and 30 Sep 2024
Details
View Map
Share
Follow
New Nazeing Road

Thames Water are proposing to carry out Utility asset works on New Nazeing Road, Broxbourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:31.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Linwood Crescent

UK Power Networks Eastern & London were proposing to carry out New service connection on Linwood Crescent, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 24 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 12:31.

Cadent Gas logo
LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Dendridge Close

Cadent Gas are carrying out Utility asset works on Dendridge Close, Enfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:39 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:04.

Cadent Gas logo
Between
16 Sep and 11 Oct 2024
Details
View Map
Share
Follow
Cocker Road

Cadent Gas are proposing to carry out Utility asset works on Cocker Road, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 13:50.

Hertfordshire County Council logo
Until
11 Oct 2024
Details
View Map
Share
Follow
A10 Between Turnford Link And Halfhide Lane

Hertfordshire County Council are carrying out Highway repair and maintenance works on A10 Between Turnford Link And Halfhide Lane, Turnford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 21:00 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 11:06.

Eunetworks logo
Between
16 and 28 Sep 2024
Details
View Map
Share
Follow
Old Nazeing Road

Eunetworks are proposing to carry out Utility asset works on Old Nazeing Road, Broxbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 8 Aug 2024 at 17:12.

Eunetworks logo
Between
16 and 28 Sep 2024
Details
View Map
Share
Follow
Old Nazeing Road

Eunetworks are proposing to carry out Utility asset works on Old Nazeing Road, Broxbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 19 Aug 2024 at 10:45.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
St Catharines Road

Thames Water are carrying out Utility repair and maintenance works on St Catharines Road, Broxbourne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 12:15 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:48.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Road

Thames Water are carrying out Utility repair and maintenance works on Church Road, Waltham Abbey Town, Waltham Abbey.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 13:41 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 14:09.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Holtwhites Hill

Thames Water are carrying out Utility repair and maintenance works on Holtwhites Hill, Enfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 10:04 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 14:43.

Hertfordshire County Council logo
Between
19 and 27 Sep 2024
Details
View Map
Share
Follow
Davison Drive

Hertfordshire County Council are proposing to carry out Highway improvement works on Davison Drive, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 22 Jul 2024 at 10:33.

Cadent Gas logo
Until
2 Oct 2024
Details
View Map
Share
Follow
Newgatestreet Road

Cadent Gas are carrying out Utility repair and maintenance works on Newgatestreet Road, Goffs Oak.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 08:00 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 15:44.

Cadent Gas logo
Between
23 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Cocker Road

Cadent Gas are proposing to carry out Utility asset works on Cocker Road, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 14:19.

Cadent Gas logo
Between
23 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Cocker Road

Cadent Gas are proposing to carry out Utility asset works on Cocker Road, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 11:28.

Cadent Gas logo
Between
23 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Cocker Road

Cadent Gas are proposing to carry out Utility asset works on Cocker Road, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:00.

Cadent Gas logo
Between
23 Sep and 18 Oct 2024
Details
View Map
Share
Cocker Road

Cadent Gas were proposing to carry out Utility asset works on Cocker Road, Enfield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 18 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:28.

Cadent Gas logo
LONG TERM
Between
23 Sep and 1 Nov 2024
Details
View Map
Share
Follow
Hammondstreet Road

Cadent Gas are proposing to carry out Utility asset works on Hammondstreet Road, Cheshunt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 10:30.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hoe Lane

Affinity Water are proposing to carry out Remedial works on Hoe Lane, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Jul 2024 at 14:00.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Hamlet Hill

Affinity Water are proposing to carry out Utility repair and maintenance works on Hamlet Hill, Roydon, Harlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Jul 2024 at 09:54.

London Borough Of Enfield logo
Finishing
Thursday
Details
View Map
Share
Follow
Turkey Street

London Borough Of Enfield are proposing to carry out Highway improvement works on Turkey Street, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 19 Sep 2024 at 12:03.

