ROADWORKS SUMMARY
Castle Road, HODDESDON, EN11 0NF
Introduction
View current and future planned roadworks and road closures for Castle Road, EN11 0NF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Castle Road, HODDESDON, EN11 0NF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Castle Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Thursday
UK Power Networks Eastern & London are carrying out New service connection on Bramble Lane, Hoddesdon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 March 2023 at 10:00 and could run through until 26 September 2024. The works will impact the footpath only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 May 2024 at 14:30.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Third Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:39 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:42.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Second Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:38 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:42.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Velizy Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:34 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:37.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Fourth Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 00:00 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Feb 2024 at 07:59.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on First Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 00:00 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Feb 2024 at 08:01.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Hammarskjold Road, Harlow.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 00:00 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Feb 2024 at 07:59.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Fifth Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:35 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:37.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Elizabeth Way, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:36 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:40.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Edinburgh Way, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:35 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:37.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on Edinburgh Way, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:36 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:37.
31 Mar 2026
Essex County Council are carrying out Highway improvement works on A414 Between Northern Town Boundary And Burnt Mill Roundabout, Harlow District, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:37 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2024 at 08:40.
17 Feb 2024 and 23 Feb 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Amwell End, Ware.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2024 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Aug 2024 at 09:24.
29 Jan 2025
Essex County Council are carrying out Highway improvement works on Fifth Avenue, Harlow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 February 2024 at 08:02 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Feb 2024 at 08:05.
18 Oct 2024
Essex County Council are carrying out Highway improvement works on Fourth Avenue, Harlow.
These works are categorised as Major.
The works started on 30 May 2024 at 16:02 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Sep 2024 at 08:21.
20 Dec 2024
Essex County Council are carrying out Highway improvement works on Station Approach, Harlow.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Aug 2024 at 09:08.
9 Sep and 13 Oct 2024
Cadent Gas were proposing to carry out Utility asset works on Hammondstreet Road, Cheshunt.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 13 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 11:19.
Today
Cadent Gas are proposing to carry out Utility asset works on Appleby Street, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 20 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 14:38.
9 and 27 Sep 2024
Cadent Gas are proposing to carry out Utility asset works on Smiths Lane, Cheshunt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 10:52.
16 Dec 2024
Essex County Council are carrying out Highway improvement works on Hammarskjold Road, Harlow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Sep 2024 at 10:39.
Wednesday
Thames Water are carrying out Utility asset works on Nazeing New Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 13:55 and could run through until 25 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:52.
Tuesday
Thames Water are carrying out Utility asset works on New Nazeing Road, Broxbourne.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 13:45 and could run through until 24 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:51.
Thursday
Hertfordshire County Council are carrying out Highway improvement works on Anchor Lane, Wadesmill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2024 at 09:30 and could run through until 26 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Sep 2024 at 11:11.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Warren Park Road, Hertford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 08:45 and could run through until 23 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 10:34.
14 Sep and 18 Oct 2024
Essex County Council are proposing to carry out Highway improvement works on Ecn05017, Harlow District, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 14:26.
18 Oct 2024
Essex County Council are carrying out Highway improvement works on Ecn05017, Harlow District, Harlow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2024 at 00:00 and could run through until 18 October 2024. The works will impact the cycleway only.
This roadwork event was last updated by Essex County Council on 16 Sep 2024 at 11:01.
14 Sep and 18 Oct 2024
Essex County Council are proposing to carry out Highway improvement works on Ecn05017, Harlow District, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 14:27.
18 Oct 2024
Essex County Council are carrying out Highway improvement works on Ecn05017, Harlow District, Harlow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2024 at 00:00 and could run through until 18 October 2024. The works will impact the cycleway only.
This roadwork event was last updated by Essex County Council on 16 Sep 2024 at 10:59.
15 and 30 Sep 2024
Thames Water are proposing to carry out Utility asset works on New Nazeing Road, Broxbourne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:31.
11 Oct 2024
Hertfordshire County Council are carrying out Highway repair and maintenance works on A10 Between Turnford Link And Halfhide Lane, Turnford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 21:00 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 11:06.
16 Sep and 20 Oct 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Epping Road, Epping Upland, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 20 October 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2024 at 07:12.
20 Oct 2024
UK Power Networks Eastern & London are carrying out New service connection on Epping Road, Epping Upland, Epping.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:30 and could run through until 20 October 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 15:26.
16 and 28 Sep 2024
Eunetworks are proposing to carry out Utility asset works on Old Nazeing Road, Broxbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 8 Aug 2024 at 17:12.
16 and 28 Sep 2024
Eunetworks are proposing to carry out Utility asset works on Old Nazeing Road, Broxbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 19 Aug 2024 at 10:45.
Monday
Thames Water are carrying out Utility repair and maintenance works on St Catharines Road, Broxbourne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 12:15 and could run through until 23 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:48.
Monday
Hertfordshire County Council are carrying out Highway improvement works on Hoddesdon Bypass Southbound Entry Slip Amwell Interchange, Stanstead Abbotts.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 09:30 and could run through until 23 September 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 09:34.
