ROADWORKS SUMMARY
Blakeley Walk, DUDLEY, DY2 0HY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Blakeley Walk, DY2 0HY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Blakeley Walk, DUDLEY, DY2 0HY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Blakeley Walk are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Trindle Road

Transport for West Midlands (TfWM) are carrying out roadworks on Trindle Road, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2023 at 16:30 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:24.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Birmingham Street

Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Birmingham Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2023 at 00:01 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:03.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
King Street

Transport for West Midlands (TfWM) are carrying out roadworks on King Street, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 November 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 2 Sep 2024 at 08:50.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
King Street

Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on King Street, Dudley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 November 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:23.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Birmingham Street

Transport for West Midlands (TfWM) are carrying out roadworks on Birmingham Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:03.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Station Drive

Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Station Drive, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:02.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Church Hill

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Hill, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:34.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mill Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:35.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Level Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Level Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:49.

LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Trindle Road

Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Trindle Road, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 08:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 Nov 2024 at 15:09.

LONG TERM
Until
8 Jun 2025
Details
View Map
Share
Follow
St Joseph Street

Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on St Joseph Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2024 at 11:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 May 2024 at 10:56.

National Highways logo
LONG TERM
Until
11 Sep 2025
Details
View Map
Share
Follow
Wolverhampton Road

National Highways are carrying out Highway repair and maintenance works on Wolverhampton Road, Oldbury.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 00:01 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Aug 2024 at 09:57.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
26 Aug 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Bayswater Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bayswater Road, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:48.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
26 Aug 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Bayswater Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bayswater Road, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:28.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Farmer Way

Cadent Gas are carrying out Utility asset works on Farmer Way, Tipton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 13:57.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
The Broadway

Transport for West Midlands (TfWM) are carrying out Works for road purposes on The Broadway, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:24.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are carrying out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 12:37 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:38.

Western Power Distribution (West Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Finchley Close

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Finchley Close, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:49.

Western Power Distribution (West Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Finchley Close

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Finchley Close, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:29.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
7 Oct 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Railway Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Railway Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Sep 2024 at 13:57.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
14 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Bagnall Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Bagnall Street, Golds Hill, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 13 Sep 2024 at 10:53.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
14 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Bagnall Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Bagnall Street, Golds Hill, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Oct 2024 at 08:39.

Birmingham City Council logo
LONG TERM
Between
15 Oct 2024 and 15 Oct 2025
Details
View Map
Share
Follow
Pembridge Close

Birmingham City Council are proposing to carry out Highway improvement works on Pembridge Close, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 15 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Birmingham City Council on 12 Jul 2024 at 12:37.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Wealdstone Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wealdstone Drive, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:50.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Wealdstone Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wealdstone Drive, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dunstall Road

Cadent Gas are carrying out Utility asset works on Dunstall Road, Halesowen.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:57.

Western Power Distribution (West Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Matty Road

Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Matty Road, Oldbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 11:54.

Birmingham City Council logo
LONG TERM
Between
30 Oct 2024 and 30 Oct 2025
Details
View Map
Share
Follow
Conway Avenue

Birmingham City Council are proposing to carry out Highway improvement works on Conway Avenue, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 30 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Birmingham City Council on 13 Aug 2024 at 13:05.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are carrying out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 15:52.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 11:17.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are carrying out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:04.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
4 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
George Henry Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on George Henry Road, Tipton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2024 at 15:29.

Sandwell Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Birmingham Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Birmingham Road, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 22 Aug 2024 at 13:08.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Cemetery Road

Cadent Gas are carrying out Utility asset works on Cemetery Road, Oldbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 11:30 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:00.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Gibbet Lane

Severn Trent Water were proposing to carry out New service connection on Gibbet Lane, Whittington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 16:45.

Cadent Gas logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Buckingham Road

Cadent Gas are carrying out Utility asset works on Buckingham Road, Rowley Regis.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 08:25.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Europa Avenue

Cadent Gas are carrying out Utility asset works on Europa Avenue, West Bromwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 12:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 11:47.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
School Road

Cadent Gas are carrying out Utility asset works on School Road, Himley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 09:15.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:00.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are carrying out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 09:53.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Majestic Way

Cadent Gas are carrying out Utility asset works on Majestic Way, Rowley Regis.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:25.

