ROADWORKS SUMMARY
Church Road, DUDLEY, DY3 4PD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Church Road, DY3 4PD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Church Road, DUDLEY, DY3 4PD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Church Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Church Hill

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Hill, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:34.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mill Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:35.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Level Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Level Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:49.

Western Power Distribution (West Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Russells Hall Road

Western Power Distribution (West Midlands) are carrying out Utility repair and maintenance works on Russells Hall Road, Dudley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Jan 2025 at 12:22.

Cadent Gas logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Springhill Lane

Cadent Gas are carrying out Utility asset works on Springhill Lane, Lower Penn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:40 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 08:57.

Staffordshire County Council logo
LONG TERM
Between
13 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Stone Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Stone Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 09:42.

Cadent Gas logo
LONG TERM
Between
15 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Mount Road

Cadent Gas are proposing to carry out Utility asset works on Mount Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
LONG TERM
Between
15 Jan and 28 Apr 2025
Details
View Map
Share
Mount Road

Cadent Gas were proposing to carry out Utility asset works on Mount Road, Penn, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 15:30.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lavender Road

Cadent Gas are carrying out Utility asset works on Lavender Road, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 08:30 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 08:32.

Cadent Gas logo
LONG TERM
Between
22 Jan and 11 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:47.

Cadent Gas logo
Between
24 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Leys Road

Cadent Gas are proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:52.

Staffordshire County Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
The Compa

Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:37.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are carrying out Utility repair and maintenance works on Vicarage Road, Amblecote.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:32 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:34.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:32.

Cadent Gas logo
Until
14 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are carrying out Utility asset works on Vicarage Road, Wollaston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 08:40 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 08:50.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:49.

Cadent Gas logo
Until
14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are carrying out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 09:04.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lavender Road

Cadent Gas are proposing to carry out Utility asset works on Lavender Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:04.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Humphrey Street

Cadent Gas are carrying out Utility repair and maintenance works on Humphrey Street, Lower Gornal.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 January 2025 at 18:39 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 07:30.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manor Road

Cadent Gas are proposing to carry out Utility asset works on Manor Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manor Road

Cadent Gas are proposing to carry out Utility asset works on Manor Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:31.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hinstock Close

Cadent Gas are proposing to carry out Utility asset works on Hinstock Close, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hinstock Close

Cadent Gas are proposing to carry out Utility asset works on Hinstock Close, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:29.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Enville Road

Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 09:19.

Cadent Gas logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Pennine Way

Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:19.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hyde Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 08:21.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Smout Crescent

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Smout Crescent, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 12:03.

Severn Trent Water logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Pugh Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Pugh Road, Wolverhampton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Jan 2025 at 12:28.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Showell Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Showell Lane, Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 08:34.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Grendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:56.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Grendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:51.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bridgnorth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgnorth Road, Trescott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 08:21.

Cadent Gas logo
LONG TERM
Between
5 Feb and 30 Jun 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.

Cadent Gas logo
LONG TERM
Between
5 Feb and 30 Jun 2025
Details
View Map
Share
Narrowboat Way

Cadent Gas were proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:42.

Cadent Gas logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.

Severn Trent Water logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Firs Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Firs Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 13:30.

Severn Trent Water logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Firs Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Firs Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Jan 2025 at 07:47.

Severn Trent Water logo
Between
5 and 12 Feb 2025
Details
View Map
Share
Chapel Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Chapel Lane, Smestow.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:59.

Cadent Gas logo
Between
7 Feb and 6 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:46.

Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Studley Gate

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Studley Gate, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Nov 2024 at 12:02.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Pennine Way

Cadent Gas are proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:20.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Pennine Way

Cadent Gas are proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 07:28.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:42.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:57.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Lawnswood Road

Cadent Gas were proposing to carry out Utility asset works on Lawnswood Road, Wordsley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 15:10.

Severn Trent Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Brickbridge Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brickbridge Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 15:44.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lamb Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:32.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 11:09.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Bratch Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bratch Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 08:21.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Langley Road

Staffordshire County Council were proposing to carry out Highway improvement works on Langley Road, Lower Penn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:22.

Western Power Distribution (West Midlands) logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Bridgnorth Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bridgnorth Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Nov 2024 at 16:24.

Western Power Distribution (West Midlands) logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Bridgnorth Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bridgnorth Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Nov 2024 at 12:09.

Western Power Distribution (West Midlands) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Redwood Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 11:06.

Western Power Distribution (West Midlands) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Redwood Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 08:35.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Bridgnorth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgnorth Road, Stourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Jan 2025 at 13:09.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:26.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 09:26.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:13.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ounsdale Road

Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:01.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ounsdale Road

Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 08:51.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 09:56.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 11:13.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wodehouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wodehouse Lane, Gospel End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 27 Jan 2025 at 09:01.