Monday
Essex County Council are carrying out Remedial works on Velizy Avenue, Harlow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 00:00 and could run through until 23 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 09:27.
19 and 27 Sep 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Davison Drive, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 22 Jul 2024 at 10:33.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Portland Place, Hertford Heath.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 09:33 and could run through until 25 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 18:11.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Marsh Lane, Ware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2024 and could run through until 23 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Jul 2024 at 09:35.
23 Sep and 1 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Hammondstreet Road, Cheshunt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 10:30.
Wednesday
Affinity Water are proposing to carry out Remedial works on Hoe Lane, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Jul 2024 at 14:00.
Thursday
Affinity Water are proposing to carry out Utility repair and maintenance works on Hamlet Hill, Roydon, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Jul 2024 at 09:54.
Thursday
Affinity Water are proposing to carry out Utility repair and maintenance works on Miles Close, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 26 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 1 Jul 2024 at 14:01.
23 Sep and 11 Oct 2024
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ware Road, Wareside.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 11 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jul 2024 at 09:50.
29 Sep and 4 Oct 2024
Essex County Council are proposing to carry out Highway improvement works on Velizy Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Sep 2024 at 14:06.
29 Sep and 4 Oct 2024
Essex County Council are proposing to carry out Highway improvement works on Velizy Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Sep 2024 at 10:08.
30 Sep and 13 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Hertford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 5 Sep 2024 at 12:32.
30 Sep and 11 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Rush Green Northbound Onslip, Hertford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Jul 2024 at 15:01.
30 Sep and 11 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Jul 2024 at 14:53.
30 Sep and 11 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Junc With A602 Westmill Road Southbound Onslip, Ware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Jul 2024 at 15:00.
30 Sep and 11 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Jul 2024 at 15:01.
1 and 24 Oct 2024
Thames Water are proposing to carry out Utility asset works on Nazeing New Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Jun 2024 at 09:28.
1 and 3 Oct 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Lampits, Hoddesdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 3 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Sep 2024 at 10:54.
1 and 17 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Junc With A602 Westmill Road Southbound Onslip, Ware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 08:05.
1 and 17 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 08:06.
1 and 4 Oct 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Hunsdon Road, Widford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 24 Jul 2024 at 10:35.
2 and 17 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Rush Green Northbound Onslip, Hertford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 08:06.
2 and 17 Oct 2024
Hertfordshire County Council were proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 17 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 09:38.
2 and 17 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 08:06.
3 and 18 Oct 2024
Hertfordshire County Council were proposing to carry out Statutory Infrastructure Works on A10 Rush Green Northbound Onslip, Hertford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 October 2024 and run through until 18 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2024 at 13:38.
3 and 18 Oct 2024
Hertfordshire County Council were proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 October 2024 and run through until 18 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2024 at 13:38.
3 and 18 Oct 2024
Hertfordshire County Council were proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 October 2024 and run through until 18 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Aug 2024 at 13:02.
7 and 10 Oct 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Mill Close, Ware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 10:24.
8 Oct 2024 and 25 Oct 2025
Hertfordshire County Council were proposing to carry out Statutory Infrastructure Works on A10 Rush Green Roundabout To Westmill Road Roundabout, Ware.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 October 2024 and run through until 25 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 Sep 2024 at 13:32.
8 and 18 Oct 2024
Hertfordshire County Council were proposing to carry out Statutory Infrastructure Works on A10 Junc With A602 Westmill Road Southbound Onslip, Ware.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 October 2024 and run through until 18 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2024 at 13:39.
8 and 18 Oct 2024
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on A10 Junc With A602 Westmill Road Southbound Onslip, Ware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Sep 2024 at 11:41.
14 Oct and 1 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Smiths Lane, Cheshunt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 13:58.
14 Oct and 1 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Smiths Lane, Cheshunt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 14:19.
14 Oct and 1 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Bread And Cheese Lane, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:28.
14 and 18 Oct 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on Rye Road, Stanstead Abbotts.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 18 October 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 15:17.
14 and 19 Oct 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hailey Lane, Hailey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 19 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jul 2024 at 15:30.
14 and 30 Oct 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hailey Lane, Hailey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 08:52.
14 and 19 Oct 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hailey Lane, Hoddesdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 19 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 08:40.
14 and 16 Oct 2024
Virgin Media are proposing to carry out Utility asset works on Harlings, Hertford Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 5 Jul 2024 at 13:45.
16 Oct 2024 and 16 Oct 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Holyfield Road, Waltham Abbey Town, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 16 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 6 Aug 2024 at 09:56.
18 and 24 Oct 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Eastwick Hall Lane, Eastwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Jul 2024 at 09:19.
21 Oct and 8 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Bread And Cheese Lane, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 09:54.
21 and 23 Oct 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Street, Hertford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 30 Jul 2024 at 15:24.
21 and 23 Oct 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Cowbridge, Hertford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Aug 2024 at 16:01.
22 Oct and 22 Dec 2024
Thames Water are proposing to carry out Utility asset works on Nazeing New Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 22 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 16 Jul 2024 at 10:54.