London Borough Of Enfield logo
Between
25 and 27 Sep 2024
Details
View Map
Share
Follow
Park Avenue

London Borough Of Enfield are proposing to carry out Highway improvement works on Park Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Sep 2024 at 15:35.

Thames Water logo
LONG TERM
Between
26 Sep and 27 Nov 2024
Details
View Map
Share
Follow
Lytton Avenue

Thames Water are proposing to carry out Utility asset works on Lytton Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 10:37.

Essex County Council logo
Between
30 Sep and 5 Oct 2024
Details
View Map
Share
Follow
Epping New Road

Essex County Council are proposing to carry out Highway improvement works on Epping New Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 5 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Jul 2024 at 08:24.

Essex County Council logo
Between
30 Sep and 5 Oct 2024
Details
View Map
Share
Follow
Robin Hood Roundabout

Essex County Council are proposing to carry out Highway improvement works on Robin Hood Roundabout, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 5 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Jul 2024 at 08:22.

Thames Water logo
Between
1 and 24 Oct 2024
Details
View Map
Share
Follow
Nazeing New Road

Thames Water are proposing to carry out Utility asset works on Nazeing New Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jun 2024 at 09:28.

Hertfordshire County Council logo
Between
1 and 3 Oct 2024
Details
View Map
Share
Follow
Lampits

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Lampits, Hoddesdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Sep 2024 at 10:54.

Thames Water logo
Between
2 and 4 Oct 2024
Details
View Map
Share
High Street

Thames Water were proposing to carry out Utility asset works on High Street, Waltham Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 4 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 09:32.

Thames Water logo
Between
2 and 4 Oct 2024
Details
View Map
Share
Follow
Lodge Crescent

Thames Water are proposing to carry out Utility asset works on Lodge Crescent, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 10:50.

Thames Water logo
Between
2 and 4 Oct 2024
Details
View Map
Share
Follow
Lodge Crescent

Thames Water are proposing to carry out Utility asset works on Lodge Crescent, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:09.

Thames Water logo
Between
7 and 9 Oct 2024
Details
View Map
Share
Follow
Avey Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Avey Lane, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 09:52.

Thames Water logo
Between
7 and 10 Oct 2024
Details
View Map
Share
Mott Street

Thames Water were proposing to carry out Utility repair and maintenance works on Mott Street, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 10 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 12:52.

Thames Water logo
LONG TERM
Between
7 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Marrilyne Avenue

Thames Water are proposing to carry out Utility asset works on Marrilyne Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:34.

Essex County Council logo
Between
7 and 9 Oct 2024
Details
View Map
Share
Follow
Sewardstone Road

Essex County Council are proposing to carry out Highway improvement works on Sewardstone Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Aug 2024 at 08:52.

Thames Water logo
LONG TERM
Between
13 Oct 2024 and 22 Jan 2025
Details
View Map
Share
Follow
Crouch Lane

Thames Water are proposing to carry out Utility asset works on Crouch Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2024 at 11:50.

Network Rail logo
Between
14 and 16 Oct 2024
Details
View Map
Share
Follow
Green Street

Network Rail are proposing to carry out Works for Rail Purposes on Green Street, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Aug 2024 at 10:05.

Network Rail logo
Between
14 and 16 Oct 2024
Details
View Map
Share
Follow
Green Street

Network Rail are proposing to carry out Works for Rail Purposes on Green Street, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Sep 2024 at 13:34.

Thames Water logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
Mott Street

Thames Water are proposing to carry out Utility repair and maintenance works on Mott Street, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 13:07.

Thames Water logo
Between
14 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Browning Road

Thames Water are proposing to carry out Utility asset works on Browning Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 16:42.

Thames Water logo
Between
14 and 16 Oct 2024
Details
View Map
Share
Follow
Lodge Crescent

Thames Water are proposing to carry out Utility asset works on Lodge Crescent, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 09:16.

