ROADWORKS SUMMARY
Cornwall Road, STOURBRIDGE, DY8 4TJ
Introduction

View current and future planned roadworks and road closures for Cornwall Road, DY8 4TJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Cornwall Road, STOURBRIDGE, DY8 4TJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cornwall Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
31 Oct 2025
Transport for West Midlands (TfWM) are carrying out roadworks on Castle Hill, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2023 at 00:01 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:41.
31 Oct 2025
Transport for West Midlands (TfWM) are carrying out roadworks on Trindle Road, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2023 at 16:30 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:43.
21 Dec 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Birmingham Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 October 2023 at 00:01 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 1 May 2025 at 15:28.
31 Oct 2025
Transport for West Midlands (TfWM) are carrying out roadworks on King Street, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 November 2023 at 07:00 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:41.
21 Dec 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on King Street, Dudley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 November 2023 at 07:00 and could run through until 21 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:41.
21 Dec 2025
Transport for West Midlands (TfWM) are carrying out roadworks on Birmingham Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2023 at 07:00 and could run through until 21 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 1 May 2025 at 15:28.
31 Oct 2025
Transport for West Midlands (TfWM) are carrying out Works for road purposes on The Broadway, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 09:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:43.
9 Jan and 1 Oct 2025
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Trindle Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Nov 2024 at 08:33.
21 Apr 2025 and 19 Apr 2026
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 19 April 2026. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Dec 2024 at 12:49.
21 Apr 2025 and 19 Apr 2026
Transport for West Midlands (TfWM) were proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 19 April 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Apr 2025 at 08:54.
21 May and 23 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 12:26.
20 Jun 2025 and 15 Sep 2026
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Porters Field, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 15 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 May 2025 at 11:27.
20 Jun 2025 and 15 Sep 2026
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on St Joseph Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 15 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 May 2025 at 11:28.
30 Jun and 22 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Western Road, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 6 Jun 2025 at 10:28.
12 Sep 2025
Transport for West Midlands (TfWM) are carrying out Utility asset works on Level Street, Brierley Hill.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 July 2025 at 07:30 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Jul 2025 at 09:17.
17 Jul 2025 and 16 Jan 2026
Cadent Gas were proposing to carry out Utility asset works on Worcester Road, West Hagley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 July 2025 and run through until 16 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 10:34.
17 Jul and 11 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Newfield Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 14:30.
17 Jul and 9 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 18:30.
22 Jul and 17 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Halesowen.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 July 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:07.
22 Jul and 17 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Halesowen.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 July 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:48.
28 Jul and 26 Sep 2025
Worcestershire County Council were proposing to carry out Highway improvement works on Wolverhampton Road, Cookley, Kidderminster.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 26 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 24 Jun 2025 at 10:28.
28 Jul and 26 Sep 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Wolverhampton Road, Cookley, Kidderminster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Worcestershire County Council on 8 Jul 2025 at 15:12.
28 Jul and 12 Oct 2025
Worcestershire County Council were proposing to carry out Highway improvement works on The Crescent, Cookley, Kidderminster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 12 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 24 Jun 2025 at 11:07.
28 Jul and 12 Oct 2025
Worcestershire County Council are proposing to carry out Highway improvement works on The Crescent, Cookley, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Worcestershire County Council on 8 Jul 2025 at 15:14.
Monday
Cadent Gas were proposing to carry out Utility asset works on Hillfields Road, Brierley Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 15:45.
Monday
Cadent Gas were proposing to carry out Utility asset works on Hillfields Road, Brierley Hill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 15:25.
4 Aug and 26 Sep 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Morfe House Lane, Lutley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 12 May 2025 at 15:35.
11 Aug and 3 Oct 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Castle Hill, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Apr 2025 at 08:47.
25 Oct 2025
Transport for West Midlands (TfWM) are carrying out Works for road purposes on Castle Hill, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 04:00 and could run through until 25 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Aug 2025 at 09:04.
Friday
Cadent Gas are carrying out Utility asset works on Tiled House Lane, Pensnett.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 August 2025 at 17:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 08:08.
18 Aug and 12 Sep 2025
South Staffordshire Water are proposing to carry out Utility asset works on Stourdell Road, Cradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 10:08.
12 Sep 2025
South Staffordshire Water are carrying out Utility asset works on Stourdell Road, Cradley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 09:00 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 18 Aug 2025 at 09:31.
6 Oct 2025
Cadent Gas are carrying out Utility asset works on Brettell Lane, Brierley Hill.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 08:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 10:27.
