ROADWORKS SUMMARY
West Side, High Road, BROXBOURNE, EN10 6DF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for West Side, High Road, EN10 6DF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to West Side, High Road, BROXBOURNE, EN10 6DF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for West Side, High Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Grid Electricity Transmission logo
LONG TERM
Between
16 Oct 2024 and 16 Oct 2025
Details
View Map
Share
Holyfield Road

National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Holyfield Road, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 October 2024 and run through until 16 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 1 Oct 2024 at 12:03.

Hertfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
White Stubbs Lane

Hertfordshire County Council are carrying out Highway repair and maintenance works on White Stubbs Lane, Broxbourne.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 00:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 May 2025 at 09:59.

Hertfordshire County Council logo
LONG TERM
Until
6 Jul 2025
Details
View Map
Share
Follow
Monarchs Way

Hertfordshire County Council are carrying out roadworks on Monarchs Way, Waltham Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:00 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 27 Mar 2025 at 17:54.

Thames Water logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Stockingswater Lane

Thames Water are carrying out Utility asset works on Stockingswater Lane, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:45 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 10:28.

National Grid Electricity Transmission logo
LONG TERM
Until
18 Aug 2025
Details
View Map
Share
Follow
Rye Road

National Grid Electricity Transmission are carrying out roadworks on Rye Road, Stanstead Abbotts.

These works are categorised as Major.

The works started on 4 March 2025 at 15:00 and could run through until 18 August 2025. The works will impact the verge only.

This roadwork event was last updated by National Grid Electricity Transmission on 4 Mar 2025 at 15:39.

Hertfordshire County Council logo
LONG TERM
Between
10 Mar and 21 Oct 2025
Details
View Map
Share
Dinant Link Road

Hertfordshire County Council were proposing to carry out Highway improvement works on Dinant Link Road, Hoddesdon.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 6 Dec 2024 at 09:02.

Hertfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Crouch Lane

Hertfordshire County Council are carrying out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 09:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Mar 2025 at 10:23.

Hertfordshire County Council logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Eleanor Cross Road

Hertfordshire County Council are carrying out Highway improvement works on Eleanor Cross Road, Waltham Cross.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 March 2025 at 21:00 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 May 2025 at 16:42.

UK Power Networks Eastern & London logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Bullsmoor Lane

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Bullsmoor Lane, Enfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 07:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 09:32.

Cadent Gas logo
LONG TERM
Between
8 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Northaw Road East

Cadent Gas are proposing to carry out Utility asset works on Northaw Road East, Cuffley, Potters Bar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 10:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
14 Apr and 14 Jun 2025
Details
View Map
Share
Turkey Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Turkey Street, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 14 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2025 at 13:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Apr and 18 Aug 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Brancroft Way, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:12.

UK Power Networks Eastern & London logo
LONG TERM
Until
18 Aug 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Brancroft Way, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 13:00 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Apr 2025 at 13:49.

Thames Water logo
LONG TERM
Between
22 Apr and 18 Aug 2025
Details
View Map
Share
Brancroft Way

Thames Water were proposing to carry out Utility asset works on Brancroft Way, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 09:29.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Turkey Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Turkey Street, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 14:24 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 May 2025 at 15:12.

Thames Water logo
LONG TERM
Between
5 May 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Millmarsh Lane

Thames Water are proposing to carry out Utility asset works on Millmarsh Lane, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 12 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 14:46.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Cuffley Hill

Thames Water are carrying out Utility asset works on Cuffley Hill, Goffs Oak.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 17:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 6 Jul 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Brancroft Way, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 11:46.

Cadent Gas logo
LONG TERM
Between
12 May and 20 Jun 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Wormley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:49.

Cadent Gas logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are carrying out Utility asset works on Church Lane, Wormley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 06:23 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 16:52.

Thames Water logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Newbury Avenue

Thames Water are carrying out Utility asset works on Newbury Avenue, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:05 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 09:11.