Finishing
Friday
Details
View Map
Share
Follow
Maple Road

GTC Pipelines are carrying out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 12 Dec 2024 at 12:15.

Indigo Power logo
Finishing
Friday
Details
View Map
Share
Follow
Maple Road

Indigo Power are carrying out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 11 Dec 2024 at 07:27.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
26 Nov 2024 and 15 Jan 2025
Details
View Map
Share
Groveland Road

Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Groveland Road, Tipton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 15 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 10:44.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Powke Lane

Cadent Gas are carrying out Utility repair and maintenance works on Powke Lane, Rowley Regis.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 13:23 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:05.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
20 Jan 2025
Details
View Map
Share
Follow
George Henry Road

Western Power Distribution (West Midlands) are carrying out Utility asset works on George Henry Road, Tipton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 November 2024 at 07:45 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 09:09.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Bluebell Road

Cadent Gas were proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:27.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Bluebell Road

Cadent Gas are proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:31.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Central Drive

Cadent Gas are proposing to carry out Utility asset works on Central Drive, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2024 at 12:59.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ross

Cadent Gas are carrying out Utility asset works on Ross, Rowley Regis.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 14:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 11:42.

Sandwell Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Claremont Street

Sandwell Metropolitan Borough Council are proposing to carry out Works for road purposes on Claremont Street, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Sep 2024 at 14:45.

ESP Electricity logo
Between
9 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Birmingham Road

ESP Electricity were proposing to carry out Utility asset works on Birmingham Road, Dudley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 23 Oct 2024 at 08:46.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:54.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
9 Dec 2024 and 27 Jun 2025
Details
View Map
Share
Railway Street

Transport for West Midlands (TfWM) were proposing to carry out Works for road purposes on Railway Street, Tipton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Dec 2024 at 11:38.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
George Henry Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on George Henry Road, Tipton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 30 Oct 2024 at 13:43.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Danks Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Danks Way, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Nov 2024 at 14:11.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 12:32.

Cadent Gas logo
Between
12 and 27 Dec 2024
Details
View Map
Share
Follow
Briery Road

Cadent Gas are proposing to carry out Utility asset works on Briery Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Factory Road

Cadent Gas are carrying out Utility repair and maintenance works on Factory Road, Tipton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 15:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:21.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Coppice Street

Cadent Gas are carrying out Utility asset works on Coppice Street, Tipton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 15:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:20.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
12 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Brecknock Road

Western Power Distribution (West Midlands) were proposing to carry out roadworks on Brecknock Road, West Bromwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Dec 2024 at 09:14.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
12 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Trotters Lane

Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Trotters Lane, West Bromwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Dec 2024 at 09:13.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
12 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Hill Top

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hill Top, West Bromwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2024 at 15:14.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
12 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Hill Top

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hill Top, West Bromwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Nov 2024 at 14:10.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Hill Top

Western Power Distribution (West Midlands) are carrying out Utility asset works on Hill Top, West Bromwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 17:05 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Dec 2024 at 12:20.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
13 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Dudley Road West

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dudley Road West, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Nov 2024 at 12:06.

Western Power Distribution (West Midlands) logo
Finishing
Saturday
Details
View Map
Share
Follow
Swindon Road

Western Power Distribution (West Midlands) are carrying out Utility repair and maintenance works on Swindon Road, Greensforge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 December 2024 at 11:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 14:14.

Finishing
Tomorrow
Details
View Map
Share
Follow
Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Farm Road, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Sep 2024 at 10:05.

Finishing
Tomorrow
Details
View Map
Share
Follow
Farm Road

Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Farm Road, Netherton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 11:25 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Dec 2024 at 13:20.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
16 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Hainge Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hainge Road, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Nov 2024 at 12:06.

Sandwell Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Powis Avenue

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Powis Avenue, Tipton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 6 Dec 2024 at 14:12.

Sandwell Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Powis Avenue

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Powis Avenue, Tipton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Dec 2024 at 09:48.

Finishing
Monday
Details
View Map
Share
Follow
Poplar Crescent

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Crescent, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 08:58.

Finishing
Monday
Details
View Map
Share
Follow
Poplar Crescent

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Crescent, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 10:51.

Cadent Gas logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:42.

Sandwell Metropolitan Borough Council logo
Between
3 and 24 Jan 2025
Details
View Map
Share
Follow
Trinity Way

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Trinity Way, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 22 Oct 2024 at 11:34.