Thames Water logo
Between
14 and 19 Oct 2024
Details
View Map
Share
High Street

Thames Water were proposing to carry out New service connection on High Street, Waltham Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 19 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:37.

Cadent Gas logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Smiths Lane

Cadent Gas are proposing to carry out Utility asset works on Smiths Lane, Cheshunt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 13:58.

Cadent Gas logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Smiths Lane

Cadent Gas are proposing to carry out Utility asset works on Smiths Lane, Cheshunt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 14:19.

Cadent Gas logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Bread And Cheese Lane

Cadent Gas are proposing to carry out Utility asset works on Bread And Cheese Lane, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:28.

National Grid Electricity Transmission logo
LONG TERM
Between
16 Oct 2024 and 16 Oct 2025
Details
View Map
Share
Follow
Holyfield Road

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Holyfield Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 16 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 6 Aug 2024 at 09:56.

Hertfordshire County Council logo
Between
16 and 21 Oct 2024
Details
View Map
Share
Follow
Bucks Alley

Hertfordshire County Council are proposing to carry out Highway improvement works on Bucks Alley, Bayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 21 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Jul 2024 at 12:42.

Essex County Council logo
Between
21 and 26 Oct 2024
Details
View Map
Share
Follow
Sewardstone Road

Essex County Council are proposing to carry out Highway improvement works on Sewardstone Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Sep 2024 at 15:12.

Thames Water logo
Between
21 and 26 Oct 2024
Details
View Map
Share
Amesbury

Thames Water were proposing to carry out New service connection on Amesbury, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 26 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 15:55.

UK Power Networks Eastern & London logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Halstead Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Halstead Hill, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2024 at 14:30.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Bread And Cheese Lane

Cadent Gas are proposing to carry out Utility asset works on Bread And Cheese Lane, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 09:54.

Thames Water logo
LONG TERM
Between
22 Oct and 22 Dec 2024
Details
View Map
Share
Follow
Nazeing New Road

Thames Water are proposing to carry out Utility asset works on Nazeing New Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Jul 2024 at 10:54.

Thames Water logo
LONG TERM
Between
22 Oct and 22 Dec 2024
Details
View Map
Share
Follow
Nazeing New Road

Thames Water are proposing to carry out Utility asset works on Nazeing New Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 12:11.

Thames Water logo
LONG TERM
Between
24 Oct and 5 Dec 2024
Details
View Map
Share
Follow
Nazeing Road

Thames Water are proposing to carry out Utility asset works on Nazeing Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Jul 2024 at 10:55.

Thames Water logo
LONG TERM
Between
24 Oct and 5 Dec 2024
Details
View Map
Share
Follow
Nazeing Road

Thames Water are proposing to carry out Utility asset works on Nazeing Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 12:08.

Thames Water logo
LONG TERM
Between
24 Oct and 22 Dec 2024
Details
View Map
Share
Follow
Old Nazeing Road

Thames Water are proposing to carry out Utility asset works on Old Nazeing Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jun 2024 at 08:14.

Thames Water logo
Between
28 Oct and 3 Nov 2024
Details
View Map
Share
Platts Road

Thames Water were proposing to carry out Utility asset works on Platts Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 08:42.

Thames Water logo
Between
28 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Platts Road

Thames Water are proposing to carry out Utility asset works on Platts Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 08:56.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Oatlands Road

Thames Water are proposing to carry out New service connection on Oatlands Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jul 2024 at 13:50.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Oatlands Road

Thames Water are proposing to carry out New service connection on Oatlands Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 11:34.

Cadent Gas logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Drake Street

Cadent Gas are proposing to carry out Utility asset works on Drake Street, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 13:23.

Cadent Gas logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Drake Street

Cadent Gas are proposing to carry out Utility asset works on Drake Street, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 12:09.

Essex County Council logo
Between
28 Oct and 26 Nov 2024
Details
View Map
Share
Follow
Chequers Walk

Essex County Council are proposing to carry out Highway improvement works on Chequers Walk, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 28 October 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 15:25.