Thames Water logo
LONG TERM
Until
26 Jan 2026
Details
View Map
Share
Follow
Millmarsh Lane

Thames Water are carrying out Utility asset works on Millmarsh Lane, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 14:10 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:44.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Penton Drive

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Penton Drive, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 12:50.

Hertfordshire County Council logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Penton Drive

Hertfordshire County Council are carrying out Highway repair and maintenance works on Penton Drive, Cheshunt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 08:43 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 17:49.

UK Power Networks Eastern & London logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Turkey Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Turkey Street, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 15:35.

UK Power Networks Eastern & London logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Access Road From Manor Farm Road To 1507-1509 Great Cambridge Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Access Road From Manor Farm Road To 1507-1509 Great Cambridge Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 15:56.

UK Power Networks Eastern & London logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Access Road From Manor Farm Road To 1507-1509 Great Cambridge Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Access Road From Manor Farm Road To 1507-1509 Great Cambridge Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 16:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 May and 4 Jul 2025
Details
View Map
Share
Albany Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Albany Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 10:26.

Cadent Gas logo
LONG TERM
Between
27 May and 25 Jul 2025
Details
View Map
Share
Follow
Northaw Road East

Cadent Gas are proposing to carry out Utility asset works on Northaw Road East, Cuffley, Potters Bar.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 10:38.

Cadent Gas logo
Between
27 May and 16 Jun 2025
Details
View Map
Share
Follow
Amwell Hill

Cadent Gas are proposing to carry out Utility asset works on Amwell Hill, Great Amwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 13:00.

Thames Water logo
Until
18 Jun 2025
Details
View Map
Share
Follow
Brookside

Thames Water are carrying out Utility repair and maintenance works on Brookside, Harlow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 11:00 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:24.

Thames Water logo
LONG TERM
Between
2 Jun 2025 and 6 Apr 2026
Details
View Map
Share
Follow
Millmarsh Lane

Thames Water are proposing to carry out Utility asset works on Millmarsh Lane, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:38.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Halfhide Lane

BT are proposing to carry out Utility asset works on Halfhide Lane, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Apr 2025 at 09:20.

Cadent Gas logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Pepper Hill

Cadent Gas are proposing to carry out Utility asset works on Pepper Hill, Great Amwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 13:00.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Back Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Back Lane, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Feb 2025 at 11:21.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Back Lane

Affinity Water are carrying out Utility repair and maintenance works on Back Lane, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 06:22 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jun 2025 at 08:46.

Hertfordshire County Council logo
LONG TERM
Between
4 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Mandeville Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mandeville Road, Hertford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 24 Mar 2025 at 09:13.

Hertfordshire County Council logo
LONG TERM
Between
4 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Mandeville Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mandeville Road, Hertford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2025 at 23:06.

Hertfordshire County Council logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Follow
White Stubbs Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Apr 2025 at 10:25.

Hertfordshire County Council logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Follow
White Stubbs Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford, Essendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Apr 2025 at 13:25.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Bedford Crescent

Thames Water are proposing to carry out New service connection on Bedford Crescent, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 12:02.

Essex County Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Parklands

Essex County Council are proposing to carry out Remedial works on Parklands, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 May 2025 at 15:15.

Hertfordshire County Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Cuffley Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cuffley Hill, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 May 2025 at 13:31.

Thames Water logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Crouch Lane

Thames Water were proposing to carry out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:08.

Hertfordshire County Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Crouch Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Crouch Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 11 Mar 2025 at 10:40.

Hertfordshire County Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Crouch Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Crouch Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 11 Mar 2025 at 10:43.

Hertfordshire County Council logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Great Cambridge Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Turnford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 Mar 2025 at 11:15.

Hertfordshire County Council logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Great Cambridge Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Turnford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 15:42.

Hertfordshire County Council logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Vancouver Road

Hertfordshire County Council were proposing to carry out Highway improvement works on Vancouver Road, Turnford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 11:54.