Sandwell Metropolitan Borough Council logo
Between
3 and 24 Jan 2025
Details
View Map
Share
Follow
High Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on High Street, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 22 Oct 2024 at 16:04.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 09:54.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:29.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 08:22.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Banners Lane

Cadent Gas are proposing to carry out Utility asset works on Banners Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 11:33.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Barrack Lane

Cadent Gas were proposing to carry out Utility asset works on Barrack Lane, Cradley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:58.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Engine Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Engine Lane, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 10:00.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Engine Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Engine Lane, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 08:36.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Somerset Drive

Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 12:48.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tack Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:05.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tack Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 11:22.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Narrowboat Way

Cadent Gas were proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:40.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Stony Lane

Cadent Gas are proposing to carry out Utility asset works on Stony Lane, Smethwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Europa Avenue

Cadent Gas are proposing to carry out Utility asset works on Europa Avenue, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 12:59.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Paganel Drive

Cadent Gas are proposing to carry out Utility asset works on Paganel Drive, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:37.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Earl Street

Cadent Gas are proposing to carry out New service connection on Earl Street, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:55.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Earl Street

Cadent Gas are proposing to carry out New service connection on Earl Street, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:35.

Western Power Distribution (West Midlands) logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Tipton Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Nov 2024 at 11:07.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Bluebell Road

Cadent Gas are proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:39.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:47.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bridge Street

Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 11:57.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2024 at 11:36.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Newhall Street

Cadent Gas are proposing to carry out Utility asset works on Newhall Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:29.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Newhall Street

Cadent Gas are proposing to carry out Utility asset works on Newhall Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 00:10.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Princes End, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:54.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Hopton Close

Cadent Gas are proposing to carry out Utility asset works on Hopton Close, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:49.

Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Barrack Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barrack Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Oct 2024 at 07:09.

Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Blue Ball Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Blue Ball Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Oct 2024 at 07:13.

Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Old Hall Close

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Close, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:38.

Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Old Hall Close

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Close, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 12:08.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
9 Jan and 1 Oct 2025
Details
View Map
Share
Follow
Trindle Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Trindle Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Nov 2024 at 08:33.

Network Rail logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Bromford Road

Network Rail were proposing to carry out Works for Rail Purposes on Bromford Road, West Bromwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 January 2025 and run through until 18 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 12:00.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Hagley Road West Service Road From Outside 488 To 558

Cadent Gas were proposing to carry out New service connection on Hagley Road West Service Road From Outside 488 To 558, Oldbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:12.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Somerset Drive

Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:10.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Firth Park Crescent

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Firth Park Crescent, Halesowen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 18 Sep 2024 at 13:29.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Firth Park Crescent

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Firth Park Crescent, Halesowen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Oct 2024 at 13:47.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Oldbury Road

BT are proposing to carry out Utility asset works on Oldbury Road, Rowley Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 10:57.

Cadent Gas logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Queens Road

Cadent Gas are proposing to carry out Utility asset works on Queens Road, Smethwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2024 at 08:03.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Lilac Road

Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:32.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Lilac Road

Cadent Gas were proposing to carry out Utility asset works on Lilac Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:31.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Laburnum Road

Cadent Gas are proposing to carry out Utility asset works on Laburnum Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:03.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Laburnum Road

Cadent Gas are proposing to carry out Utility asset works on Laburnum Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:10.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:33.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Maple Road

Cadent Gas were proposing to carry out Utility asset works on Maple Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:36.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Horseley Heath

Cadent Gas were proposing to carry out New service connection on Horseley Heath, Tipton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:04.

Western Power Distribution (West Midlands) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Tinsley Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Tinsley Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Nov 2024 at 14:49.

Western Power Distribution (West Midlands) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Whitehall Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Whitehall Road, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Nov 2024 at 14:49.

Sandwell Metropolitan Borough Council logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Malthouse Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Malthouse Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 18 Sep 2024 at 14:13.

Cadent Gas logo
LONG TERM
Between
17 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Banners Lane

Cadent Gas are proposing to carry out Utility asset works on Banners Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 10:14.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Randle Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Randle Road, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:19.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Randle Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Randle Road, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 07:46.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Pennine Way

Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:47.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
James Scott Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on James Scott Road, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 11:57.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:11.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.