Monday
Cadent Gas are proposing to carry out Utility asset works on Gervase Drive, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 12:19.
21 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Amblecote.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:06.
21 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Hillfields Road, Brierley Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:40.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Kidderminster Road South, Hagley.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 11:22 and could run through until 5 September 2025. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 14:30.
25 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Nuthatch Drive, Quarry Bank.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:31.
16 Sep 2025
Cadent Gas are carrying out Utility asset works on Nuthatch Drive, Quarry Bank.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 08:00 and could run through until 16 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 08:01.
25 Aug and 10 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Central Drive, Lower Gornal.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 8 May 2025 at 10:00.
25 Aug and 15 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Gervase Drive, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:12.
25 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Gervase Drive, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 12:01.
21 Oct 2025
Cadent Gas are carrying out Utility asset works on Hambleton Road, Hayley Green.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 08:30 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:12.
Tuesday
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bassnage Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Jun 2025 at 11:36.
Tuesday
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Severn Road, Cradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 11:13.
26 Aug and 26 Oct 2025
Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 20 Aug 2025 at 11:34.
Tuesday
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Smithy Lane, Pensnett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Jun 2025 at 08:59.
Friday
Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Salop Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 11:06 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 26 Aug 2025 at 13:05.
11 Sep 2025
Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Bassnage Road, Halesowen.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 10:00 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 29 Aug 2025 at 11:33.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Birmingham Street, Stourbridge.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 August 2025 at 11:18 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 14:36.
12 Sep 2025
Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Severn Road, Cradley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 August 2025 at 09:00 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 1 Sep 2025 at 09:07.
12 Sep 2025
Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Smithy Lane, Pensnett.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 August 2025 at 09:00 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 1 Sep 2025 at 09:06.
31 Aug and 19 Oct 2025
Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2025 and could run through until 19 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 13 Mar 2025 at 09:36.
1 and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Brookland Road, Hagley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 11:32.
1 Sep and 15 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ridge Grove, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:40.
1 and 12 Sep 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on High Street, Cradley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Jun 2025 at 10:37.
1 Sep and 31 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stewkins, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 7 May 2025 at 11:57.
1 and 13 Sep 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Upper High Street, Cradley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Aug 2025 at 10:58.
1 and 13 Sep 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Upper High Street, Cradley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 26 Aug 2025 at 15:32.
1 Sep and 31 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hartland Street, Pensnett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 May 2025 at 11:19.
1 Sep and 31 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vicarage Lane, Pensnett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 21 May 2025 at 09:29.
1 Sep and 31 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High View Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 20 May 2025 at 15:13.
1 Sep and 31 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hazel Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 09:26.
1 and 28 Sep 2025
South Staffordshire Water are proposing to carry out Utility asset works on Roberts Green Road, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:46.
28 Sep 2025
South Staffordshire Water are carrying out Utility asset works on Roberts Green Road, Upper Gornal.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 12:00 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 1 Sep 2025 at 12:39.
1 and 28 Sep 2025
South Staffordshire Water are proposing to carry out Utility asset works on Roundhouse Road, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:43.
28 Sep 2025
South Staffordshire Water are carrying out Utility asset works on Roundhouse Road, Upper Gornal.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 12:00 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 1 Sep 2025 at 12:40.
1 Sep and 31 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sunnybank Road, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 23 May 2025 at 13:39.
1 Sep and 31 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sunnybank Road, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 08:31.
Friday
Staffordshire County Council are carrying out Highway improvement works on Common Road, Wombourne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 12:35 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2025 at 12:54.
Staffordshire County Council carried out Highway improvement works on Planks Lane, Wombourne.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 1 Sep 2025 and 5 Sep 2025 and were actually completed between 2 Sep 2025 (10:23) and 3 Sep 2025 (12:12). The works impacted the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2025 at 12:16.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Bullmeadow Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Jun 2025 at 09:43.
Monday
Western Power Distribution (West Midlands) are carrying out Utility repair and maintenance works on Southgate, Cradley Heath.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 12:30 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Sep 2025 at 13:10.
Monday
Western Power Distribution (West Midlands) are carrying out Utility repair and maintenance works on Halesowen Road, Cradley Heath.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 10:15 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Sep 2025 at 11:41.
Monday
Severn Trent Water are carrying out Utility repair and maintenance works on Adshead Road, Dudley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 08:00 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Sep 2025 at 10:32.
Staffordshire County Council carried out Highway improvement works on Mile Flat, Greensforge.