Hertfordshire County Council logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Vancouver Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Vancouver Road, Turnford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 10:42.

Hertfordshire County Council logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Vancouver Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Vancouver Road, Turnford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 May 2025 at 09:28.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Hammondstreet Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hammondstreet Road, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2025 at 22:10.

Cadent Gas logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
White Stubbs Lane

Cadent Gas are proposing to carry out Utility asset works on White Stubbs Lane, Broxbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:48.

Virgin Media logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Burton Lane

Virgin Media were proposing to carry out Utility asset works on Burton Lane, Goffs Oak.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Apr 2025 at 11:26.

Hertfordshire County Council logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Cuffley Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cuffley Hill, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Dec 2024 at 08:57.

Hertfordshire County Council logo
Between
10 and 14 Jun 2025
Details
View Map
Share
Follow
Eastwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 4 Apr 2025 at 08:56.

Hertfordshire County Council logo
Between
11 and 14 Jun 2025
Details
View Map
Share
Follow
Eastwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Dec 2024 at 11:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 Jun and 12 Jul 2025
Details
View Map
Share
St Stephens Road

UK Power Networks Eastern & London were proposing to carry out New service connection on St Stephens Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 June 2025 and run through until 12 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 10:26.

Cadent Gas logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Andrews Lane

Cadent Gas are proposing to carry out Utility asset works on Andrews Lane, Goffs Oak.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:17.

Indigo Power logo
LONG TERM
Between
16 Jun and 30 Jul 2025
Details
View Map
Share
Newgatestreet Road

Indigo Power were proposing to carry out Utility asset works on Newgatestreet Road, Goffs Oak.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 4 Apr 2025 at 15:35.

Cadent Gas logo
LONG TERM
Between
16 Jun and 21 Nov 2025
Details
View Map
Share
Follow
Nazeing Road

Cadent Gas are proposing to carry out Utility asset works on Nazeing Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 10:43.

Cadent Gas logo
LONG TERM
Between
16 Jun and 21 Nov 2025
Details
View Map
Share
Follow
Nazeing Road

Cadent Gas are proposing to carry out Utility asset works on Nazeing Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:59.

Hertfordshire County Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
St Cuthberts Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Cuthberts Road, Hoddesdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 20:20.

Hertfordshire County Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Galley Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Galley Green, Hoddesdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 23:04.

Essex County Council logo
Between
17 and 23 Jun 2025
Details
View Map
Share
Follow
Marle Gardens

Essex County Council are proposing to carry out Highway improvement works on Marle Gardens, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Mar 2025 at 10:19.

UK Power Networks Eastern & London logo
Between
20 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Turkey Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Turkey Street, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 16:54.

Essex County Council logo
Between
20 and 26 Jun 2025
Details
View Map
Share
Follow
Marle Gardens

Essex County Council are proposing to carry out Highway improvement works on Marle Gardens, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Feb 2025 at 09:04.

Telefonica UK logo
Between
21 and 26 Jun 2025
Details
View Map
Share
Honey Lane

Telefonica UK were proposing to carry out Utility asset works on Honey Lane, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 June 2025 and run through until 26 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 24 Apr 2025 at 11:46.

UK Power Networks Eastern & London logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Bulls Cross

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bulls Cross, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:04.

Thames Water logo
Between
23 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Rosewood Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Rosewood Drive, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:33.

Thames Water logo
Between
23 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Rosewood Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Rosewood Drive, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 16:46.

Essex County Council logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Parklands

Essex County Council are proposing to carry out Highway improvement works on Parklands, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Apr 2025 at 10:15.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Crouch Lane

Thames Water were proposing to carry out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 29 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 15:05.

Cadent Gas logo
LONG TERM
Between
23 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Cock Lane

Cadent Gas are proposing to carry out Utility asset works on Cock Lane, Hoddesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 12:08.

Hertfordshire County Council logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Eastwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 15:12.

Hertfordshire County Council logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Eastwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 11:57.