Thames Water logo
LONG TERM
Between
28 Oct 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Crouch Lane

Thames Water are proposing to carry out Utility asset works on Crouch Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 12:42.

Cadent Gas logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Newgatestreet Road

Cadent Gas are proposing to carry out Utility asset works on Newgatestreet Road, Goffs Oak.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:10.

Hertfordshire County Council logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Old Nazeing Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Old Nazeing Road, Broxbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2024 at 14:25.

Eunetworks logo
Between
28 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Old Nazeing Road

Eunetworks are proposing to carry out Utility asset works on Old Nazeing Road, Broxbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Sep 2024 at 11:50.

Hertfordshire County Council logo
Between
29 and 31 Oct 2024
Details
View Map
Share
Follow
Mangrove Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mangrove Lane, Brickendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Sep 2024 at 16:08.

Essex County Council logo
Between
31 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Volunteer Roundabout

Essex County Council are proposing to carry out Remedial works on Volunteer Roundabout, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Jul 2024 at 12:16.

Essex County Council logo
Between
31 Oct and 2 Nov 2024
Details
View Map
Share
Follow
M25 J26 Leave W

Essex County Council are proposing to carry out Highway repair and maintenance works on M25 J26 Leave W, Epping Forest.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 31 Jul 2024 at 11:47.

Cadent Gas logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Hammondstreet Road

Cadent Gas are proposing to carry out Utility asset works on Hammondstreet Road, Cheshunt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 12:56.

Cadent Gas logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Appleby Street

Cadent Gas are proposing to carry out Utility asset works on Appleby Street, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:40.

Hertfordshire County Council logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Maple Park

Hertfordshire County Council are proposing to carry out Highway improvement works on Maple Park, Hoddesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 25 May 2024 at 09:06.

Hertfordshire County Council logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Essex Road

Hertfordshire County Council were proposing to carry out Highway improvement works on Essex Road, Hoddesdon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 11:58.

Hertfordshire County Council logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Pindar Road

Hertfordshire County Council were proposing to carry out Highway improvement works on Pindar Road, Hoddesdon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 11:57.

Essex County Council logo
Between
8 and 15 Nov 2024
Details
View Map
Share
Follow
Waltham Road

Essex County Council are proposing to carry out Highway improvement works on Waltham Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 11:12.

Essex County Council logo
Between
8 and 15 Nov 2024
Details
View Map
Share
Follow
Nazeing Common

Essex County Council are proposing to carry out Highway improvement works on Nazeing Common, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 10:19.

Thames Water logo
Between
9 and 19 Nov 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out New service connection on High Street, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2024 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:40.

Thames Water logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Southbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Southbury Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 09:20.

Thames Water logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Newbury Avenue

Thames Water are proposing to carry out Utility asset works on Newbury Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:33.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Severn Drive

Cadent Gas are proposing to carry out Utility asset works on Severn Drive, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 10:53.

Hertfordshire County Council logo
Between
18 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Granby Park Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Granby Park Road, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 17:40.

Thames Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Rags Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Rags Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 10:44.

Affinity Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Ponsbourne Park

Affinity Water are proposing to carry out Utility repair and maintenance works on Ponsbourne Park, Newgate Street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Sep 2024 at 08:49.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Brancroft Way, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 12:07.

Thames Water logo
LONG TERM
Between
20 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Turkey Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Turkey Street, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 12:08.

UK Power Networks Eastern & London logo
Between
20 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Bulls Cross

UK Power Networks Eastern & London are proposing to carry out New service connection on Bulls Cross, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 13:20.

Essex County Council logo
Between
21 and 30 Nov 2024
Details
View Map
Share
Follow
Waltham Road

Essex County Council are proposing to carry out Highway improvement works on Waltham Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 08:52.

London Borough Of Enfield logo
Between
22 and 25 Nov 2024
Details
View Map
Share
Follow
Park Crescent

London Borough Of Enfield are proposing to carry out Remedial works on Park Crescent, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 19 Sep 2024 at 15:12.