The road was closed for some or all of the period.
The works were completed on 3 September 2025 The works impacted the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2025 at 11:58.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Stallings Lane, Kingswinford.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 09:46 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 10:31.
5 Sep and 27 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Western Road, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 September 2025 and run through until 27 November 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:20.
8 Sep and 7 Nov 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Wolverhampton Road, Cookley, Kidderminster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 13 Aug 2025 at 10:40.
8 Sep and 24 Nov 2025
Worcestershire County Council are proposing to carry out Highway improvement works on The Crescent, Cookley, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 13 Aug 2025 at 10:43.
8 Sep and 27 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Worcester Road, West Hagley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:10.
8 and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 16:02.
8 and 22 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 17:06.
8 and 22 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Summervale Road, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 17:07.
8 Sep and 27 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Worcester Road, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 07:48.
8 and 12 Sep 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on The Broadway, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Jun 2025 at 11:50.
8 Sep and 17 Oct 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Graingers Lane, Cradley Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 26 Aug 2025 at 14:51.
8 Sep and 17 Oct 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Graingers Lane, Cradley Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 26 Aug 2025 at 14:52.
8 and 19 Sep 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Knarsdale Close, Brierley Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Jun 2025 at 09:16.
8 Sep and 2 Nov 2025
Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 27 Aug 2025 at 08:06.
8 and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 16:38.
8 Sep and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on The Straits, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 09:18.
8 and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on High Arcal Road, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 09:18.
8 and 12 Sep 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Meadow Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Jun 2025 at 08:04.
11 Sep and 16 Oct 2025
Worcestershire County Council are proposing to carry out Section 50 on Station Drive, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 7 Jul 2025 at 11:47.
11 Sep and 16 Oct 2025
Worcestershire County Council are proposing to carry out Section 50 on Station Drive, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 11 Jul 2025 at 16:08.
11 Sep and 16 Oct 2025
Worcestershire County Council are proposing to carry out Section 50 on Station Drive, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 7 Jul 2025 at 14:22.
11 Sep and 16 Oct 2025
Worcestershire County Council are proposing to carry out Section 50 on Station Drive, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 11 Jul 2025 at 16:08.
11 Sep and 19 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Thicknall Rise, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2025 and run through until 19 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 13:39.
15 and 26 Sep 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Worcester Road, West Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 May 2025 at 08:07.
15 and 26 Sep 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Kidderminster Road South, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 May 2025 at 08:01.
15 and 26 Sep 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Worcester Road, West Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 May 2025 at 08:02.
15 and 26 Sep 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Kidderminster Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 May 2025 at 08:02.
15 Sep and 13 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Kittiwake Drive, Quarry Bank.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:31.
15 and 29 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Byron Croft, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 14:57.
16 and 22 Sep 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on The Broadway, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Jun 2025 at 11:25.
16 and 18 Sep 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on The Minories, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Aug 2025 at 12:38.
16 and 18 Sep 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Flood Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 14:21.
18 and 26 Sep 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High View Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 11:02.
22 and 26 Sep 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Thicknall Rise, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 7 Jul 2025 at 15:21.
22 and 26 Sep 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Thicknall Rise, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 8 Jul 2025 at 09:38.
22 Sep and 1 Oct 2025
Worcestershire County Council were proposing to carry out Highway improvement works on Western Road, Hagley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 1 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 3 Jul 2025 at 11:05.
22 and 26 Sep 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Caunsall Road, Caunsall, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 4 Jul 2025 at 10:43.
22 Sep and 17 Oct 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Caunsall Road, Caunsall, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 13 Aug 2025 at 09:23.
22 and 26 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Grange Lane, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 14:22.
22 and 26 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Grange Lane, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 15:57.
22 and 26 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Grange Lane, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 10:57.
22 Sep and 6 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Hawne Lane, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 15:18.
22 Sep and 6 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Hawne Lane, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 10:18.
22 Sep and 6 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Hawne Lane, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:48.
22 Sep and 6 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Hayseech Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 15:20.
22 Sep and 6 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Hayseech Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:49.
22 Sep and 30 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Wrights Lane, Cradley Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 10:29.
22 and 24 Sep 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Flood Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Aug 2025 at 11:53.
22 Sep and 17 Oct 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Hall Street, Dudley.
These works are categorised as Major.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 10:25.
22 Sep and 17 Oct 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Hall Street, Dudley.
These works are categorised as Major.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 10:43.