Hertfordshire County Council logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Eastwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eastwick Road, Stanstead Abbotts.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 11:56.

Hertfordshire County Council logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Albemarle Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Albemarle Avenue, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 12:42.

Thames Water logo
Between
28 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Crouch Lane

Thames Water are proposing to carry out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 17:16.

Thames Water logo
Between
28 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Crouch Lane

Thames Water are proposing to carry out Statutory Infrastructure Works on Crouch Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:45.

Hertfordshire County Council logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Eleanor Cross Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Eleanor Cross Road, Waltham Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:31.

Hertfordshire County Council logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Eleanor Cross Road

Hertfordshire County Council were proposing to carry out Highway improvement works on Eleanor Cross Road, Waltham Cross.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 21 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 26 Mar 2025 at 16:40.

Hertfordshire County Council logo
LONG TERM
Between
30 Jun and 2 Aug 2025
Details
View Map
Share
Follow
A10 Turnford Link To Hoddesdon Link

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on A10 Turnford Link To Hoddesdon Link, Hoddesdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Dec 2024 at 16:36.

Hertfordshire County Council logo
LONG TERM
Between
30 Jun and 9 Aug 2025
Details
View Map
Share
Follow
A10 Turnford Link To Hoddesdon Link

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on A10 Turnford Link To Hoddesdon Link, Hoddesdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 May 2025 at 09:17.

Hertfordshire County Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
New Park Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Park Road, Newgate Street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Feb 2025 at 11:41.

Hertfordshire County Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
New Park Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Park Road, Newgate Street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 31 Mar 2025 at 15:07.

Cadent Gas logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Cock Lane

Cadent Gas are proposing to carry out Utility asset works on Cock Lane, Hoddesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 11:25.

Hertfordshire County Council logo
Between
3 and 7 Jul 2025
Details
View Map
Share
White Stubbs Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 July 2025 and run through until 7 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 May 2025 at 10:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Whitewebbs Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Whitewebbs Lane, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:06.

UK Power Networks Eastern & London logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Bulls Cross

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Bulls Cross, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 14:52.

UK Power Networks Eastern & London logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Follow
Bulls Cross

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bulls Cross, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 14:55.

Cadent Gas logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Honey Lane

Cadent Gas were proposing to carry out Utility asset works on Honey Lane, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 10:41.

Cadent Gas logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Follow
Rounton Road

Cadent Gas are proposing to carry out Utility asset works on Rounton Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 16:12.

Cadent Gas logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Honey Lane

Cadent Gas are proposing to carry out Utility asset works on Honey Lane, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 16:06.

Indigo Power logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Newgatestreet Road

Indigo Power are proposing to carry out Utility asset works on Newgatestreet Road, Goffs Oak.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 2 May 2025 at 11:14.

UK Power Networks Eastern & London logo
Between
8 and 19 Jul 2025
Details
View Map
Share
Hertford Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Hertford Road, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 19 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 10:27.

Hertfordshire County Council logo
Between
9 and 28 Jul 2025
Details
View Map
Share
Follow
Greenall Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenall Close, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 16 Apr 2025 at 16:19.

Hertfordshire County Council logo
Between
9 and 28 Jul 2025
Details
View Map
Share
Follow
Greenall Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenall Close, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 11:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 Jul and 15 Aug 2025
Details
View Map
Share
Turkey Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Turkey Street, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 July 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 10:27.

Essex County Council logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Avey Lane

Essex County Council are proposing to carry out Highway improvement works on Avey Lane, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 May 2025 at 15:15.

Essex County Council logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Avey Lane

Essex County Council are proposing to carry out Highway improvement works on Avey Lane, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 09:52.

Between
14 and 18 Jul 2025
Details
View Map
Share
Old House Lane

GTC Pipelines were proposing to carry out New service connection on Old House Lane, Roydon, Harlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 9 May 2025 at 11:24.

Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Old House Lane

GTC Pipelines are proposing to carry out New service connection on Old House Lane, Roydon, Harlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 13 May 2025 at 13:49.

Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Old House Lane

GTC Pipelines are proposing to carry out New service connection on Old House Lane, Roydon, Harlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 20 May 2025 at 15:53.

Hertfordshire County Council logo
Between
14 and 21 Jul 2025
Details
View Map
Share
Follow
Lawrence Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Lawrence Avenue, Stanstead Abbotts.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 00:16.

Hertfordshire County Council logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Park Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Park Lane, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 11:32.

Hertfordshire County Council logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Park Lane

Hertfordshire County Council were proposing to carry out Highway improvement works on Park Lane, Waltham Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 July 2025 and run through until 21 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 26 Mar 2025 at 16:41.

Hertfordshire County Council logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Sturlas Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Sturlas Way, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 6 Nov 2024 at 12:01.

Hertfordshire County Council logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Sturlas Way

Hertfordshire County Council were proposing to carry out Highway improvement works on Sturlas Way, Waltham Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 July 2025 and run through until 21 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 09:43.

Hertfordshire County Council logo
Between
18 and 23 Jul 2025
Details
View Map
Share
Follow
Cuffley Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cuffley Hill, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 30 Apr 2025 at 15:24.

Hertfordshire County Council logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Cuffley Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cuffley Hill, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 13:44.

BT logo
Between
18 and 21 Jul 2025
Details
View Map
Share
Follow
Reeves Lane

BT are proposing to carry out Utility asset works on Reeves Lane, Essex, Harlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 July 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 2 May 2025 at 09:00.

BT logo
Between
18 and 21 Jul 2025
Details
View Map
Share
Follow
Reeves Lane

BT are proposing to carry out Utility asset works on Reeves Lane, Essex, Harlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 July 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 12 May 2025 at 14:06.

UK Power Networks Eastern & London logo
Between
19 Jul and 8 Aug 2025
Details
View Map
Share
Bullsmoor Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Bullsmoor Lane, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 10:28.

Cadent Gas logo
LONG TERM
Between
19 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Cattlegate Road

Cadent Gas are proposing to carry out Utility asset works on Cattlegate Road, Cuffley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 11:53.

Cadent Gas logo
LONG TERM
Between
19 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Northaw Road East

Cadent Gas are proposing to carry out Utility asset works on Northaw Road East, Cuffley, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 11:52.

Affinity Water logo
Between
19 and 21 Jul 2025
Details
View Map
Share
Follow
Newgate Street Village

Affinity Water are proposing to carry out Utility repair and maintenance works on Newgate Street Village, Newgate Street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Mar 2025 at 13:50.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul and 13 Sep 2025
Details
View Map
Share
Follow
Great Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Cambridge Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul and 13 Sep 2025
Details
View Map
Share
Follow
Cambridge Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Gardens, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2025 at 14:36.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Jul and 3 Sep 2025
Details
View Map
Share
Follow
Mollison Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Mollison Avenue, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Jul and 8 Sep 2025
Details
View Map
Share
Follow
Whitewebbs Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Whitewebbs Lane, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 14:06.

Hertfordshire County Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Eleanor Cross Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Eleanor Cross Road, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 13:56.

Cadent Gas logo
Between
21 and 28 Jul 2025
Details
View Map
Share
Follow
Rosebank

Cadent Gas are proposing to carry out Utility asset works on Rosebank, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 12:16.

Cadent Gas logo
Between
21 and 28 Jul 2025
Details
View Map
Share
Follow
Rosebank

Cadent Gas are proposing to carry out Utility asset works on Rosebank, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 11:47.

Essex County Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Middle Street

Essex County Council are proposing to carry out Highway improvement works on Middle Street, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 May 2025 at 09:56.

Essex County Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Middle Street

Essex County Council are proposing to carry out Highway improvement works on Middle Street, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 09:52.