Cadent Gas logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Hilston Avenue

Cadent Gas are proposing to carry out Utility asset works on Hilston Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:49.

Cadent Gas logo
Between
20 Feb and 10 Mar 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Brockmoor.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:39.

Cadent Gas logo
Between
21 and 28 Feb 2025
Details
View Map
Share
Follow
Sandhurst Drive

Cadent Gas are proposing to carry out Utility asset works on Sandhurst Drive, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:45.

Cadent Gas logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:41.

Staffordshire County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Morfe Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Morfe Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 17:30.

Staffordshire County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Morfe Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Morfe Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:22.

Cadent Gas logo
Between
24 Feb and 19 Mar 2025
Details
View Map
Share
Upper Ettingshall Road

Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:09.

Cadent Gas logo
Between
28 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Sandringham Road

Cadent Gas are proposing to carry out Utility asset works on Sandringham Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Severn Trent Water logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Seagers Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Seagers Lane, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 08:52.

Cadent Gas logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Clifton Street

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Clifton Street, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 11:51.

Severn Trent Water logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Eversley Grove

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Eversley Grove, Sedgley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Jan 2025 at 15:55.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Pattingham Road

Staffordshire County Council are proposing to carry out Highway improvement works on Pattingham Road, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 09:02.

Severn Trent Water logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Brickbridge Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brickbridge Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 14:29.

Staffordshire County Council logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Wodehouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wodehouse Lane, Gospel End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 6 Jan 2025 at 11:07.

Cadent Gas logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:59.

Staffordshire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
The Warings

Staffordshire County Council are proposing to carry out Highway improvement works on The Warings, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Jan 2025 at 10:25.

Staffordshire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Orton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Orton Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Jan 2025 at 10:25.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Kidderminster Road

Staffordshire County Council are proposing to carry out Highway improvement works on Kidderminster Road, Stourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 15:51.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Bridgnorth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgnorth Road, Stourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 15:07.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Bridgnorth Road

Staffordshire County Council were proposing to carry out Highway improvement works on Bridgnorth Road, Stourton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 14:35.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Prestwood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Prestwood Road, Stourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 16:07.

Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Southalls Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Southalls Lane, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Dec 2024 at 07:53.

Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Southalls Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Southalls Lane, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Dec 2024 at 14:09.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Six Ashes Road

Staffordshire County Council are proposing to carry out Highway improvement works on Six Ashes Road, Halfpenny Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 12:38.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Wombourne Park

Staffordshire County Council are proposing to carry out Highway improvement works on Wombourne Park, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
The Warings

Staffordshire County Council are proposing to carry out Highway improvement works on The Warings, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 08:58.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
The Warings

Staffordshire County Council are proposing to carry out Highway improvement works on The Warings, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 15:52.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Orton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Orton Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 08:58.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Orton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Orton Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 15:52.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Showell Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Showell Lane, Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 09:44.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Dene Road

Staffordshire County Council are proposing to carry out Highway improvement works on Dene Road, Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Dene Road

Staffordshire County Council are proposing to carry out Highway improvement works on Dene Road, Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 16:25.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Greyhound Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Greyhound Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 14:48.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Radford Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Radford Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Dec 2024 at 11:06.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Langley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Langley Road, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Jan 2025 at 12:45.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Radford Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Radford Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Bridgnorth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgnorth Road, Trescott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 15:45.

Between
24 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Maidensbridge Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Maidensbridge Road, Wall Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 14 Jan 2025 at 15:01.

Cadent Gas logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out New service connection on Vicarage Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 13:01.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Radford Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Radford Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:54.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Radford Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Radford Lane, Lower Penn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Dec 2024 at 16:05.

Severn Trent Water logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Ounsdale Road

Severn Trent Water were proposing to carry out New service connection on Ounsdale Road, Wombourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 April 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Jan 2025 at 13:12.

Cadent Gas logo
Between
4 and 15 Apr 2025
Details
View Map
Share
Follow
Elm Dale Road

Cadent Gas are proposing to carry out Utility asset works on Elm Dale Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:07.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Kidderminster Road

Staffordshire County Council were proposing to carry out Highway improvement works on Kidderminster Road, Stourton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 14:35.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Prestwood Road

Staffordshire County Council were proposing to carry out Highway improvement works on Prestwood Road, Stourton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Jan 2025 at 14:20.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Hyde Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 12:52.