Sandwell Metropolitan Borough Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Birchley Park Avenue

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birchley Park Avenue, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 29 Nov 2024 at 08:39.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:52.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
20 Jan and 19 Mar 2025
Details
View Map
Share
Follow
Bagnall Street

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bagnall Street, Golds Hill, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2024 at 15:28.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
20 Jan and 19 Mar 2025
Details
View Map
Share
Follow
Bagnall Street

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bagnall Street, Golds Hill, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Nov 2024 at 14:09.

Western Power Distribution (West Midlands) logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Danks Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Danks Way, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2024 at 15:27.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Princes End, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2024 at 10:21.

Cadent Gas logo
LONG TERM
Between
21 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.

Cadent Gas logo
Between
21 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.

South Staffordshire Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Long Innage

South Staffordshire Water are proposing to carry out Remedial works on Long Innage, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 10:43.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Oak Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 14:35.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Oak Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 11:33.

Western Power Distribution (West Midlands) logo
Between
21 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tipton Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 09:04.

Western Power Distribution (West Midlands) logo
Between
21 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tipton Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 14:06.

Cadent Gas logo
LONG TERM
Between
22 Jan and 11 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:47.

Cadent Gas logo
LONG TERM
Between
22 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Brandon Way

Cadent Gas are proposing to carry out Utility asset works on Brandon Way, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 14:40.

Cadent Gas logo
Between
24 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Old Ham Lane

Cadent Gas are proposing to carry out Utility asset works on Old Ham Lane, Pedmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:38.

Cadent Gas logo
Between
24 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Leys Road

Cadent Gas are proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:52.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:32.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:49.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 12:19.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Oldbury Road

BT are proposing to carry out Utility asset works on Oldbury Road, Rowley Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 11:42.

Sandwell Metropolitan Borough Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Park Avenue

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Avenue, Rowley Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Nov 2024 at 16:00.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:07.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Reservoir Road

Cadent Gas are proposing to carry out Utility asset works on Reservoir Road, Rowley Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 15:16.

Cadent Gas logo
Between
27 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Balmoral Way

Cadent Gas are proposing to carry out Utility asset works on Balmoral Way, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 10:56.

Transport for West Midlands (TfWM) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Duncan Edwards Way

Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Dec 2024 at 11:07.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Groveland Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Groveland Road, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 11:59.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Oak Road

Cadent Gas are proposing to carry out Utility asset works on Oak Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:48.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lavender Road

Cadent Gas are proposing to carry out Utility asset works on Lavender Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:04.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lavender Road

Cadent Gas are proposing to carry out Utility asset works on Lavender Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:10.

Cadent Gas logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:04.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
High Arcal Road

Staffordshire County Council are proposing to carry out Highway improvement works on High Arcal Road, Himley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:54.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Priory Road

Cadent Gas were proposing to carry out Utility asset works on Priory Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:42.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Priory Road

Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:22.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
27 Jan and 5 Mar 2025
Details
View Map
Share
Follow
Danks Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Danks Way, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 13:18.

G2 Energy IDNO logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Dean Street

G2 Energy IDNO are proposing to carry out New service connection on Dean Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Nov 2024 at 13:05.

G2 Energy IDNO logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Dean Street

G2 Energy IDNO are proposing to carry out New service connection on Dean Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Nov 2024 at 08:59.

Cadent Gas logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Pennine Way

Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:19.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
Park Street West

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Park Street West, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.

Sandwell Metropolitan Borough Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Halesowen Street

Sandwell Metropolitan Borough Council were proposing to carry out Highway improvement works on Halesowen Street, Rowley Regis.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 19 Aug 2024 at 09:47.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
Halesowen Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Halesowen Street, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:25.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
High Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on High Street, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
Birmingham Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Birmingham Road, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
Oldbury Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Oldbury Road, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Manor Road

Cadent Gas are proposing to carry out Utility asset works on Manor Road, Smethwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 12:44.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Margaret Gardens

Cadent Gas are proposing to carry out Utility asset works on Margaret Gardens, Smethwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 15:30.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Margaret Gardens

Cadent Gas were proposing to carry out Utility asset works on Margaret Gardens, Smethwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:03.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Margaret Gardens

Cadent Gas are proposing to carry out Utility asset works on Margaret Gardens, Smethwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 12:45.