22 Sep and 12 Oct 2025
South Staffordshire Water are proposing to carry out Utility asset works on Kinfare Rise, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:46.
22 Sep and 12 Oct 2025
South Staffordshire Water are proposing to carry out Utility asset works on Kinfare Rise, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 17 Jul 2025 at 12:10.
22 Sep and 12 Oct 2025
South Staffordshire Water are proposing to carry out Utility asset works on Naylors Grove, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:43.
22 Sep and 12 Oct 2025
South Staffordshire Water are proposing to carry out Utility asset works on Naylors Grove, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 17 Jul 2025 at 12:10.
23 Sep and 29 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Thicknall Rise, Hagley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 15:41.
23 and 26 Sep 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stewkins, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 10:05.
25 Sep and 10 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 17:08.
26 Sep and 10 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 14:16.
27 Sep and 12 Oct 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Wolverhampton Road, Cookley, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 8 Jul 2025 at 15:17.
29 Sep and 10 Oct 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on New Wood Lane, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 4 Jul 2025 at 11:38.
29 Sep and 10 Oct 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on New Wood Lane, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Jul 2025 at 16:07.
29 Sep and 20 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Worcester Road, Hagley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 May 2025 at 09:03.
29 Sep and 13 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Kidderminster Road, Hagley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 11:03.
29 Sep and 13 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Summervale Road, Hagley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 14:43.
29 Sep and 24 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Meadowbrook Road, Halesowen.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Jun 2025 at 19:24.
29 Sep and 27 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Meadowbrook Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 15:07.
29 Sep and 27 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Briery Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 15:06.
29 Sep and 1 Oct 2025
Severn Trent Water were proposing to carry out Remedial works on Brick Kiln Street, Quarry Bank.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Jul 2025 at 13:51.
29 Sep and 3 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hartland Street, Pensnett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 10:49.
29 Sep and 3 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vicarage Lane, Pensnett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 10:50.
29 Sep and 14 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Grosvenor Road South, Lower Gornal.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 May 2025 at 10:10.
29 Sep and 17 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Grosvenor Road, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:10.
29 Sep and 3 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hazel Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 9 Jun 2025 at 10:35.
29 Sep and 13 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Browning Road, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 15:54.
29 Sep and 3 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sunnybank Road, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 12:07.
29 Sep and 3 Oct 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Windsor Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Jun 2025 at 07:41.
29 Sep and 3 Oct 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Jun 2025 at 10:01.
1 and 15 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hambleton Road, Hayley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:39.
1 and 15 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fatherless Barn Crescent, Cradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:39.
1 and 15 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lusbridge Close, Cradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:39.
1 and 15 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Shepherds Brook Road, Lye.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:40.
1 and 3 Oct 2025
South Staffordshire Water are proposing to carry out Remedial works on Colley Lane, Cradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 8 Jul 2025 at 12:27.
1 and 15 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Monteagle Drive, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Jun 2025 at 08:59.
1 and 15 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Charlecote Drive, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Jun 2025 at 09:00.
1 and 3 Oct 2025
BT are proposing to carry out Utility asset works on Summer Lane, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 29 Jul 2025 at 12:19.
1 and 3 Oct 2025
BT are proposing to carry out Utility asset works on Summer Lane, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 29 Jul 2025 at 15:15.
1 and 14 Oct 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on High Street, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Jul 2025 at 13:52.
1 and 14 Oct 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Maypole Street, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Jul 2025 at 13:52.
6 and 17 Oct 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Caunsall Road, Caunsall, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Aug 2025 at 13:58.
6 and 10 Oct 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 16:14.
6 and 10 Oct 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Aug 2025 at 08:03.
6 and 8 Oct 2025
South Staffordshire Water were proposing to carry out Utility repair and maintenance works on Church Road, Netherton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 15 Jul 2025 at 09:07.
6 Oct and 15 Dec 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Morfe House Lane, Lutley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 15 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 18:08.
6 and 27 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Bluebell Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 17:42.
6 and 27 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Priory Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 17:41.
6 Oct and 1 Nov 2025
South Staffordshire Water are proposing to carry out Utility asset works on Cricket Meadow, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:46.
6 Oct and 1 Nov 2025
South Staffordshire Water are proposing to carry out Utility asset works on Cricket Meadow, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 17 Jul 2025 at 12:11.
6 and 17 Oct 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on High Street, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Aug 2025 at 13:16.
6 and 17 Oct 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Maypole Street, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Aug 2025 at 13:16.