Network Rail logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Ordnance Road

Network Rail are proposing to carry out Works for Rail Purposes on Ordnance Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Sep 2024 at 10:10.

Hertfordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
High Street

Hertfordshire County Council are proposing to carry out Highway improvement works on High Street, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 17:04.

Thames Water logo
Between
29 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:14.

Thames Water logo
Between
29 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 08:36.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Southbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Southbury Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 10:00.

Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Pecks Hill

Harlaxton Energy Networks are proposing to carry out Utility asset works on Pecks Hill, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 15 Aug 2024 at 13:49.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Mott Street

Thames Water are proposing to carry out Utility repair and maintenance works on Mott Street, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:12.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Mott Street

Thames Water are proposing to carry out Utility repair and maintenance works on Mott Street, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 15:52.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lodge Crescent

Thames Water are proposing to carry out Utility asset works on Lodge Crescent, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 11:18.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Newgatestreet Road

Cadent Gas are proposing to carry out Utility asset works on Newgatestreet Road, Goffs Oak.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 15:19.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Newgatestreet Road

Cadent Gas are proposing to carry out Utility asset works on Newgatestreet Road, Goffs Oak.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 12:06.

Thames Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Wellington Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wellington Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 14:31.

Vodafone logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Shernbroke Road

Vodafone are proposing to carry out Utility asset works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 11 Sep 2024 at 10:17.

Vodafone logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Shernbroke Road

Vodafone are proposing to carry out Utility asset works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 18 Sep 2024 at 08:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Dec 2024 and 2 Apr 2025
Details
View Map
Share
Follow
Whitewebbs Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Whitewebbs Lane, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 14:33.


Roadworks Map near to College Road, WALTHAM CROSS, EN8 9LX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Sep 2024 01:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to College Road, WALTHAM CROSS, EN8 9LX (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
GREAT CAMBRIDGE ROAD 
(0.0 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 20 Sep 2024 - 24 Sep 2024
0.0
Details
Share
Follow
2
BT logo
COLLEGE ROAD 
(0.1 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 20 Sep 2024 - 24 Sep 2024
0.1
Details
Share
Follow
3
Hertfordshire County Council logo
URGENT
  
LORDSHIP ROAD 
(0.3 miles)
Hertfordshire County Council
Highway repair and maintenance works - Carriageway -
Complete
19 Sep 2024 11:28 - 11:46
0.3
Details
Share
4
Hertfordshire County Council logo
URGENT
  
LORDSHIP ROAD 
(0.3 miles)
Hertfordshire County Council
Highway repair and maintenance works - Carriageway - Give and take
Complete
19 Sep 2024 09:28 - 14:33
0.3
Details
Share
5
Thames Water logo
URGENT
  
TURNERS HILL 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 19 Sep 2024 09:06
(Scheduled: 19 Sep 2024 - 23 Sep 2024)
0.3
Details
Share
Follow
6
BT logo
CUSSONS CLOSE ROSEDALE 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
18 Sep 2024 09:53 - 15:59
0.7
Details
Share
7
Hertfordshire County Council logo
URGENT
  
COLLETT CLOSE 
(0.7 miles)
Hertfordshire County Council
Highway repair and maintenance works - Carriageway -
Complete
19 Sep 2024 13:52 - 14:46
0.7
Details
Share
8
Hertfordshire County Council logo
URGENT
  
THEOBALDS LANE 
(0.7 miles)
Hertfordshire County Council
Highway repair and maintenance works - Footway - Give and take
Complete
19 Sep 2024 11:42 - 11:43
0.7
Details
Share
9
BT logo
DAVISON DRIVE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 19 Sep 2024 08:56
(Scheduled: 9 Sep 2024 - 20 Sep 2024)
0.8
Details
Share
Follow
10
BT logo
MAJOR
  
DAVISON CLOSE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 10 Sep 2024 10:35
(Scheduled: 9 Sep 2024 - 25 Sep 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.