Cadent Gas logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 11:36.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Bridge Street

Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:33.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:34.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Smout Crescent

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Smout Crescent, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:17.

Severn Trent Water logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Pugh Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pugh Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:26.

South Staffordshire Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Trinity Street

South Staffordshire Water are proposing to carry out Remedial works on Trinity Street, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 13 Dec 2024 at 15:22.

South Staffordshire Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Station Road

South Staffordshire Water were proposing to carry out Remedial works on Station Road, Oldbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 13 Dec 2024 at 15:01.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
4 Feb and 5 May 2025
Details
View Map
Share
Follow
Bagnall Street

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bagnall Street, Golds Hill, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Nov 2024 at 09:40.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
4 Feb and 5 May 2025
Details
View Map
Share
Follow
New Street

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on New Street, Hill Top, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Nov 2024 at 11:03.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
4 Feb and 5 May 2025
Details
View Map
Share
Follow
New Street

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on New Street, Hill Top, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 13:22.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
4 Feb and 5 May 2025
Details
View Map
Share
Follow
Harvills Hawthorn

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Harvills Hawthorn, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Nov 2024 at 09:15.

Cadent Gas logo
LONG TERM
Between
5 Feb and 30 Jun 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.

Cadent Gas logo
LONG TERM
Between
5 Feb and 30 Jun 2025
Details
View Map
Share
Narrowboat Way

Cadent Gas were proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:42.

Cadent Gas logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.

Severn Trent Water logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Firs Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Firs Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 13:30.

Cadent Gas logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Albion Road

Cadent Gas are proposing to carry out Utility asset works on Albion Road, Greets Green, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 14:40.

Cadent Gas logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:40.

Cadent Gas logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Sussex Avenue

Cadent Gas are proposing to carry out Utility asset works on Sussex Avenue, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:40.

Sandwell Metropolitan Borough Council logo
Between
6 and 14 Feb 2025
Details
View Map
Share
Follow
Birmingham Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birmingham Road, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 29 Nov 2024 at 08:39.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Europa Avenue

Cadent Gas are proposing to carry out Utility asset works on Europa Avenue, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:27.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Europa Avenue

Cadent Gas were proposing to carry out Utility asset works on Europa Avenue, West Bromwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 13 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 16:19.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Long Innage

Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:50.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:08.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:49.

Cadent Gas logo
Between
7 Feb and 6 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:46.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
10 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Hamilton Avenue

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hamilton Avenue, Halesowen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Sep 2024 at 07:25.

Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Studley Gate

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Studley Gate, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Nov 2024 at 12:02.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Furnace Hill

Cadent Gas are proposing to carry out Utility asset works on Furnace Hill, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:51.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Pennine Way

Cadent Gas are proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:20.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:42.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:57.

South Staffordshire Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
High Street

South Staffordshire Water were proposing to carry out Utility repair and maintenance works on High Street, Cradley Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 12 Nov 2024 at 09:21.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Lawnswood Road

Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 07:31.

Cadent Gas logo
Between
10 and 26 Feb 2025
Details
View Map
Share
Follow
Albright Road

Cadent Gas are proposing to carry out Utility asset works on Albright Road, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:31.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Cole Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cole Street, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 15:01.

Cadent Gas logo
LONG TERM
Between
10 Feb and 30 May 2025
Details
View Map
Share
Follow
Buckingham Road

Cadent Gas are proposing to carry out Utility asset works on Buckingham Road, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 12:34.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Priory Close

Cadent Gas are proposing to carry out Utility asset works on Priory Close, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:05.

Cadent Gas logo
LONG TERM
Between
10 Feb and 31 Jul 2025
Details
View Map
Share
Follow
Europa Avenue

Cadent Gas are proposing to carry out Utility asset works on Europa Avenue, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:04.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Oak Road

Cadent Gas are proposing to carry out Utility asset works on Oak Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:30.

Western Power Distribution (West Midlands) logo
Between
10 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Dudley Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dudley Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 16 Dec 2024 at 15:42.

Western Power Distribution (West Midlands) logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
New Street

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on New Street, Hill Top, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2024 at 15:14.

Sandwell Metropolitan Borough Council logo
Between
12 and 19 Feb 2025
Details
View Map
Share
Follow
Causeway Green Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Causeway Green Road, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 10 Dec 2024 at 15:22.