Cadent Gas logo
LONG TERM
Between
23 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Cattlegate Road

Cadent Gas are proposing to carry out Utility asset works on Cattlegate Road, Cuffley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 13:44.

Cadent Gas logo
LONG TERM
Between
23 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Cattlegate Road

Cadent Gas are proposing to carry out Utility asset works on Cattlegate Road, Cuffley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 13:42.

Cadent Gas logo
LONG TERM
Between
23 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Cattlegate Road

Cadent Gas are proposing to carry out Utility asset works on Cattlegate Road, Cuffley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 10:00.

Cadent Gas logo
LONG TERM
Between
23 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Northaw Road East

Cadent Gas are proposing to carry out Utility asset works on Northaw Road East, Cuffley, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 13:36.

Cadent Gas logo
LONG TERM
Between
23 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Northaw Road East

Cadent Gas are proposing to carry out Utility asset works on Northaw Road East, Cuffley, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 11:33.

Hertfordshire County Council logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
White Stubbs Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 11:18.

Hertfordshire County Council logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
White Stubbs Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford, Essendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 12:06.

Hertfordshire County Council logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Mangrove Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mangrove Lane, Brickendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Mar 2025 at 14:39.

UK Power Networks Eastern & London logo
Between
25 Jul and 13 Aug 2025
Details
View Map
Share
Elsinge Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Elsinge Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 July 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 15:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Jul and 9 Oct 2025
Details
View Map
Share
Whitewebbs Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Whitewebbs Lane, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 July 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 15:18.

UK Power Networks Eastern & London logo
Between
25 Jul and 4 Aug 2025
Details
View Map
Share
Bulls Cross

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Bulls Cross, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 July 2025 and run through until 4 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 15:22.

Cadent Gas logo
LONG TERM
Between
26 Jul and 5 Sep 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Hoddesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 15:57.

Cadent Gas logo
Between
26 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Cock Lane

Cadent Gas are proposing to carry out Utility asset works on Cock Lane, Hoddesdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 16:10.

UK Power Networks Eastern & London logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ordnance Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Ordnance Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 10:45.

UK Power Networks Eastern & London logo
Between
28 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Turkey Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Turkey Street, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 15:36.

Thames Water logo
Between
28 Jul and 17 Aug 2025
Details
View Map
Share
Bullsmoor Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Bullsmoor Lane, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 17 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:43.

Thames Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Bullsmoor Lane

Thames Water are proposing to carry out New service connection on Bullsmoor Lane, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 14:13.

Cadent Gas logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Patmore Road

Cadent Gas are proposing to carry out Utility asset works on Patmore Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 13:35.

Cadent Gas logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Patmore Road

Cadent Gas are proposing to carry out Utility asset works on Patmore Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 12:32.

Cadent Gas logo
Between
28 Jul and 6 Aug 2025
Details
View Map
Share
Stonyshotts

Cadent Gas were proposing to carry out Utility asset works on Stonyshotts, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 6 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 11:48.

Cadent Gas logo
Between
28 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Stonyshotts

Cadent Gas are proposing to carry out Utility asset works on Stonyshotts, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 16:15.

Thames Water logo
Between
28 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Goffs Lane

Thames Water are proposing to carry out Statutory Infrastructure Works on Goffs Lane, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 13:48.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Great Cambridge Road

Hertfordshire County Council were proposing to carry out Highway improvement works on Great Cambridge Road, Cheshunt.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 13:55.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Church Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Church Lane, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2025 at 09:49.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Church Lane

Hertfordshire County Council were proposing to carry out Highway improvement works on Church Lane, Cheshunt.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 11:57.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Great Cambridge Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2025 at 09:16.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Great Cambridge Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Cheshunt.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 Mar 2025 at 13:07.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Church Lane

Hertfordshire County Council were proposing to carry out Highway improvement works on Church Lane, Cheshunt.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 5 Mar 2025 at 11:59.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Church Lane

Hertfordshire County Council were proposing to carry out Highway improvement works on Church Lane, Cheshunt.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 08:09.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Great Cambridge Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Great Cambridge Road, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2025 at 08:37.