8 and 10 Oct 2025
Severn Trent Water are proposing to carry out Remedial works on Brick Kiln Street, Quarry Bank.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 31 Jul 2025 at 10:27.
8 and 10 Oct 2025
Severn Trent Water are proposing to carry out Remedial works on Brick Kiln Street, Quarry Bank.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 08:36.
10 and 24 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Western Road, Hagley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 12:46.
10 Oct and 17 Dec 2025
Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 October 2025 and run through until 17 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 15:46.
10 Oct and 17 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:57.
13 and 27 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Cedar Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 17:43.
16 Oct and 12 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Churchill Lane, Churchill, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:22.
16 and 30 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Crown Lane, Iverley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 October 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 15:32.
16 and 31 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Love Lane, Oldswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 13 May 2025 at 08:35.
17 Oct and 24 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 20:57.
20 Oct and 3 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cheviot Way, Hayley Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Jun 2025 at 11:35.
20 and 22 Oct 2025
BT were proposing to carry out Utility asset works on Junction Road, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Sep 2025 at 12:23.
20 and 24 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 22 Jul 2025 at 11:14.
20 and 22 Oct 2025
Severn Trent Water are proposing to carry out New service connection on Wood Street, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 18 Jul 2025 at 10:33.
20 and 22 Oct 2025
Severn Trent Water are proposing to carry out New service connection on Wood Street, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Jul 2025 at 11:50.
20 Oct and 9 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stockwell Avenue, Quarry Bank.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 May 2025 at 12:50.
20 Oct and 16 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Acres Road, Quarry Bank.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 May 2025 at 12:50.
20 Oct and 10 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Maple Road, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:10.
20 Oct and 3 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Lavender Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:11.
21 and 31 Oct 2025
Worcestershire County Council were proposing to carry out Highway improvement works on Western Road, Hagley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 30 Jul 2025 at 10:51.
22 and 24 Oct 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Redlake Road, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 13 May 2025 at 12:42.
27 and 31 Oct 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Pargeter Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 16 Jul 2025 at 13:27.
27 and 31 Oct 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Pargeter Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Sep 2025 at 11:19.
27 Oct and 7 Nov 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Worcester Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Jun 2025 at 12:40.
27 Oct and 14 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Balds Lane, Lye.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 10:27.
27 Oct and 14 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Balds Lane, Lye.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 16:21.
27 Oct and 14 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Balds Lane, Lye.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 16:15.
27 Oct and 7 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stockwell Avenue, Quarry Bank.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 May 2025 at 10:39.
27 Oct and 7 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Acres Road, Quarry Bank.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 May 2025 at 10:40.
27 and 29 Oct 2025
Dudley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Chase Road, Lower Gornal.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Sep 2025 at 10:31.
27 Oct and 21 Nov 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Dudley Road, Himley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 20 Jun 2025 at 15:18.
27 Oct and 21 Nov 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Dudley Road, Himley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 09:34.
27 and 31 Oct 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Common Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Jul 2025 at 12:25.
29 and 31 Oct 2025
Severn Trent Water are proposing to carry out New service connection on Hob Green Road, Wollescote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 28 Aug 2025 at 13:27.
3 and 5 Nov 2025
BT are proposing to carry out Utility asset works on Gayfield Avenue, Brierley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Aug 2025 at 13:17.
3 and 5 Nov 2025
BT are proposing to carry out Utility asset works on Gayfield Avenue, Brierley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Aug 2025 at 10:25.
3 Nov and 1 Dec 2025
Cadent Gas were proposing to carry out Utility asset works on Cedar Road, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:10.
3 Nov and 1 Dec 2025
Cadent Gas were proposing to carry out Utility asset works on Bluebell Road, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:11.
3 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Coleridge Rise, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 15:54.
3 and 7 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hermit Street, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Aug 2025 at 15:44.
3 and 7 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alderwood Rise, Upper Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Aug 2025 at 15:36.
5 and 19 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Musk Lane West, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:29.
5 and 7 Nov 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stourbridge Road, Himley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 30 Jul 2025 at 16:28.
7 and 14 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cedar Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 19 Aug 2025 at 11:00.
8 and 24 Nov 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Wolverhampton Road, Cookley, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 13 Aug 2025 at 10:46.
10 and 28 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Hackmans Gate Lane, Hackmans Gate, Clent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 12:01.
10 and 28 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Road, Clent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:13.
10 and 21 Nov 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Western Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 22 Aug 2025 at 16:47.
10 and 21 Nov 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Western Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 26 Aug 2025 at 11:42.