Western Power Distribution (West Midlands) logo
Between
13 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Dudley Road West

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dudley Road West, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 12:11.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
13 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Harvills Hawthorn

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Harvills Hawthorn, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2024 at 15:27.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
13 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Harvills Hawthorn

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Harvills Hawthorn, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Nov 2024 at 14:08.

Sandwell Metropolitan Borough Council logo
Between
14 and 18 Feb 2025
Details
View Map
Share
Follow
Titford Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Titford Road, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Dec 2024 at 10:11.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Follow
Worcester Lane

Network Rail are proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Worcester Lane

Network Rail were proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Follow
Redlake Road

Network Rail are proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Redlake Road

Network Rail were proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Racecourse Lane

Network Rail were proposing to carry out Works for Rail Purposes on Racecourse Lane, Norton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 11:00.

South Staffordshire Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Grange Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Grange Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 23 Sep 2024 at 14:37.

Western Power Distribution (West Midlands) logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Manor Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Manor Lane, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Dec 2024 at 12:49.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Furnace Hill

Cadent Gas are proposing to carry out Utility asset works on Furnace Hill, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:18.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Smethwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:25.

Cadent Gas logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Stony Lane

Cadent Gas are proposing to carry out Utility asset works on Stony Lane, Smethwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:39.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
17 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Castle Hill

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Castle Hill, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Dec 2024 at 11:50.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
17 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Castle Hill

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Castle Hill, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Dec 2024 at 10:32.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:26.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:27.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:48.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 10:57.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 11:55.

Western Power Distribution (West Midlands) logo
Between
17 and 26 Feb 2025
Details
View Map
Share
Follow
Birmingham New Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Birmingham New Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Dec 2024 at 11:57.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:24.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:16.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Sussex Avenue

Cadent Gas are proposing to carry out Utility asset works on Sussex Avenue, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:19.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Birmingham New Road

Cadent Gas are proposing to carry out Utility asset works on Birmingham New Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:09.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Long Innage

Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:39.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:13.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:40.

Western Power Distribution (West Midlands) logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hainge Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hainge Road, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 12:30.

Worcestershire County Council logo
Between
20 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Park Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 14:56.

Worcestershire County Council logo
Between
20 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Park Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 11 Nov 2024 at 09:59.

Worcestershire County Council logo
Between
20 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Hall Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 13:13.

Worcestershire County Council logo
Between
20 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Hall Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 13 Nov 2024 at 15:39.

Cadent Gas logo
Between
20 Feb and 10 Mar 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Brockmoor.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:39.

Cadent Gas logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:45.

Cadent Gas logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:41.

Cadent Gas logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Lilac Road

Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:47.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lilac Road

Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 10:56.

Transport for West Midlands (TfWM) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Sedgley Road East

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Sedgley Road East, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Dec 2024 at 12:01.

Cadent Gas logo
Between
24 Feb and 19 Mar 2025
Details
View Map
Share
Upper Ettingshall Road

Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:09.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Upper Ettingshall Road

Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:35.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Upper Ettingshall Road

Cadent Gas are proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 16:44.

Cadent Gas logo
LONG TERM
Between
26 Feb and 6 May 2025
Details
View Map
Share
Follow
St Pauls Road

Cadent Gas are proposing to carry out Utility asset works on St Pauls Road, Smethwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
26 Feb and 6 May 2025
Details
View Map
Share
Follow
St Pauls Road

Cadent Gas are proposing to carry out Utility asset works on St Pauls Road, Smethwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:14.

Cadent Gas logo
Between
27 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Blackthorne Road

Cadent Gas are proposing to carry out Utility asset works on Blackthorne Road, Smethwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:28.

Cadent Gas logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:14.

Cadent Gas logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:41.

Cadent Gas logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:00.

Cadent Gas logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:43.

Severn Trent Water logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Seagers Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Seagers Lane, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 08:52.

Cadent Gas logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Smethwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 14:40.

Cadent Gas logo
LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Stony Lane

Cadent Gas were proposing to carry out Utility asset works on Stony Lane, Smethwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:26.

Cadent Gas logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Brandon Way

Cadent Gas are proposing to carry out Utility asset works on Brandon Way, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 09:13.