22 Oct and 22 Dec 2024
Thames Water are proposing to carry out Utility asset works on Nazeing New Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 22 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 30 Jul 2024 at 12:11.
23 and 25 Oct 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Church Hill, Hertford Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 12 Jul 2024 at 15:02.
23 and 25 Oct 2024
Affinity Water are proposing to carry out Utility asset works on Widford Road, Hunsdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Aug 2024 at 10:55.
24 Oct and 5 Dec 2024
Thames Water are proposing to carry out Utility asset works on Nazeing Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 16 Jul 2024 at 10:55.
24 Oct and 5 Dec 2024
Thames Water are proposing to carry out Utility asset works on Nazeing Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 30 Jul 2024 at 12:08.
24 Oct and 22 Dec 2024
Thames Water are proposing to carry out Utility asset works on Old Nazeing Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Jun 2024 at 08:14.
24 and 28 Oct 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Classified Road C161 Oxbow South Side Of Eastwick Road By Marlers And Pole Hill, High Wych.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 14:41.
25 Oct and 11 Nov 2024
Electricity Network Company were proposing to carry out Utility asset works on Eastwick Road, Eastwick.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 October 2024 and run through until 11 November 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 19 Sep 2024 at 10:40.
25 Oct and 11 Nov 2024
Electricity Network Company were proposing to carry out Utility asset works on Eastwick Road, Eastwick.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 October 2024 and run through until 11 November 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 19 Sep 2024 at 10:47.
25 Oct and 11 Nov 2024
Electricity Network Company are proposing to carry out Utility asset works on Eastwick Road, Eastwick.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2024 and could run through until 11 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 19 Sep 2024 at 10:48.
28 and 30 Oct 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Old Nazeing Road, Broxbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2024 at 14:25.
28 Oct and 9 Nov 2024
Eunetworks are proposing to carry out Utility asset works on Old Nazeing Road, Broxbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 9 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 12 Sep 2024 at 11:50.
28 and 30 Oct 2024
Affinity Water are proposing to carry out Remedial works on Hagsdell Road, Hertford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Jul 2024 at 13:03.
28 and 30 Oct 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Road, Hertford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Jul 2024 at 13:43.
28 and 30 Oct 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Road, Hertford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Aug 2024 at 12:57.
28 Oct and 1 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Croft Road, Ware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:00.
28 Oct and 19 Nov 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ware Road, Wareside.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 19 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Aug 2024 at 11:57.
29 and 31 Oct 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mangrove Lane, Brickendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Sep 2024 at 16:08.
29 Oct and 2 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Fourth Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Feb 2024 at 11:56.
29 Oct and 2 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Fifth Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Feb 2024 at 11:16.
29 Oct and 2 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Fifth Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Feb 2024 at 11:38.
29 Oct and 2 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on First Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Feb 2024 at 15:02.
29 Oct and 2 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Fifth Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Feb 2024 at 10:34.
4 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Hammondstreet Road, Cheshunt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 12:56.
4 and 8 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Appleby Street, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:40.
4 and 29 Nov 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Maple Park, Hoddesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 25 May 2024 at 09:06.
4 and 29 Nov 2024
Hertfordshire County Council were proposing to carry out Highway improvement works on Essex Road, Hoddesdon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 11:58.
4 and 29 Nov 2024
Hertfordshire County Council were proposing to carry out Highway improvement works on Pindar Road, Hoddesdon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 9 Aug 2024 at 11:57.
4 and 6 Nov 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Stanstead Road, Hertford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Jul 2024 at 14:45.
4 and 9 Nov 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Westmill Road, Westmill, Ware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 23 Jul 2024 at 14:22.
4 and 9 Nov 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Westmill Road, Westmill, Ware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Aug 2024 at 08:55.
8 and 15 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on Waltham Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 11:12.
8 and 15 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on Nazeing Common, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 10:19.
13 and 28 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on Fourth Avenue, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Feb 2024 at 11:34.
13 and 28 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on Hodings Road, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Feb 2024 at 14:36.
19 and 25 Nov 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Unclassfied Road U151 From Babbs Green Pst Bakers End To Cold Christmas Lane, Wareside.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 09:52.
21 and 30 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on Waltham Road, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 08:52.
25 and 29 Nov 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on High Street, Cheshunt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 17:04.
25 and 29 Nov 2024
BT are proposing to carry out Utility asset works on Hamstel Road, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Sep 2024 at 12:01.
25 Nov and 7 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cappell Lane, Stanstead Abbotts.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Jul 2024 at 10:16.
2 and 13 Dec 2024
Harlaxton Energy Networks are proposing to carry out Utility asset works on Pecks Hill, Nazeing, Waltham Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 15 Aug 2024 at 13:49.
5 and 16 Dec 2024
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Lower Road, Great Amwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Jul 2024 at 14:50.
12 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Paddock Mead, Harlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 17:27.
16 and 24 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Bryce Close, Ware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 12 Aug 2024 at 10:50.
Roadworks Map near to Castle Road, HODDESDON, EN11 0NF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Castle Road, HODDESDON, EN11 0NF (24 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Sep 2024 - 20 Sep 2024)
Contains public sector information licensed under the Open Government Licence v3.0.