Thames Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Andrews Lane

Thames Water are proposing to carry out Statutory Infrastructure Works on Andrews Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:12.

Essex County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Low Hill Road

Essex County Council are proposing to carry out Highway improvement works on Low Hill Road, Roydon, Harlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 1 May 2025 at 13:53.

Essex County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Low Hill Road

Essex County Council are proposing to carry out Highway improvement works on Low Hill Road, Roydon, Harlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 09:52.

Hertfordshire County Council logo
Between
28 Jul and 7 Aug 2025
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Hertford Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 15:14.

Affinity Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Bullocks Lane

Affinity Water are proposing to carry out Remedial works on Bullocks Lane, Hertford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Apr 2025 at 10:53.

Hertfordshire County Council logo
Between
28 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Morgans Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Morgans Road, Hertford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Apr 2025 at 10:17.

Hertfordshire County Council logo
Between
28 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Morgans Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Morgans Road, Hertford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 May 2025 at 19:48.

Cadent Gas logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Cautherly Lane

Cadent Gas are proposing to carry out Utility asset works on Cautherly Lane, Great Amwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 13:30.

Virgin Media logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Burton Lane

Virgin Media are proposing to carry out Utility asset works on Burton Lane, Goffs Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 May 2025 at 11:59.

Hertfordshire County Council logo
Between
1 and 4 Aug 2025
Details
View Map
Share
Follow
Church Lane

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Church Lane, Wormley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 11:46.

Hertfordshire County Council logo
Between
1 and 4 Aug 2025
Details
View Map
Share
Follow
White Stubbs Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 May 2025 at 10:33.

Hertfordshire County Council logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
White Stubbs Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on White Stubbs Lane, Bayford, Essendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 May 2025 at 17:28.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Tennyson Avenue

Cadent Gas are proposing to carry out Utility asset works on Tennyson Avenue, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 10:12.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Tennyson Avenue

Cadent Gas are proposing to carry out Utility asset works on Tennyson Avenue, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 11:41.

UK Power Networks Eastern & London logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Hammondstreet Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hammondstreet Road, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 May 2025 at 15:29.

Hertfordshire County Council logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Follow
Church Lane

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Church Lane, Wormley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 11:35.

Cadent Gas logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Hillside Lane

Cadent Gas are proposing to carry out Utility asset works on Hillside Lane, Great Amwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 13:30.

Hertfordshire County Council logo
Between
5 and 8 Aug 2025
Details
View Map
Share
Follow
High Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Road, Broxbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 13:43.

Hertfordshire County Council logo
Between
7 and 13 Aug 2025
Details
View Map
Share
Follow
Bayford Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bayford Close, Hertford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 07:59.

G2 Energy IDNO logo
Between
9 and 15 Aug 2025
Details
View Map
Share
Follow
Access Road From Bullsmoor Lane To 1604-1750 Great Cambridge Road

G2 Energy IDNO are proposing to carry out New service connection on Access Road From Bullsmoor Lane To 1604-1750 Great Cambridge Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 6 May 2025 at 11:54.

UK Power Networks Eastern & London logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Turkey Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Turkey Street, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 15:37.

UK Power Networks Eastern & London logo
Between
11 and 18 Aug 2025
Details
View Map
Share
Follow
Elsinge Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Elsinge Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 10:25.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Shernbroke Road

Cadent Gas are proposing to carry out Utility asset works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 14:24.

Essex County Council logo
Between
11 and 16 Aug 2025
Details
View Map
Share
Follow
Parklands

Essex County Council are proposing to carry out Highway improvement works on Parklands, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 08:27.

Hertfordshire County Council logo
Between
12 and 23 Aug 2025
Details
View Map
Share
Follow
Station Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 11:22.

Hertfordshire County Council logo
Between
12 and 23 Aug 2025
Details
View Map
Share
Follow
Eleanor Cross Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Eleanor Cross Road, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 11:22.