Cadent Gas logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Planet Road

Cadent Gas are proposing to carry out New service connection on Planet Road, Brockmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 09:48.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
High Street

Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 12:15.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Ashford Bank

BT are proposing to carry out Utility repair and maintenance works on Ashford Bank, Claverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Jan 2025 at 15:12.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Bratch Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bratch Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 12:15.

Staffordshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Langley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Langley Road, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 15:00.

South Staffordshire Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
High Street

South Staffordshire Water were proposing to carry out Utility repair and maintenance works on High Street, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 17 Jan 2025 at 12:10.

South Staffordshire Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
High Street

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on High Street, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 28 Jan 2025 at 14:54.

South Staffordshire Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Bent Street

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Bent Street, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 6 Jan 2025 at 13:51.

Cadent Gas logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Lawnswood Road

Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 08:00.

Cadent Gas logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Lawnswood Road

Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 12:36.

South Staffordshire Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Wallows Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Wallows Road, Brockmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 7 Jan 2025 at 13:11.

Staffordshire County Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Six Ashes Road

Staffordshire County Council are proposing to carry out Highway improvement works on Six Ashes Road, Halfpenny Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 11:39.

Western Power Distribution (West Midlands) logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Draycott

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Draycott, Claverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Jan 2025 at 15:57.

Staffordshire County Council logo
Between
17 Apr and 5 May 2025
Details
View Map
Share
Follow
Pool House Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Pool House Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Jan 2025 at 09:51.

Staffordshire County Council logo
Between
17 Apr and 5 May 2025
Details
View Map
Share
Follow
Ounsdale Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Ounsdale Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Jan 2025 at 10:11.

Staffordshire County Council logo
Between
17 Apr and 5 May 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on School Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Jan 2025 at 10:20.

Staffordshire County Council logo
Between
21 and 26 Apr 2025
Details
View Map
Share
Follow
Bridgnorth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgnorth Road, Stourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 10:52.

Staffordshire County Council logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Trysull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Jan 2025 at 15:38.

Cadent Gas logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Follow
Bhylls Lane

Cadent Gas are proposing to carry out Utility asset works on Bhylls Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 12:09.

Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Springfield Grove

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Springfield Grove, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 29 Jan 2025 at 12:14.

Severn Trent Water logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Ounsdale Road

Severn Trent Water are proposing to carry out New service connection on Ounsdale Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 09:46.

Cadent Gas logo
Between
28 Apr and 19 May 2025
Details
View Map
Share
Elmdale Road

Cadent Gas were proposing to carry out Utility asset works on Elmdale Road, Coseley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 14:02.

Murphy Power Distribution logo
Between
28 Apr and 9 May 2025
Details
View Map
Share
Follow
Beacon Lane

Murphy Power Distribution are proposing to carry out New service connection on Beacon Lane, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 29 Jan 2025 at 11:29.

Staffordshire County Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Dene Road

Staffordshire County Council are proposing to carry out Highway improvement works on Dene Road, Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 10:23.

Severn Trent Water logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Heath Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heath Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Jan 2025 at 07:58.

Cadent Gas logo
LONG TERM
Between
30 Apr and 25 Jun 2025
Details
View Map
Share
Follow
South Road

Cadent Gas are proposing to carry out Utility asset works on South Road, Norton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 25 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 14:19.

Cadent Gas logo
Between
30 Apr and 21 May 2025
Details
View Map
Share
Elmdale Road

Cadent Gas were proposing to carry out Utility asset works on Elmdale Road, Coseley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 21 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 14:02.

Cadent Gas logo
Between
30 Apr and 21 May 2025
Details
View Map
Share
Follow
Elmdale Road

Cadent Gas are proposing to carry out Utility asset works on Elmdale Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 16:01.


Roadworks Map near to Church Road, DUDLEY, DY3 4PD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 2 Feb 2025 08:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Church Road, DUDLEY, DY3 4PD (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
WATERDALE 
(0.9 miles)
Last Mile Gas
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 27 Jan 2025 - 7 Feb 2025
0.9
Details
Share
Follow
2
WATERDALE 
(0.9 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 27 Jan 2025 - 7 Feb 2025
0.9
Details
Share
Follow
3
Staffordshire County Council logo
WATERDALE 
(0.9 miles)
Staffordshire County Council
Highway improvement works - Carriageway - Give and take
In Progress
Since: 23 Jan 2025 09:08
(Scheduled: 20 Jan 2025 - 5 Feb 2025)
0.9
Details
Share
Follow
4
Staffordshire County Council logo
WATERDALE 
(0.9 miles)
Staffordshire County Council
Highway improvement works - Carriageway - Give and take
Planned
Scheduled: 2 Feb 2025 - 7 Feb 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.