ESP Electricity logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Castlegate Drive

ESP Electricity are proposing to carry out Utility asset works on Castlegate Drive, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ESP Electricity on 11 Dec 2024 at 10:55.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Albion Road

Cadent Gas are proposing to carry out Utility asset works on Albion Road, Greets Green, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 09:12.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Lilac Road

Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:09.

South Staffordshire Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Castle Mill Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Castle Mill Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 3 Dec 2024 at 12:42.

Cadent Gas logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Clifton Street

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Clifton Street, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 11:51.

Severn Trent Water logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Eversley Grove

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Eversley Grove, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 10:01.

Cadent Gas logo
Between
4 and 31 Mar 2025
Details
View Map
Share
Follow
Upper Ettingshall Road

Cadent Gas are proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:03.

Cadent Gas logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
St Marks Road

Cadent Gas are proposing to carry out Utility asset works on St Marks Road, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:10.

South Staffordshire Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
High Haden Crescent

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on High Haden Crescent, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 15 Nov 2024 at 13:47.

Cadent Gas logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:28.

Cadent Gas logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Oak Road

Cadent Gas are proposing to carry out Utility asset works on Oak Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:15.

Cadent Gas logo
Between
10 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Priory Road

Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:28.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:33.

Cadent Gas logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Central Drive

Cadent Gas were proposing to carry out Utility asset works on Central Drive, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:39.

South Staffordshire Water logo
Between
14 and 16 Mar 2025
Details
View Map
Share
Follow
Halesowen Road

South Staffordshire Water are proposing to carry out Remedial works on Halesowen Road, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 9 Dec 2024 at 08:57.

Severn Trent Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Compton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Compton Road, Pedmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 14:42.

Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Southalls Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Southalls Lane, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Dec 2024 at 07:53.

Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Southalls Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Southalls Lane, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Dec 2024 at 14:09.

Cadent Gas logo
LONG TERM
Between
17 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Central Drive

Cadent Gas are proposing to carry out Utility asset works on Central Drive, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 10:00.

Cadent Gas logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Meadow Lane

Cadent Gas are proposing to carry out Utility asset works on Meadow Lane, Lanesfield, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:00.


Roadworks Map near to Blakeley Walk, DUDLEY, DY2 0HY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Blakeley Walk, DUDLEY, DY2 0HY (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
YEW TREE HILLS 
(0.0 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
12 Dec 2024 21:46 - 16 Dec 2024 14:34
0.0
Details
Share
2
Virgin Media logo
MARRIOTT ROAD 
(0.1 miles)
Virgin Media
New service connection - Footway - No carriageway incursion
Complete
17 Dec 2024 13:07 - 13:39
0.1
Details
Share
3
Virgin Media logo
QUEENS GARDENS 
(0.3 miles)
Virgin Media
New service connection - Footway - No carriageway incursion
Complete
17 Dec 2024 14:12 - 14:52
0.3
Details
Share
4
Western Power Distribution (West Midlands) logo
CINDER BANK 
(0.5 miles)
Western Power Distribution (West Midlands)
New service connection - Footway - No carriageway incursion
In Progress
Since: 16 Dec 2024 13:20
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.5
Details
Share
Follow
5
MAJOR
  
FARM ROAD 
(0.5 miles)
Dudley Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 16 Dec 2024 - 19 Dec 2024
0.5
Details
Share
Follow
6
MAJOR
  
FARM ROAD 
(0.5 miles)
Dudley Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 16 Dec 2024 11:25
(Scheduled: 16 Dec 2024 - 19 Dec 2024)
0.5
Details
Share
Follow
7
South Staffordshire Water logo
ST GEORGES ROAD 
(0.8 miles)
South Staffordshire Water
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 19 Dec 2024 - 23 Dec 2024
0.8
Details
Share
Follow
8
Sandwell Metropolitan Borough Council logo
MAJOR
  
CLAREMONT STREET 
(0.9 miles)
Sandwell Metropolitan Borough Council
Works for road purposes - Footway - Road closure
Planned
Scheduled: 9 Dec 2024 - 20 Dec 2024
0.9
Details
Share
Follow
9
Sandwell Metropolitan Borough Council logo
MAJOR
  
CLAREMONT STREET 
(0.9 miles)
Sandwell Metropolitan Borough Council
Works for road purposes - Footway - Road closure
Complete
10 Sep 2024 09:00 - 17 Sep 2024 15:00
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.