Hertfordshire County Council logo
Between
12 and 23 Aug 2025
Details
View Map
Share
Follow
Monarchs Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Monarchs Way, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 11:21.

Affinity Water logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Betts Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Betts Lane, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 May 2025 at 09:44.

Hertfordshire County Council logo
Between
14 and 26 Aug 2025
Details
View Map
Share
Follow
Elm Drive

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elm Drive, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 May 2025 at 10:06.

Cadent Gas logo
Between
15 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Turkey Street

Cadent Gas are proposing to carry out Utility asset works on Turkey Street, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 13:21.

Cadent Gas logo
Between
15 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Hertford Road

Cadent Gas are proposing to carry out Utility asset works on Hertford Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 13:23.

UK Power Networks Eastern & London logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Elsinge Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Elsinge Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Mar 2025 at 14:59.

Hertfordshire County Council logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
Hurst Drive

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hurst Drive, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 13:18.

Hertfordshire County Council logo
Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Rosedale Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Rosedale Way, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:37.

Cadent Gas logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
North Street

Cadent Gas are proposing to carry out Utility asset works on North Street, Nazeing, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 10:11.

Hertfordshire County Council logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Hailey Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hailey Lane, Hailey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 30 Apr 2025 at 10:09.

Hertfordshire County Council logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Hailey Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hailey Lane, Hoddesdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 14:45.

Hertfordshire County Council logo
Between
21 Aug and 3 Sep 2025
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Hertford Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 11:09.

UK Power Networks Eastern & London logo
Between
25 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Hertford Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hertford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 08:28.

Cadent Gas logo
Between
25 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Pepper Hill

Cadent Gas are proposing to carry out Utility asset works on Pepper Hill, Great Amwell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 14:00.

Hertfordshire County Council logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Eleanor Cross Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Eleanor Cross Road, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 10:31.

Cadent Gas logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Farm Hill Road

Cadent Gas were proposing to carry out Utility asset works on Farm Hill Road, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 17:08.

Cadent Gas logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Farm Hill Road

Cadent Gas are proposing to carry out Utility asset works on Farm Hill Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 16:00.

Cadent Gas logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Farm Hill Road

Cadent Gas were proposing to carry out Utility asset works on Farm Hill Road, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:21.

Hertfordshire County Council logo
Between
28 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Monarchs Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Monarchs Way, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Jan 2025 at 16:04.


Roadworks Map near to West Side, High Road, BROXBOURNE, EN10 6DF (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 09:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to West Side, High Road, BROXBOURNE, EN10 6DF (23 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
THE OVAL 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
2 Jun 2025 09:06 - 12:09
0.1
Details
Share
2
BT logo
ROWAN DRIVE 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.2
Details
Share
Follow
3
BT logo
ROWAN DRIVE 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.2
Details
Share
Follow
4
BT logo
THE CANADAS 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 30 May 2025 - 3 Jun 2025
0.3
Details
Share
Follow
5
BT logo
MACERS LANE 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.3
Details
Share
Follow
6
BT logo
FAIRFIELD DRIVE 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 2 Jun 2025 12:49
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.3
Details
Share
Follow
7
BT logo
HURON ROAD 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 30 May 2025 - 3 Jun 2025
0.4
Details
Share
Follow
8
BT logo
BROOMFIELD AVENUE 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.4
Details
Share
Follow
9
Hertfordshire County Council logo
A10 BETWEEN TURNFORD LINK AND HALFHIDE LANE 
(0.4 miles)
Hertfordshire County Council
Highway improvement works - Verge - Lane closure
In Progress
Since: 2 Jun 2025 09:30
(Scheduled: 2 Jun 2025 - 12 Jun 2025)
0.4
Details
Share
Follow
10
Cadent Gas logo
HIGH ROAD 
(0.4 miles)
Cadent Gas
New service connection - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.4
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.