10 and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Rosemary Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:15.
10 and 12 Nov 2025
South Staffordshire Water were proposing to carry out Utility repair and maintenance works on Stone Lane, Kinver.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 14 Aug 2025 at 09:28.
10 and 14 Nov 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Hill Street, Quarry Bank.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Sep 2025 at 08:40.
10 and 14 Nov 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wood Hill Drive, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 1 Aug 2025 at 10:06.
10 and 14 Nov 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Planks Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 1 Aug 2025 at 09:50.
10 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Brownswall Road, Sedgley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 11:06.
10 Nov and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Brownswall Road, Sedgley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 14:38.
11 and 25 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Western Road, Hagley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 25 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 12:46.
11 Nov 2025 and 1 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Brettell Lane, Brierley Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 1 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 14:27.
11 and 14 Nov 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Ryder Street, Wordsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 15 Aug 2025 at 08:45.
11 and 13 Nov 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Summer Lane, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 12 Aug 2025 at 11:02.
12 and 28 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cradley Road, Netherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 19 Aug 2025 at 11:11.
12 and 30 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Summerfield Avenue, Wall Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 12 Aug 2025 at 10:30.
12 and 30 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Foundry Road, Wall Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 12 Aug 2025 at 10:37.
12 and 30 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Grenville Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 12 Aug 2025 at 10:43.
13 Nov and 30 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Mendip Road, Hayley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 11:30.
15 and 23 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stakenbridge Lane, Churchill, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Aug 2025 at 11:24.
15 and 24 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stakenbridge Lane, Churchill, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Aug 2025 at 11:13.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Churchill Lane, Churchill, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 16:30.
17 Nov and 5 Dec 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Norton Road, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Sep 2025 at 11:31.
17 and 21 Nov 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 14:32.
17 and 21 Nov 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Heronsgate Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 14:32.
17 and 19 Nov 2025
Severn Trent Water were proposing to carry out New service connection on King William Street, Amblecote.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway and footpath.
This roadwork event was last updated by Severn Trent Water on 13 Aug 2025 at 11:55.
17 and 19 Nov 2025
Severn Trent Water are proposing to carry out New service connection on King William Street, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Aug 2025 at 11:33.
17 and 19 Nov 2025
Severn Trent Water are proposing to carry out New service connection on King William Street, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Aug 2025 at 13:29.
17 and 21 Nov 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 14:49.
17 and 24 Nov 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Pool House Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Aug 2025 at 13:48.
17 and 28 Nov 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on High Street, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Aug 2025 at 09:23.
17 and 28 Nov 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Maypole Street, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Aug 2025 at 09:22.
18 and 20 Nov 2025
South Staffordshire Water are proposing to carry out Remedial works on Cottage Street, Brierley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 26 Aug 2025 at 12:49.
19 Nov and 3 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 09:56.
19 Nov and 9 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Gervase Drive, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 09:04.
19 Nov 2025 and 30 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on The Straits, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:21.
19 Nov and 3 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Coleridge Rise, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:22.
19 Nov and 3 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Browning Road, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:22.
19 Nov and 3 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Byron Croft, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:22.
19 Nov and 3 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on High Arcal Road, Lower Gornal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:19.
20 Nov and 5 Dec 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stream Road, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 19 Aug 2025 at 12:37.
24 Nov 2025 and 2 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Leys Road, Brockmoor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 11:00.
24 Nov and 2 Dec 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Monteagle Drive, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 1 Sep 2025 at 11:19.
24 and 26 Nov 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stourbridge Road, Himley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 26 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 11:26.
24 and 28 Nov 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ounsdale Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Aug 2025 at 15:08.
25 Nov and 5 Dec 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Berkeley Drive, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 19 Aug 2025 at 12:42.
26 Nov 2025 and 24 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Hambleton Road, Hayley Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 24 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 15:30.
26 and 28 Nov 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chase Road, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Sep 2025 at 10:24.
28 Nov and 5 Dec 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Charlecote Drive, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 1 Sep 2025 at 12:36.
1 and 15 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Crown Lane, Iverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 14:01.
1 and 15 Dec 2025
Cadent Gas were proposing to carry out Utility asset works on Priory Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 15 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:09.
1 and 15 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Masefield Road, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:00.
1 and 4 Dec 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Aug 2025 at 15:42.
Roadworks Map near to Cornwall Road, STOURBRIDGE, DY8 4TJ (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Cornwall Road, STOURBRIDGE, DY8 4TJ (13 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.